Lessons Learned from the Project Management Simulation I am a senior project manager at Delphi Printers & Peripherals, a small electronics and computer peripheral manufacturer based In Santa Clara, California. I have been tasked with assembling and directing a product design team to develop a new and innovative consumer printer. Delphi has Intelligence suggesting that a competitor Is launching a printer with similar features and capabilities in 6 months, putting pressure on me and my team to develop a new printer that can compete effectively against the competitor's offering.
This project management simulation is more about R, since there are 1000 points in total, before I have started the simulation, my plan was to gain at least the basic 800 points and then find some ways to get the extra
...200 points. After I have gone through the simulation, I find that it is too hard to get even the basic 800 points since there are full of trade-off among target scope, schedule, cost and morale. I have run this simulation for several times, each time I have to face some trade-off.
If I want to gain full or even extra points from target scope part, which Indicates more man-hour to input and heavier workload, I have to assign more upper-level workers to participate into the project, which means, of course, more cost. What's more, since I do not want to change the target schedule, I have to encourage workers to work overtime and push them hard and these actions will definitely reduce my point in morale part.
If I want to come out an upper-level product while without rise the cost sharply,
just outsource extensively and use more lower-level workers, if I choose to go this way, I may have to face the dilemma that falling to meet the target schedule. If I want to keep the cost behind the target, I can only come out level 2 product, which just meet the management target at the end of week 18, the expected deadline for this project. No matter which strategy do I choose, the workers still feel at least middle level of pressure and easily get frustrated by some issues or co-workers' mistakes.
Therefore I never get full points from the morale part. In conclusion, my best result is 774 out of 1000 points, I have lost 20 points in target cost part and 6 points In morale part, since I decided to take a more conservative strategy, I have gotten no extra points. If I had a chance to manage a project Like this In the future, I would evaluate each criteria importance based on the specific situation and then decide which one is and the quality of the product the most.
- Chief Executive Officer essays
- Convenience Store essays
- Firm essays
- Training And Development essays
- Unilever essays
- Variable Cost essays
- Virgin Group essays
- Bargaining essays
- Entity essays
- Pest analysis essays
- John Locke essays
- 9/11 essays
- A Good Teacher essays
- A Healthy Diet essays
- A Modest Proposal essays
- A&P essays
- Academic Achievement essays
- Achievement essays
- Achieving goals essays
- Admission essays
- Advantages And Disadvantages Of Internet essays
- Alcoholic drinks essays
- Ammonia essays
- Analytical essays
- Ancient Olympic Games essays
- APA essays
- Arabian Peninsula essays
- Argument essays
- Argumentative essays
- Art essays
- Atlantic Ocean essays
- Auto-ethnography essays
- Autobiography essays
- Ballad essays
- Batman essays
- Binge Eating essays
- Black Power Movement essays
- Blogger essays
- Body Mass Index essays
- Book I Want a Wife essays
- Boycott essays
- Breastfeeding essays
- Bulimia Nervosa essays
- Business essays
- Business Process essays
- Canterbury essays
- Carbonate essays
- Catalina de Erauso essays
- Cause and Effect essays
- Cesar Chavez essays