Project
answer
A project is "a temporary endeavor undertaken to create a unique product, service, or result."*
question
Operations
answer
Operations is work done to sustain the business.
question
Project Attributes
answer
A project: Has a unique purpose. Is temporary. Is developed using progressive elaboration or in an iterative fashion. Requires resources, often from various areas. Should have a primary customer or sponsor. The project sponsor usually provides the direction and funding for the project. Involves uncertainty.
question
The Triple Constraint
answer
Scope: What work will be done as part of the project? What unique product, service, or result does the customer or sponsor expect from the project? Time: How long should it take to complete the project? What is the project's schedule? Cost: What should it cost to complete the project? What is the project's budget?
question
What is Project Management?
answer
Project management is "the application of knowledge, skills, tools and techniques to project activities to meet project requirements."*
question
Project Stakeholders
answer
Stakeholders are the people involved in or affected by project activities. Stakeholders include: The project sponsor The project manager The project team Support staff Customers Suppliers Opponents to the project
question
Different ways to define project success
answer
The project met scope, time, and cost goals. The project satisfied the customer/sponsor. The project produced the desired results.
question
What is a Program?
answer
A program is: "a group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually."* A program manager provides leadership and direction for the project managers heading the projects within the program.
question
Project portfolio management
answer
Project portfolio management is an emerging business strategy in which organizations group and manage projects and programs as a portfolio of investments that contribute to the entire enterprise's success.
question
Leader
answer
A leader focuses on long-term goals and big-picture objectives while inspiring people to reach those goals.
question
Manager
answer
A manager deals with the day-to-day details of meeting specific goals.
question
Strategic planning
answer
Strategic planning involves determining long-term objectives by analyzing the strengths and weaknesses of an organization, studying opportunities and threats in the business environment, predicting future trends, and projecting the need for new products and services. Strategic planning provides important information to help organizations identify and then select potential projects.
question
SWOT Analysis
answer
SWOT analysis involves analyzing Strengths, Weaknesses, Opportunities, and Threats. It can help you identify potential projects, as is shown in the example about four people trying to start a new business.
question
Pyramid for the Project Selection Process
answer
Strategic Planning: Determine organizational strategy, goals, and objectives. Business area analysis: Analyze how various business areas can help achieve strategic goals Project Planning: Identify potential projects to help meet strategic goals. Resource Allocation: Allocate resources to selected projects.
question
Methods for Selecting Projects
answer
Focus on competitive strategy and broad organizational needs. Perform net present value analysis or other financial projections. Use a weighted scoring model. Implement a balanced scorecard. Address problems, opportunities, and directives. Consider project time frame. Consider project priority.
question
Performing Financial Projections
answer
Financial considerations are often an important aspect of the project selection process. Three important methods include: Net present value analysis Return on investment Payback analysis
question
Net Present Value Analysis
answer
Net present value (NPV) analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time. NPV means the return from a project exceeds the opportunity cost of capital—the return available by investing the capital elsewhere. Projects with higher NPVs are preferred to projects with lower NPVs if all other factors are equal
question
Steps for Calculating NPV
answer
Determine the estimated costs and benefits for the life of the project and the products it produces. Determine the discount rate. A discount rate is the rate used in discounting future cash flows. The annual discount factor is a multiplier for each year based on the discount rate and year (calculated as 1/(1+r)t, where r is the discount rate, and t is the year). Calculate the net present value by subtracting the total discounted costs from the total discounted benefits.
question
Return on Investment
answer
Return on investment (ROI) is the result of subtracting the project costs from the benefits and then dividing by the costs. For example, if you invest $100 today and next year your investment is worth $110, your ROI is ($110 - 100)/100, or 0.10 (10 percent). Note that the ROI is always a percentage, and the higher the ROI, the better. Many organizations have a required rate of return for projects—the minimum acceptable rate of return on an investment. You can find the internal rate of return (IRR) by finding what discount rate results in an NPV of zero for the project.
question
Payback Analysis
answer
Payback period is the amount of time it will take to recoup—in the form of net cash inflows—the total dollars invested in a project. Payback analysis determines how much time will lapse before accrued benefits overtake accrued and continuing costs. Payback occurs in the year when the cumulative benefits minus costs reach zero. The shorter the payback period, the better.
question
Weighted Scoring Models
answer
A weighted scoring model is a tool that provides a systematic process for selecting projects based on many criteria. To create a weighted scoring model: Identify criteria important to the project selection process. Assign a weight to each criterion (so they add up to 100 percent). Assign numerical scores to each criterion for each project. Calculate the weighted scores by multiplying the weight for each criterion by its score and adding the resulting values.
question
Implementing a Balanced Scorecard
answer
A balanced scorecard is a methodology that converts an organization's value drivers—such as customer service, innovation, operational efficiency, and financial performance—to a series of defined metrics.
question
Problems, Opportunities, and Directives
answer
Problems are undesirable situations that prevent an organization from achieving its goals. These problems can be current or anticipated. Opportunities are chances to improve the organization. Directives are new requirements imposed by management, government, or some external influence.
question
Project Time Frame
answer
Another approach to project selection is based on the time it will take to complete a project or the date by which it must be done. For example, some potential projects must be finished within a specific time period. If they cannot be finished by this set date, they are no longer valid projects. Some projects can be completed very quickly—within a few weeks, days, or even minutes. However, even though many projects can be completed quickly, it is still important to prioritize them.
question
Five Levels of Project Portfolio Management
answer
Put all of your projects in one list. Prioritize the projects in your list. Divide your projects into several categories based on types of investment. Automate the list. Apply modern portfolio theory, including risk-return tools that map project risks.
question
Project Management Process Groups
answer
Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling activities, and closing activities. A process is a series of actions directed toward a particular result.
question
Description of Process Groups
answer
Initiating processes include actions to begin or end projects and project phases. Planning processes include devising and maintaining a workable scheme to ensure that the project meets its scope, time, and cost goals as well as organizational needs. Executing processes include coordinating people and other resources to carry out the project plans and produce the deliverables of the project or phase. A deliverable is a product or service produced or provided as part of a project. Monitoring and controlling processes measure progress toward achieving project goals, monitor deviation from plans, and take corrective action to match progress with plans and customer expectations. Closing processes include formalizing acceptance of the project or phase and bringing it to an orderly end.
question
Phase
answer
A phase is a distinct stage in project development, and most projects have distinct phases.
question
Methodology
answer
A methodology describes how things should be done, and different organizations often have different ways of doing things.
question
Champion
answer
Some projects have a senior manager called a champion who acts as a key proponent for a project.
question
How Top Managers Can Help Project Managers Succeed
answer
Provide adequate resources. Approve unique project needs in a timely manner. Encourage cooperation from people in other parts of the organization and deal with political issues. Mentor and coach them on leadership issues. Develop and enforce organizational standards. Support a Project Management Office (PMO).
question
Project Management Office (PMO)
answer
A project management office (PMO) is an organizational entity created to assist project managers in achieving project goals. A PMO can help development standards and methodologies, provide career paths for project managers, and assist project managers with training and certification.
question
Initiating Tasks
answer
Identify and understand project stakeholders. Prepare a business case for the project (if needed). Create the project charter. Hold a kick-off meeting. Develop a preliminary scope statement.
question
Project stakeholders
answer
Project stakeholders are the people involved in or affected by project activities.
question
Stakeholder Analysis
answer
A stakeholder analysis provides information about key stakeholders to help manage relationships with them. Includes the following information: Names and organizations of key stakeholders Their roles on the project: Unique facts about each stakeholder Their levels of interest in the project Their influence on the project Suggestions for managing relationships with each stakeholder Because a stakeholder analysis often includes sensitive information, it should not be part of the official project plans, which are normally available for all stakeholders to review.
question
Preparing a Business Case for the Project
answer
Successful organizations initiate projects to meet business needs, and a common business need is to spend money wisely. A business case is a document that provides justification for investing in a project. The Phase I project provided a wealth of information to help write a business case for the Phase II project. It is a good idea to have one of the company's financial managers review the information for accuracy.
question
Contents of a Business Case
answer
Introduction/Background Business Objective Current Situation and Problem/Opportunity Statement Critical Assumptions and Constraints Analysis of Options and Recommendation Preliminary Project Requirements Budget Estimate and Financial Analysis Schedule Estimate Potential Risks Exhibits
question
Creating a Project Charter
answer
A project charter is a document that formally recognizes the existence of a project and provides a summary of the project's objectives and management. It authorizes the project manager to use organizational resources to complete the project. Ideally, the project manager will play a major role in developing the project charter. Instead of project charters, some organizations initiate projects using a simple letter of agreement or formal contracts. A crucial part of the project charter is the sign-off section.
question
kick-off meeting
answer
A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans. Often used to get support for a project and clarify roles and responsibilities. The project champion should speak first and introduce the project sponsor and project manager. Often a fair amount of work is done to prepare for the meeting.
question
Developing a Preliminary Scope Statement
answer
A scope statement is a document used to develop and confirm a common understanding of the project scope. It describes in detail the work to be accomplished and is an important tool for preventing scope creep—the tendency for project scope to continually increase. It is helpful to create a preliminary, or initial, scope statement during project initiation so that the entire project team can start important discussions and work related to the project scope. There are usually several versions, and each one becomes more detailed as the project progresses and more information becomes available.
question
Contents of a Scope Statement
answer
Contents and length will vary based on the project. Typical contents include: The product or service requirements and characteristics A summary of all deliverables The project success criteria References to related documents
question
Project Planning
answer
Project Planning Should Guide Project Execution. Planning is often the most difficult and unappreciated process in project management. Often, people do not want to take the time to plan well, but theory and practice show that good planning is crucial to good execution.
question
Project integration management
answer
Project integration management involves coordinating all the project management knowledge areas throughout a project's life span. The main planning tasks include: Creating a team contract Developing the project management plan
question
Team contracts
answer
Team contracts help promote teamwork and clarify team communications. The process normally includes the core project team members reviewing a template and then working in small groups to prepare inputs for their team contract. The project manager should act as a coach or facilitator, observing the different personalities of team members and seeing how well they work together. Everyone involved in creating the team contract should sign it, and as new project team members are added, the project manager should review ground rules with them and have them read and sign the contract as well.
question
Topics Covered in a Team Contract
answer
Code of conduct Participation Communication Problem solving Meeting guidelines
question
Project Management Plans
answer
A project management plan is a document used to coordinate all project planning documents and to help guide a project's execution and control.
question
Baseline
answer
A baseline is a starting point, a measurement, or an observation that is documented so that it can be used for future comparison; also defined as the original project plan plus approved changes.
question
Attributes of Project Management Plans
answer
Project management plans should be dynamic, flexible, and receptive to change when the environment or project changes. Just as projects are unique, so are project plans. For a small project involving a few people over a couple of months, a project charter, team contract, scope statement, and Gantt chart might be the only project planning documents needed; there would not be a need for a separate project management plan. A large project involving 100 people over three years would benefit from having a detailed project management plan and separate plans for each knowledge area. It is important to tailor all planning documentation to fit the needs of specific projects.
question
Common Elements in Project Management Plans
answer
Introduction/overview of the project Project organization Management and technical processes Work to be performed Schedule information Budget information References to other project planning documents
question
Project scope management
answer
Project scope management involves defining and controlling what work is or is not included in a project. The main planning tasks include scope planning, scope definition, and creating the WBS. The main documents produced are a scope management plan, scope statement, WBS, and WBS dictionary.
question
Scope Planning and the Scope Management Plan
answer
A project's size, complexity, importance, as well as other factors affect how much effort is spent on scope planning. The main output of scope planning is a scope management plan, which is a document that includes descriptions of how the team will prepare the scope statement, create the WBS, verify completion of the project deliverables, and control requests for changes to the project scope.
question
Work Breakdown Structure (WBS)
answer
A work breakdown structure (WBS) is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. The WBS is a document that breaks all the work required for the project into discrete tasks, and groups those tasks into a logical hierarchy. Often shown in two different forms: Chart form Tabular form
question
Work Packages
answer
A work package is a task at the lowest level of the WBS. It represents the level of work that the project manager monitors and controls. You can think of work packages in terms of accountability and reporting.
question
WBS dictionary
answer
A WBS dictionary is a document that describes each WBS task in detail.
question
Scope Baseline
answer
The approved project scope statement and its associated WBS and WBS dictionary form the scope baseline. Performance in meeting project scope goals is based on the scope baseline.
question
Project time management
answer
Project time management involves the processes required to ensure timely completion of a project. The main planning tasks performed include activity definition, activity sequencing, activity resource estimating, activity duration estimating, and schedule development. The main documents produced are an activity list and attributes, a milestone list, a network diagram, the activity resource requirements, the activity duration estimates, and a project schedule.
question
Activity List
answer
The activity list is a tabulation of activities to be included on a project schedule. It should include the activity name, an activity identifier or number, and a brief description of the activity
question
Attributes
answer
The activity attributes provide schedule-related information about each activity, such as predecessors, successors, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and assumptions related to the activity. Both should be in agreement with the WBS and WBS dictionary and be reviewed by key project stakeholders.
question
Milestone
answer
A milestone is a significant event in a project. It often takes several activities and a lot of work to complete a milestone, but the milestone itself is like a marker to help identify necessary activities. There is usually no cost or duration for a milestone. Project sponsors and senior managers often focus on major milestones when reviewing projects.
question
Activity Sequencing
answer
Activity sequencing involves reviewing the activity list and attributes, project scope statement, and milestone list to determine the relationships or dependencies between activities. A dependency or relationship relates to the sequencing of project activities or tasks. For example, does a certain activity have to be finished before another one can start? Can the project team do several activities in parallel? Can some overlap? Activity sequencing has a significant impact on developing and managing a project schedule.
question
Mandatory dependencies
answer
Mandatory dependencies are inherent in the nature of the work being performed on a project. You cannot hold training classes until the training materials are ready.
question
Discretionary dependencies
answer
Discretionary dependencies are defined by the project team. A project team might follow good practice and not start detailed design work until key stakeholders sign off on all of the analysis work.
question
External dependencies
answer
External dependencies involve relationships between project and non-project activities. The installation of new software might depend on delivery of new hardware from an external supplier. Even though the delivery of the new hardware might not be in the scope of the project, it should have an external dependency added to it because late delivery will affect the project schedule
question
Network Diagrams
answer
Network diagrams are the preferred technique for showing activity sequencing. A network diagram is a schematic display of the logical relationships among, or sequencing of, project activities. In the activity-on-arrow (AOA) approach, or the arrow diagramming method (ADM), activities are represented by arrows and connected at points called nodes (starting and ending point of an activity) to illustrate the sequence of activities; only show finish-to-start dependencies (most common type of dependency). The precedence diagramming method (PDM) is a network diagramming technique in which boxes represent activities. These are more widely used as they can show all dependency types.
question
Bursts
answer
Bursts occur when two or more activities follow a single node.
question
Merge
answer
A merge occurs when two or more nodes precede a single node.
question
Duration
answer
Duration includes the actual amount of time spent working on an activity plus elapsed time. For example, even though it might take one workweek or five workdays to do the actual work, the duration estimate might be two weeks to allow extra time needed to obtain outside information or to allow for resource availability.
question
Effort
answer
Effort is the number of workdays or work hours required to complete a task. A duration estimate of one day could be based on eight hours of work or eighty hours of work.
question
Discrete, Range, and Three-Point Estimates
answer
Duration estimates are often provided as discrete estimates, such as four weeks. A range estimate might be between three and five weeks. A three-point estimate is an estimate that includes an optimistic, most likely, and pessimistic estimate, such as three, four, and five weeks.
question
Program Evaluation and Review Technique (PERT)
answer
Program Evaluation and Review Technique (PERT) is a network analysis technique used to estimate project duration when there is a high degree of uncertainty about the individual activity duration estimates.
question
PERT weighted average
answer
PERT weighted average = optimistic time+4Ă—most likely time+ pessimistic time
question
Critical Path Analysis
answer
Critical path method (CPM)—also called critical path analysis—is a network diagramming technique used to predict total project duration. A critical path for a project is the series of activities that determine the earliest time by which the project can be completed. It is the longest path through the network diagram and has the least amount of slack or float. Slack or float is the amount of time an activity may be delayed without delaying a succeeding activity or the project finish date. The longest path or the path containing the critical tasks is what is driving the completion date for the project.
question
What Does the Critical Path Really Mean?
answer
The critical path shows the shortest time in which a project can be completed.
question
Crashing
answer
Crashing is a technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost. If two critical tasks each take two weeks, and it will take $100 to shorten Task 1 by a week and $1,000 to shorten Task 2 by a week, shorten Task 1.
question
Fast tracking
answer
Fast tracking involves doing activities in parallel that you would normally do in sequence. Instead of waiting for Task 1 to be totally finished before starting Task 2, start Task 2 when Task 1 is halfway done.
question
Project buffer
answer
A project buffer is additional time added before the project's due date to account for unexpected factors.
question
Project cost management
answer
Project cost management includes the processes required to ensure that a project team completes a project within an approved budget. The main planning tasks are cost estimating and cost budgeting. The main documents produced include a cost estimate and a cost baseline.
question
Analogous estimates
answer
Analogous estimates, also called top-down estimates, use the actual cost of a previous, similar project as the basis for estimating the cost of the current project. This technique requires a good deal of expert judgment and is generally less costly than others are, but it can also be less accurate.
question
Bottom-up estimates
answer
Bottom-up estimates involve estimating individual activities and summing them to get a project total. This approach can increase the accuracy of the cost estimate, but it can also be time intensive and, therefore, expensive to develop.
question
Parametric modeling
answer
Parametric modeling uses project characteristics (parameters) in a mathematical model to estimate project costs.
question
Cost Budgeting
answer
Project cost budgeting involves allocating the project cost estimate to tasks over time. The tasks are based on the work breakdown structure for the project. The main goal of the cost budgeting process is to produce a cost baseline, or time-phased budget, that project managers use to measure and monitor cost performance.
question
Economies of Scale
answer
Economies of scale means when a company gain cost advantages with increasing level of production. With increased level of production, a company can purchase source material in bulk with cheaper price, thus decreases the cost of production, and see increases in profits.
question
FTE (Full-Time Equivalent)
answer
FTE is a unit that measures the ratio by calculating the hours of one or more part-time employees that compare to one full time employee. In a simple word, one FTE is equivalent to one full time worker. For example, if a company have two employees that works 30 hours per week, total up to 60 hours per week. Assuming a full time employee works 45 hours per week, the FTE for the company is 60 divided by 45, which is 1.3.
question
J-I-T (Just in time)
answer
Just in time is an inventory strategy that is also known as the Toyota Production System (TPS), developed by Toyota. It aims to increase efficiency and decrease waste by receiving or purchasing goods only as they are needed in the production process, thus reducing inventory costs. The main waste that JIT aims to eliminate are, • Waste of overproduction (largest waste) • Waste of time on hand (waiting) • Waste of transportation • Waste of processing itself • Waste of stock at hand • Waste of movement • Waste of making defective products
question
Luddite
answer
According to the dictionary, Luddite means one who is opposed to any innovative changes and especially technological change. In the early 19th century, One group of English workmen destroying laborsaving machinery as a protest because they sense the threat that the machinery will cause the demise of their trade. Nowadays, Luddite generally means people who are afraid of change, oppose to any changes that would change the way he or she does thing,
question
ERP (Enterprise resource planning system)
answer
Enterprise resource planning (ERP) is business management software—typically a suite of integrated applications—that a company can use to collect, store, manage and interpret data from many business activities, including: • Product planning, cost • Manufacturing or service delivery • Marketing and sales • Inventory management • Shipping and payment ERP provides an integrated view of core business processes, often in real-time, using common databases maintained by a database management system.
question
Productivity
answer
Productivity is an average measure of the efficiency of production. It can be expressed as the ratio of output to inputs used in the production process, i.e. output per unit of input. When all outputs and inputs are included in the productivity measure it is called total productivity. Outputs and inputs are defined in the total productivity measure as their economic values. The value of outputs minus the value of inputs is a measure of the income generated in a production process. It is a measure of total efficiency of a production process and as such the objective to be maximized in production process.
question
Monte Carlo Methods
answer
Monte Carlo methods (or Monte Carlo experiments) are a broad class of computational algorithms that rely on repeated random sampling to obtain numerical results. They are often used in physical and mathematical problems and are most useful when it is difficult or impossible to use other mathematical methods.
question
Mandatory dependencies
answer
Mandatory dependencies are inherent in the nature of the work being performed on a project. You cannot hold training classes until the training materials are ready. External dependencies involve relationships between project and non-project activities. The installation of new software might depend on delivery of new hardware from an external supplier. Even though the delivery of the new hardware might not be in the scope of the project, it should have an external dependency added to it because late delivery will affect the project schedule
question
Discretionary dependencies
answer
Discretionary dependencies are defined by the project team. A project team might follow good practice and not start detailed design work until key stakeholders sign off on all of the analysis work.
question
Project quality management
answer
Project quality management ensures that the project will satisfy the stated or implied needs for which it was undertaken.
question
quality
answer
"the degree to which a set of inherent characteristics fulfill requirements"
question
Conformance to requirements
answer
Conformance to requirements means that the project's processes and products meet written specifications.
question
Fitness for use
answer
Fitness for use means that a product can be used as it was intended.
question
Quality planning
answer
Quality planning includes identifying which quality standards are relevant to the project and how best to satisfy those standards.
question
metric
answer
A metric is a standard of measurement. They allow organizations to measure their performance in certain areas and to compare them over time or with other organizations. Examples of common metrics used by organizations include failure rates of products produced, availability of goods and services, and customer satisfaction ratings.
question
checklist
answer
A checklist is a list of items to be noted or consulted. It helps project teams verify that a set of required topics or steps has been covered or performed. A single project can have many different checklists, such as for: Interviewing project team members Selecting suppliers Reviewing important documents Ensuring a room is ready for training
question
Project human resource management
answer
Project human resource management is concerned with making effective use of the people involved with a project.
question
project organizational chart
answer
Similar to a company's organizational chart, a project organizational chart is a graphic representation of how authority and responsibility is distributed within the project. The size and complexity of the project determines how simple or complex the organizational chart is.
question
responsibility assignment matrix (RAM)
answer
A responsibility assignment matrix (RAM) is a matrix that maps the work of the project as described in the work breakdown structure (WBS) to the people responsible for performing the work. For smaller projects, it is best to assign WBS activities to individuals; for larger projects, it is more effective to assign the work to organizational units or teams.
question
RACI charts
answer
RACI charts are a type of RAM that show Responsibility, Accountability, Consultation, and Informed roles for project stakeholders.
question
resource histogram
answer
A resource histogram is a column chart that shows the number of resources required for or assigned to a project over time. In planning project staffing needs, senior managers often create a resource histogram in which columns represent the number of people needed in each skill category. By stacking the columns, you can see the total number of people needed each month. After resources are assigned to a project, you can view a resource histogram for each person to see how his/her time has been allocated
question
staffing management plan
answer
A staffing management plan describes when and how people will be added to and removed from a project. It describes the types of people needed to work on the project, the numbers needed for each type of person each month, and how these resources will be acquired, trained, rewarded, and reassigned after the project.
question
Project communications management
answer
Project communications management involves generating, collecting, disseminating, and storing project information. Key outputs include a communications management plan and a project Web site.
question
Project Risk Management Planning
answer
PMI defines a project risk as an uncertainty that can have a negative or positive effect on meeting project objectives. Key outputs of project risk management planning include a risk management plan, a probability/impact matrix, a risk register, and risk-related contractual agreements.
question
Risk Management Plans
answer
A risk management plan documents the procedures for managing risk throughout the life of a project. The general topics that a risk management plan should address include the methodology for risk management, roles and responsibilities, budget and schedule estimates for risk-related activities, risk categories, probability and impact matrices, and risk documentation.
question
Contingency plans
answer
Contingency plans are predefined actions that the project team will take if an identified risk event occurs.
question
Fallback plans
answer
Fallback plans are developed for risks that have a high impact on meeting project objectives, and are put into effect if attempts to reduce the risk are not effective; sometimes called contingency plans of last resort.
question
Contingency reserves or contingency allowances
answer
Contingency reserves or contingency allowances are funds held by the project sponsor that can be used to mitigate cost or schedule overruns if unknown risks occur.
question
Risk events
answer
Risk events refer to specific, uncertain events that may occur to the detriment or enhancement of the project. You can chart the probability and impact of risk events on a matrix.
question
Negative risk events
answer
Negative risk events include the performance failure of a product produced as part of a project, delays in completing work as scheduled, increases in estimated costs, supply shortages, litigation against the company, and strikes.
question
Positive risk events
answer
Positive risk events include completing work sooner than planned or at an unexpectedly reduced cost, collaborating with suppliers to produce better products, and obtaining good publicity from the project.
question
risk register
answer
A risk register is a document that contains the results of various risk management processes and is often displayed in a table or spreadsheet format. It is a tool for documenting potential risk events and related information, including: An identification number for each risk event A rank for each risk event (usually high, medium, or low) The name of the risk event A description of the risk event The category under which the risk event falls The root cause: The real or underlying reason a problem occurs Triggers: Indicators or symptoms of actual risk events Potential responses to each risk event The risk owner, or person who will own or take responsibility The probability of the risk event occurring The impact to the project if the risk event occurs The status of the risk event
question
Risk-Related Contractual Agreements
answer
Work done by outside suppliers or sellers should be well documented in contracts, which are mutually binding agreements that obligate the seller to provide the specified products or services, and obligate the buyer to pay for them.
question
Procurement Management Plans
answer
A procurement management plan is a document that describes how the procurement processes will be managed, from developing documentation for making outside purchases or acquisitions to contract closure.
question
Types of Contracts
answer
Fixed-price or lump-sum contracts involve a fixed total price for a well-defined product or service. Cost-reimbursable contracts involve payment to the seller for direct and indirect actual costs. Time-and-material contracts are a hybrid of both fixed-price and cost-reimbursable contracts. Unit pricing can also be used in various types of contracts to require the buyer to pay the supplier a predetermined amount per unit of service.
question
Request for Proposal (RFP)
answer
A Request for Proposal (RFP) is a document used to solicit proposals from prospective suppliers.
question
proposal
answer
A proposal is a document in which sellers describe what they will do to meet the requirements of a buyer.
question
Request for Quote (RFQ)
answer
A Request for Quote (RFQ) is a document used to solicit quotes or bids from prospective suppliers.
question
bid
answer
A bid (also called a quote) is a document prepared by sellers providing pricing for standard items that have been clearly defined by the buyer.
question
contract statement of work (SOW)
answer
A contract statement of work (SOW) is a description of the work that is to be purchased. It is a type of scope statement that describes the work in sufficient detail to allow prospective suppliers to determine if they are capable of providing the goods and services required and an appropriate price. It should be clear, concise, and as complete as possible, describe all services required, and include performance information, such as the location and timing of the work.
question
Supplier Evaluation Matrix
answer
After doing a thorough evaluation of potential suppliers, many organizations summarize evaluations using a supplier evaluation matrix—a type of weighted scoring model. Suppliers are often evaluated on criteria related to cost, quality, technology, past performance, and management.
question
groupthink
answer
groupthink—conformance to the values or ethical standards of a group—if there are no conflicting viewpoints on various aspects of a project.
question
Quality assurance
answer
Quality assurance includes all the activities related to satisfying the relevant quality standards for a project. Another goal of quality assurance is continual quality improvement. Key outputs of quality assurance include recommended corrective actions and project plan updates.
question
Benchmarking
answer
Benchmarking generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside of the organization itself (for example, training costs per employee and course ratings are benchmarks).
question
quality audit
answer
A quality audit is a structured review of specific quality management activities that helps identify lessons learned, which could improve performance on current or future projects.
question
Cause-and-effect diagrams
answer
Cause-and-effect diagrams—also called fishbone diagrams (because their structure resembles a fishbone) or Ishikawa diagrams (named after their founder)—can assist in ensuring and improving quality by finding the root causes of quality problems.
question
Motivation
answer
Intrinsic motivation causes people to participate in an activity for their own enjoyment. Extrinsic motivation causes people to do something for a reward or to avoid a penalty.
question
Thamhain and Wilemon's Ways to Have Influence on Projects
answer
1. Authority: The legitimate hierarchical right to issue orders. 2. Assignment: The project manager's perceived ability to influence a worker's later work assignments. 3. Budget: The project manager's perceived ability to authorize others' use of discretionary funds. 4. Promotion: The ability to improve a worker's position. 5. Money: The ability to increase a worker's pay and benefits. 6. Penalty: The project manager's ability to cause punishment. 7. Work challenge: The ability to assign work that capitalizes on a worker's enjoyment of doing a particular task. 8. Expertise: The project manager's perceived special knowledge that others deem important. 9. Friendship: The ability to establish friendly personal relationships between the project manager and others.
question
Stephen Covey's 7 habits
answer
Be proactive. Begin with the end in mind. Put first things first. Think win/win. Seek first to understand, then to be understood. Synergize. Sharpen the saw.
question
empathic listeners
answer
Good project managers are empathic listeners—they listen with the intent to understand.
question
rapport
answer
rapport—a relation of harmony, conformity, accord, or affinity.
question
Mirroring
answer
Mirroring is the matching of certain behaviors of the other person, a technique to help establish rapport.
question
Tuckman Model of Team Development
answer
Forming Storming Norming Performing Adjourning
question
Reward and Recognition Systems
answer
Team-based reward and recognition systems can promote teamwork. Focus on rewarding teams for achieving specific goals. Allow time for team members to mentor and help each other to meet project goals and develop human resources.
question
short list
answer
Often, buyers develop a short list of the top three to five suppliers to reduce the work involved in selecting a source, and they are often asked to prepare a best and final offer (BAFO).
question
Earned value management (EVM)
answer
Earned value management (EVM) is a project performance measurement technique that integrates scope, time, and cost data.
question
planned value (PV)
answer
The planned value (PV) is that portion of the approved total cost estimate planned to be spent on an activity during a given period.
question
actual cost (AC
answer
The actual cost (AC) is the total direct and indirect costs incurred in accomplishing work on an activity during a given period.
question
earned value (EV)
answer
The earned value (EV) is an estimate of the value of the physical work actually completed. It is based on the original planned costs for the activity and the rate at which the team is completing work on the activity to date.
question
rate of performance (RP)
answer
The rate of performance (RP) is the ratio of actual work completed to the percentage of work planned to have been completed at any given time.
question
Earned Value Formulas
answer
EV = PV to date * RP Cost Variance (CV) = EV - AC Schedule Variance(SV) = EV - PV Cost Performance Index (CPI) = EV/AC Schedule Performance Index(SPI) = EV/PV Estimate at Completion (EAC) = BAC(Budget at Completion)/CPI Estimated Time to Complete = Orignal time/SPI
question
Interpreting Earned Value Numbers
answer
In general, negative numbers for cost and schedule variance indicate problems in those areas. Negative numbers mean the project is costing more than planned or taking longer than planned. Likewise, CPI and SPI less than one or less than 100 percent indicate problems.
question
Objectives of Integrated Change Control
answer
Influence the factors that cause changes to ensure that changes are beneficial. Determine that a change has occurred. Manage actual changes as they occur. Note: The project management plan provides the baseline for identifying and controlling project changes.
question
Monitoring and Controlling Tasks for Project Scope Management
answer
The main monitoring and controlling tasks performed as part of project scope management are scope verification and scope control.
question
Scope Creep
answer
Even when the project scope is fairly well defined, many projects suffer from scope creep—the tendency for project scope to grow bigger and bigger.
question
Scope verification
answer
Scope verification involves formal acceptance of the completed project scope by the project sponsor or designated stakeholders. Acceptance is often achieved through customer inspection and then sign-off on key deliverables.
question
Scope Control
answer
You cannot control the scope of a project unless you have first clearly defined the scope and set a scope verification process in place. You also need to develop a process for soliciting and monitoring changes to project scope; stakeholders should be encouraged to suggest beneficial changes and discouraged from suggesting unnecessary changes.
question
Monitoring and Controlling Tasks for Project Time Management
answer
The main monitoring and controlling task performed as part of project time management is schedule control. Project managers often cite delivering projects on time (schedule control) as one of their biggest challenges, because schedule problems often cause more conflict than other issues.
question
No Surprises
answer
Top management hates surprises, so the project manager must be clear and honest in communicating project status. By no means should project managers create the illusion that the project is going fine when, in fact, serious problems have emerged.
question
Monitoring and Controlling Tasks for Project Cost Management
answer
The main monitoring and controlling task performed as part of project cost management is cost control.
question
Monitoring and Controlling for Project Quality Management
answer
The main project quality management task for monitoring and controlling is quality control. Key outputs include quality-control measurements, validated defect repair, and validated deliverables. The main outcomes of this process are acceptance decisions, rework, and process adjustments.
question
Monitoring and Controlling Tasks for Project Human Resource Management
answer
The main human resource management task performed as part of monitoring and controlling a project is managing the project team, which is no small task! Project managers must use their soft skills to find the best way to motivate and manage each team member.
question
Tools and Techniques for Managing Project Teams
answer
Observation and conversation Project performance appraisals Conflict management Issue logs
question
Performance Reporting
answer
Performance reporting keeps stakeholders informed about how resources are being used to achieve project objectives. Status reports describe where the project stands at a specific point in time. Progress reports describe what the project team has accomplished during a certain period. Forecasts predict future project status and progress based on past information and trends.
question
issue
answer
An issue is a matter under question or dispute that could impede project success.
question
issue log
answer
An issue log is a tool used to document and monitor the resolution of project issues.
question
Constructive change orders
answer
Constructive change orders are oral or written acts or omissions by someone with actual or apparent authority that can be construed to have the same effect as a written change order.
question
Contract closure
answer
Contract closure involves completion and settlement of contracts, and resolution of any open items. Two tools to assist in contract closure are: Procurement audits, which help to identify lessons learned in the entire procurement process. A records management system, which provides the ability to easily organize, find, and archive procurement-related documents.
question
Capabilities and Outcomes
answer
Capabilities are incremental steps that lead to best practices, and outcomes are the results of applying capabilities.
question
maturity model
answer
A maturity model is a framework for helping organizations improve their processes and systems.