Flashcards About IT Project Management Mid-Term (ch 1-6)

Unlock all answers in this set

Unlock answers
question
According to the CHAOS studies, which of the following statements about IT projects is true?
answer
Project success is improving because of better project management tools and processes, smaller projects, and improved communication
question
The Socio-Technical Approach focuses on ________
answer
using technology to meet the needs of the business.
question
Assumptions are what we use to estimate scope, schedule and budget and to assess the risks of the project.
answer
True
question
The top factors to project success as reported by the CHAOS studies focus on:
answer
user involvement and executive support
question
According to the CHAOS studies most IT projects are completed on time and on budget.
answer
False
question
Information Technology Projects are organizational investments.
answer
True
question
The project sponsor is ____________.
answer
the client, customer, or organizational manager who acts as the project champion and provides organizational resources and direction.
question
A value-driven approach to project management means _________
answer
Measuring project success in terms of the value the project brings to the organization and not only in terms of meeting the project schedule and budget
question
____ can arise from the estimation process or the stability of the project team
answer
Internal risks
question
The Network era ____________
answer
Began in the 1990s when many organizations sought to regain control of the IT deparment and hired a Chief Data Processing Officer
question
The benefits, described in the text, of using a project management approach to developing information systems include all of the following except:
answer
the coupling of project success to the selection of team members and the skill sets and resources that they bring to the project.
question
During the Network Era, IT projects have focused primarily on the challenge of creating a scalable IT infrastructure to support many partners, strategic alliances, vendors, and customers.
answer
True
question
The technical expert is ____________
answer
provides the technical solution to the organizational problem and may include systems analysts, network specialists, or programmers.
question
A project sponsor is responsible for ensuring that all of the project management and technical development processes are in place and being carried out within a set of specific requirements, defined processes, and quality standards.
answer
False
question
The Socio-Technical Approach has been adopted by many organizations because successful projects require a pure technical approach that focuses on the tools, techniques, and methodologies of IT development.
answer
False
question
Only the most successful projects are likely to lead to best practices.
answer
False
question
According to the Standish Group, it appears that most project today fail not because of technology, but from a lack of user involvement and incomplete resources.
answer
True
question
Which of the following organizational variables can influence the selection of IT projects?
answer
all of these
question
The following statements about knowledge management (KM) are true except:
answer
KM is a well defined body of knowledge with an established theoretical base.
question
The Micro Era that started in the 1980's provided a smooth transition from large centralized computers to the personal computer that was widely welcomed by data processing managers who believed the replication of data throughout the organization would provide added backup and security.
answer
False
question
The Value-Driven Approach focuses on ___________.
answer
providing value to the organization.
question
The project manager is ____________.
answer
responsible for ensuring that all management and technical processes are in place and carried out.
question
The Micro era _____________
answer
Began in the early 1980s with the personal computer
question
The desire to fund a project should be based upon ___________
answer
the value the completed project will provide to an organization
question
The Guide to the Project Management Body of Knowledge provides a basis for identifying and describing the generally accepted principles of project management
answer
True
question
The EDP era ______________
answer
Began in the 1960s when large organizations first purchased a centralized mainframe or minicomputer.
question
Projects are planned organizational change. Therefore, the project manager and team do not need to worry about the political climate within the organization because top management has a firm understanding of the organization's culture, environment, politics, etc.
answer
False
question
Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements.
answer
True
question
IT projects must provide value to an organization
answer
True
question
A project can be defined as a temporary endeavor undertaken to accomplish a unique purpose
answer
True
question
A project ______________
answer
is a temporary endeavor undertaken to accomplish a unique product, service, or result
question
The subject matter expert is ___________
answer
the user or client who has specific knowledge, expertise, or insight in a specific functional area needed to support the project
question
The Data Processing Era that began in the 1960's focused on automating many of the organizational transactions such as general accounting, inventory management, and production scheduling with the aid of a centralized mainframe or mini computers.
answer
True
question
According to the CHAOS studies, which of the following factors tend to be most prevelant for challenged or failed projects?
answer
Lack of user input and incomplete requirements
question
According to the CHAOS studies, more IT projects are becoming increasing successful, but there is still a need to improve the likelihood of success
answer
True
question
According to the CHAOS studies, user involvement and executive support tend to be important factors for successful projects
answer
True
question
The rise of islands of independent that replicated data throughout the organization during the Micro Era in the 1980's often challenged the centralized control of many data processing managers.
answer
True
question
The Guide to the Project Management Body of Knowledge provides a basis for identifying and describing the generally accepted principles of project management.
answer
True
question
A value-driven approach to project management means _________.
answer
Measuring project success in terms of the value the project brings to the organization and not only in terms of meeting the project schedule and budget
question
IT projects must provide value to an organization.
answer
True
question
A project can be defined as a temporary endeavor undertaken to accomplish a unique purpose.
answer
True
question
According to the CHAOS studies, more IT projects are becoming increasing successful, but there is still a need to improve the likelihood of success.
answer
True
question
Only the most successful projects are likely to lead to best practices
answer
False
question
Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements
answer
True
question
The Project Management Body of Knowledge
answer
is a generally accepted set of principles and practices for project management
question
A methodology provides a systematic way to plan, manage, and execute projects
answer
True
question
The Project Management Body of Knowledge (PMBOK®) and PRojects IN Controlled Environments (PRINCE2®) are two popular and widely used project management methodologies.
answer
True
question
The following are components of the Agile Manifesto except:
answer
User Involvement over Cost of Project
question
Closing processes:
answer
formally accepts the project's product, service, or end result so the project or phase can be brought to an orderly close.
question
Project Risk Management
answer
focuses on identifying and responding appropriately to risks that can impact the project
question
The PMBOK® are called project cost management includes estimate costs, determine budget, and control costs.
answer
True
question
Project Scope Management
answer
provides assurance that the project's work is defined accurately and completed as planned
question
A project plan includes which of the following:
answer
All of these
question
Under PRINCE2®, the Project Board is accountable for the project's success or failure
answer
True
question
Planning processes:
answer
supports planning of the entire project and each individual phase
question
The phases of a learning cycle include all of the following except:
answer
Assess risk
question
PRINCE2® is similar to the PMBOK® Guide in that it follows the project life cycle and provides stakeholders with a common language and approach to managing projects.
answer
True
question
Executing processes:
answer
focus on integrating people and resources to carry out the planned activities.
question
Project Human Resource Management
answer
focuses on creating and developing the project team
question
Project Communications Management
answer
entails providing timely and accurate information about the project to stakeholders.
question
Project Cost Management
answer
assures that the project budget is developed and completed as approved.
question
The PMBOK® area called project time management includes all of the following except:
answer
Assign Activities
question
Project Time Management
answer
includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
question
Project Quality Management
answer
focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
question
Breaking a project down into phases increases the complexity and project risk.
answer
False
question
Under PRINCE2®, any proposed changes to the project that the user wants should be approved and included.
answer
False
question
Project Procurement Management
answer
is concerned with acquiring project resources that are outside the organization
question
Planning, executing, and monitoring and controlling are examples of:
answer
Project Management process groups.
question
Waterfall is an iterative development approach while Agile is a structured development approach.
answer
False
question
Initiating processes:
answer
Signal the beginning of the project or phase.
question
Contract closure ensures that all of the deliverables and agreed upon terms of the project have been completed and delivered.
answer
True
question
Although projects follow a project life cycle, the development of new products, services, or information systems follow a product life cycle.
answer
True
question
PRINCE2® was originally developed for government projects in the United States.
answer
False
question
The four phases of a learning cycle include: Understand and frame the problem, plan, act, reflect and learn.
answer
True
question
Project Integration Management
answer
focuses on coordinating the project plan's development, execution, and control of changes.
question
A project's scope is primarily a list of resources available to the project team.
answer
False
question
Monitoring and controlling processes:
answer
allows for managing and measuring progress toward the project's MOV and scope, schedule, budget, and quality objectives
question
Product-oriented processes will define all of the sub-phases and deliverables associated with the ______ project management life cycle phase
answer
execute and control
question
Fast tracking is defined as starting the next phase of a project before the current phase is complete.
answer
True
question
The following are PMBOK® knowledge areas except:
answer
Project Research Management
question
Project management processes include Scope, Schedule, Budget, and Quality.
answer
False
question
The integration of project management and systems development activities is one important component that distinguishes IT projects form other types of projects
answer
True
question
PMBOK® views project integration management as one of the most important because it coordinates the other nine knowledge areas.
answer
True
question
Although projects follow a project life cycle, the development of new products, services, or information systems follow a product life cycle
answer
True
question
Project management processes include Scope, Schedule, Budget, and Quality
answer
False
question
How many widgets would a company have to sell if their initial investment was $60,000 and widgets sold for $25? Materials to produce 100 widgets cost $1000. Direct labor costs $2.50 per widget. Total indirect costs & overhead is 10% of the selling price.
answer
6,000
question
A scoring model can combine both qualitative items reflected in the weights and scores that are based on people's judgments.
answer
True
question
The overall goal and measure of project success is:
answer
The project's MOV
question
Calculate the ROI for a project with total expected costs of $40,000 and total expected benefits of 35,000.
answer
-12.5%
question
The total cost of ownership (TCO) includes only the direct or up-front costs and ongoing expenditures.
answer
False
question
The total benefits of ownership (TBO) should address the benefits of an alternative over the course of its useful life.
answer
True
question
In general, riskier project alternatives will have a lower breakeven point than less risky project alternatives.
answer
False
question
Which of the following statements is the best indicator that the new software project was successful.
answer
The project's product, a software system, was a week late and 2% over budget, but six months later was found to have met the company's goal of reducing service callbacks by 15%.
question
A project that increased profits would impact the _____area of an organization
answer
financial
question
The net present value method of project valuation takes into account all relevant cash flows as well as the company's required rate of return
answer
True
question
Determining whether employees will be able to adapt to the planned change is _____
answer
organizational feasibility
question
Scoring models are useful because they allow for the inclusion of qualitative factors
answer
True
question
A project that provided cleaner air would impact the _____area of an organization.
answer
social
question
A project that provided customers better products and services would impact the _____area of an organization.
answer
customer
question
Which of the following is the best MOV statement?
answer
Our project should increase sales in the Dayton market by 15% next year to complete our company's Ohio expansion strategy.
question
A project that improved operational effectiveness would impact the _____area of an organization.
answer
operational
question
Calculate the Net Present Value for a project with the following cash flows: Year 0: ($5,000) Year 1: $10,000 Year 2: $10,000 Year3: ($2,000). The discount rate is 5%.
answer
$11,866.43
question
A significant deficiency of the payback method of analyzing alternatives is the failure to account for the time value of money.
answer
True
question
A business case is a deliverable that documents the project's goal, as well as several alternatives or options.
answer
True
question
The MOV should explicitly state the technology that will support the IT project.
answer
False
question
For the sake of efficiency and unity of purpose and direction, it is usually advisable to have the project manager take sole responsibility for developing the business case.
answer
False
question
All cash flows over the useful life of a project alternative must be included in the payback method of analysis.
answer
False
question
Trying to decide between three alternatives, a company employed a scoring model. Three criteria were chosen. Criteria A was believed to be the most important and so was given a weight of 50%. The other two were deemed to be equal to each other in importance. A relative scoring range of 0 to 10 was used. The table below shows each alternative and their scores. Which alternative should the company choose? Criteria Alternative A Alternative B Alternative C A 5 6 7 B 8 7 7 C 8 8 5
answer
Choose alternative B
question
Scope and schedule are examples of:
answer
Project Management objectives
question
The MOV should be adjusted at each phase of a project to align with the realities of project execution.
answer
False
question
Development of the project charter is the responsibility of the project sponsor.
answer
False
question
A project that increased market share would impact the _____area of an organization.
answer
strategic
question
Which of the following was NOT given as a reason for recruiting a core team to develop the business case?
answer
early identification of project team.
question
Evaluating the feasibility of an alternative in terms of the funds and resources available to support a project for the organization is a measure of _____.
answer
economic feasibility
question
A company utilizes the payback method exclusively to select projects. Which of the following mutually exclusive (they can only do one of them) projects will they choose? (Assume cash flows occur in equal monthly installments)
answer
Initial Investment:$100,000 Net Cash Flows: year 1:$1,000,000 year 2:$2,000,000 year 3:$2,000,000 each year thereafter:$0
question
All of the following are steps in developing the project MOV except:
answer
Identify the available organizational resources.
question
Which of the following statements about the business case is NOT true:
answer
A business case provides a project budget.
question
Determining whether the proposed solution will work within the software architecture is a measure of _____.
answer
technical feasibility
question
A project that improved operational effectiveness would impact the _____area of an organization
answer
operational
question
The net present value method of project valuation takes into account all relevant cash flows as well as the company's required rate of return.
answer
True
question
A project that increased profits would impact the _____area of an organization.
answer
financial
question
Determining whether employees will be able to adapt to the planned change is _____.
answer
organizational feasibility
question
The project charter _________.
answer
and the project plan should be developed together
question
A communication plan, a quality management plan, and change management plan are all associated with which part of the project charter?
answer
Project Administration
question
Higher potential for conflict and poor response time are disadvantages of:
answer
The Matrix Organization
question
Stakeholders are individuals, groups, or even organizations that have a stake or claim in the project's outcome.
answer
True
question
Disadvantages of the Project Organizational structure include project isolation, duplication of effort, and projectitis.
answer
True
question
_____ organizes resources to perform specialized tasks or activities in order to attain the goals of the organization.
answer
The Functional Organization
question
The _____ will specify how the project's product will be integrated into the organizational environment.
answer
Change Management Plan
question
An IT project manager's technical knowledge is much more important that his or her ability to communicate with people.
answer
False
question
The project environment includes not only the physical space where the team will work, but also the project culture as well.
answer
True
question
The _____serves as the agreement and contract between the project sponsor and the project team including such items as the project MOV, infrastructure, and project plan details.
answer
Project charter
question
The informal organizational structure is a published structure that defines the official lines of authority, responsibilities, and reporting relationships.
answer
False
question
Within the Project Charter, _____defines the work to be completed.
answer
Project Scope
question
Clear authority and responsibility, improved communication, and a high level of integration are advantages of:
answer
The Project Organization
question
A single organizational structure is best for all organizations regardless of strategy.
answer
False
question
Constraints are factors that can limit the project and usually can have an impact on scope, schedule, budget, or quality.
answer
True
question
The project charter serves as an agreement for all the project stakeholders.
answer
True
question
Stakeholders have only a positive interest in the project's outcome.
answer
False
question
The _____ describes how changes to the project's scope will be submitted, logged, and reviewed.
answer
Scope Management Plan
question
Increased flexibility, breadth and depth of knowledge and experience, and less duplication are advantages of:
answer
The Functional Organization
question
Which structure will tend to work well when an organization cannot dedicate scarce resources to a project?
answer
The Matrix Organization
question
Project team members should be chosen based upon their technology skills, business/organization skills, and interpersonal skills.
answer
True
question
The _____ will identify the process for staff acquisition and team development.
answer
Human Resources Plan
question
High potential for conflict and poor response time are disadvantages of the Matrix Organizational structure.
answer
True
question
Assumptions can be thought of as things that must go right in order for the project to be completed as planned.
answer
True
question
The structure that reveals most clearly how individuals in an organization relate is the:
answer
The Informal Organization
question
Which of the following attributes is least important for sucessful project managers
answer
ability to learn new technical skills
question
The Functional Organization is based upon organizing resources to perform specialized tasks or activities in order to attain the goals of the organization.
answer
True
question
The more traditional organizational form best describes:
answer
The Functional Organization
question
The _____ details how quality planning, assurance, and control will be supported throughout the project life cycle
answer
Quality Management Plan
question
High level of integration, improved communication, and increased project focus are advantages of:
answer
The Matrix Organization
question
Unity of command violations are most often associated with:
answer
The Matrix Organization
question
_____ integrates areas and resources throughout the organization.
answer
The Matrix Organization
question
Identifying the project stakeholders is an important component of the project charter.
answer
True
question
Project isolation, duplication of effort, and projectitis are disadvantages of:
answer
The Project Organization
question
Constraints can be thought of as things that must go right in order for the project to be completed as planned.
answer
False
question
The Project Organizational structure supports clear authority and responsibility, improved communication, and high levels of integration.
answer
True
question
The most complex organizational structure is the:
answer
The Informal Organization
question
High level of integration, improved communication, increased project focus, higher potential for conflict, and poorer response time are advantages and disadvantages of:
answer
The Matrix Organization
question
The main feature of the Matrix Organizational structure is the ability to integrate areas and resources throughout an organization.
answer
True
question
Within the Project Charter, _____ focuses on the knowledge areas, processes, and controls that will support the project and are separate subplans or strategies.
answer
Project Administration
question
Since adding features to a project will likely have a negative impact on schedules and budgets, once the project's scope has been defined, no new features should added.
answer
False
question
Which of the following processes of Scope Management Process ensuring that controls are in place to manage proposed scope changes once the project's scope is accepted?
answer
Control Scope
question
The scope statement defines the project boundary.
answer
True
question
One way to ensure that the WBS has the appropriate level of detail is to ensure that the people who do the work are involved in its development.
answer
True
question
Product scope is a statement detailing the deliverables and activities that support the IT methodology.
answer
False
question
Project success will be determined in large part by _____
answer
thinking carefully through activities and estimating their durations.
question
_____ may result in long hours and frustration for the project team, which may lead to burnout.
answer
Time Boxing
question
An estimation technique characterized by the dividing the project into smaller modules and then directly estimating the time and effort in terms of person-hours, person-weeks, or person-months for each module best describes
answer
Bottom-Up Estimating
question
All of the following are included in the Project Scope except:
answer
deliverable structure chart
question
The Work Breakdown Structure is subdivided into smaller components called:
answer
work packages
question
A tangible and verifiable piece of work is called a milestone
answer
False
question
The Delphi technique is a quick and economical way to estimate the duration and costs of project activities.
answer
False
question
Basing an estimate of activity durations on experience gained from working on similar projects is called analogous estimation.
answer
True
question
The development of a work breakdown structure is an interim step to define detailed work packages used to estimate the project schedule and budget.
answer
False
question
The _____ is a narrative description of the product, service, or Information System.
answer
Statement of Work
question
According to the PMBOK® area of scope management, one of the processes is scope planning which means ensuring that authority and resources are committed to developing a scope management plan.
answer
False
question
The work breakdown structure (WBS) decomposes, or subdivides, the project into smaller components and more manageable units of work called work packages.
answer
True
question
The scope boundary establishes only those elements that are a part of the project work to be completed by the project team.
answer
False
question
The _____ helps to identify the main functions or features of the system and the different users or external systems that interact with the system.
answer
Use case diagram
question
The scope boundary establishes both what is, and what is not part of the project work to be completed by the project team.
answer
True
question
Scope change control procedures protect the scope boundary from expanding as a result of increasing featurism.
answer
True
question
Which of the following statements about the work breakdown structure (WBS) is not true?
answer
The WBS should be developed by the project manager.
question
The most common error in guesstimating is to be pessimistic and to overestimate the time and resources necessary to complete a project.
answer
False
question
A significant event or achievement that provides evidence that a deliverable is complete is called a _____
answer
milestone
question
Scope change control is concerned with ensuring that any changes to the project scope will be beneficial, with determining that an actual scope change has occurred, and with managing the actual changes when and as they occur.
answer
True
question
Changes in the scope boundary are handled through a _____.
answer
Change Control
question
A work breakdown structure (WBS) represents a logical decomposition of the work to be performed and how the product, service, or result is naturally subdivided.
answer
True
question
The _____ estimation method usually costs more and takes longer than other methods.
answer
Delphi Technique
question
Project scope is a statement detailing the features and functions that must support the IT solution.
answer
False
question
____ can be a very effective estimating technique by forcing examination of project risks so that specific budget or schedule targets can be achieved.
answer
Top-Down Estimating
question
The significant event at the conclusion of each phase is called _____.
answer
milestone
question
The scope statement documents the sponsor's needs and expectations.
answer
True
question
The first step in accurately estimating an IT application is to _____.
answer
determine the size
question
With _____, activity estimates are usually provided by the team members.
answer
Bottom-Up Estimating
question
Scope grope suggests a fundamental and significant change in the project scope.
answer
False
question
Time boxing involves allocating a time segment for a task rather than attempting to estimate how long that task should take.
answer
True
question
An estimation technique characterized by the recruitment of multiple experts who provide rounds of estimates until a consensus estimate emerges.
answer
Delphi Technique
question
According to the text, most real-world estimating is made using top-down estimating.
answer
False
question
Which of the following processes of Scope Management Process centers on defining and documenting the stakeholders' needs to properly manage expectations?
answer
Collect Requirements
question
An estimation technique characterized by picking numbers out of the air or "ballparking".
answer
Guesstimating
question
Once the project schedule and project budget are approved they become the _____
answer
baseline plan
question
Predecessor activities are activities that must be completed before another activity can be started.
answer
True
question
_____ can help manage the Critical Path by providing information about which activities can be delayed without affecting the deadline target date.
answer
Project Network Diagrams
question
Under the Precedence Diagramming Method, the least common relationship between two activities which occurs when they must complete at the same time is called:
answer
Finish-To-Finish (FF)
question
_____ provide valuable information about the logical sequence and dependencies among the various activities and tasks:
answer
Project Network Diagrams
question
The technique used to help manage the Polaris submarine project and which bases activity estimates on probabilistic estimates of three scenarios is most closely associated with:
answer
PERT
question
Many organizations have a kick-off meeting because _______.
answer
All of these
question
Once the project schedule and budget are accepted by the client or sponsor, the project plan becomes the baseline plan that will be used as a benchmark to track the project's actual progress.
answer
True
question
Which of the following statements are true?:
answer
Baseline plans are approved project plans.
question
Rolling wave planning is:
answer
preparing a summary plan and developing incremental detailed schedules
question
_____ is well suited for developing simulations where the project manager can conduct sensitivity analysis for schedule planning and risk analysis.
answer
PERT
question
Installing a server before loading the operating system is an example of a finish-to-start relationship.
answer
True
question
A kick-off meeting is often held to develop the project plan.
answer
False
question
The project budget is determined by the project schedule, the cost of the resources assigned to each of the tasks, and by any other direct or indirect costs and reserves.
answer
True
question
Adding resources to an activity to shorten the critical path is called_____
answer
crashing
question
The critical path has zero slack (or float)
answer
True
question
_____ is considered the most useful and widely used project management tool.
answer
Gantt Charts
question
Starting the next task before the first task is complete is _____
answer
lead
question
The tool most closely associated with activity bars across a horizontal time axis is:
answer
Project Network Diagrams
question
The kick-off meeting brings closure to the planning phase of the project.
answer
True
question
Rent, utilities, insurance and administrative costs are examples of:
answer
Indirect Costs
question
Completing activities in parallel is called_____
answer
fast tracking
question
Funds allocated for unexpected expenses are _____
answer
Reserves Costs
question
The technique used to find the sequence of tasks with zero slack (or float) is most closely associated with:
answer
Critical Path Analysis
question
Start-to-Start and Finish-to-Finish relationships allow activities to be worked on in parallel.
answer
True
question
To make a decision to attempt to build an application system based on what was left after a previous attempt ended in failure primarily because of the large investment the company made in the failed project most likely was made by a manager who did not fully understand:
answer
Sunk Costs
question
Under the Precedence Diagramming Method, the situation which occurs when two activities can start at different times, have different durations, but are planned to be completed at the same time is called:
answer
Finish-To-Finish (FF)
question
Under the Precedence Diagramming Method, the situation which occurs when a relationship between two tasks that can or must start at the same time is called:
answer
Start-To-Start (SS)
question
The critical path is the shortest path in the project network and also is the longest time in which the project can be completed.
answer
False
question
The final step in determining the cost of an activity is:
answer
ensuring resources are leveled
question
An over allocated resource would arise when Mary is assigned to work on two tasks scheduled at the same time.
answer
True
question
Installing the operating system on a computer before loading any application packages is an example of:
answer
Finish-To-Start (FS)
question
The Critical Path is:
answer
the longest path in the project network.
question
Waiting to leave your shift until another person shows up is an example of:
answer
Start-To-Finish (SF)
question
Identifying the critical path is important because a project can only have one critical path and it never changes.
answer
False
question
The idea that there is a cost associated with using a resource is _____
answer
Prorated Costs
question
_____is ensuring that project resources are not overallocated.
answer
Resource leveling
question
Project network diagrams provide valuable information about the logical sequence and dependencies among the various activities and tasks so that a completion date or deadline can be determined
answer
True
question
Sunk costs include such things as rent, utilities, insurance, and other administrative costs.
answer
False
question
A start-to-finish activity is the most common relationship between two activities.
answer
False
question
Under the Precedence Diagramming Method, the most common relationship between two activities which implies a logical sequence is called:
answer
Finish-To-Start (FS)
question
Scheduling other projects so that resources may be shared is_____
answer
Critical Chain Project Management
question
Identifying the critical path is important because any change in the duration of the activities or tasks on the critical path will affect the project's schedule.
answer
True
question
Critical Chain Project Management (CCPM) is based on the idea that
answer
people often inflate or add cushioning to their time estimates
question
Predecessor activities are activities that can be worked on at the same time as another activity.
answer
False
question
_____ can be useful for tracking and monitoring project progress because they are simple and straightforward.
answer
Gantt Charts
question
Under the Precedence Diagramming Method, the situation which occurs when task A cannot end until task B starts is called:
answer
Start-To-Finish (SF)
question
Costs incurred prior to the current project are _____
answer
Sunk Costs
question
A parallel activity is a task that can be worked on at the same time as another activity.
answer
True
question
Parallel activities can shorten the project schedule, but can have an impact on project resources if a resource is assigned to two tasks at the same time.
answer
True
question
The amount of time an activity can be delayed before affecting the project deadline is _____
answer
Slack
question
An activity being analyzed under PERT was judged to most likely have a duration of 40 days. When considering the time it would take to complete the activity if every relevant factor went well, it was estimated to be able to be doable in 20 days and even under the worst case imaginable, the task would be take 50 days. The estimates PERT duration of that activity is:
answer
38.33days
question
Based upon the following diagram and activity durations, the Critical Path is: A2 B5 C4 D3 E1 F4 G3 H5 I5 J1
answer
A+B+C+F+H+J
question
The cost of labor for using a resource are _____
answer
Direct Costs
question
Time and effort needed to gather experience on a technology or process are _____
answer
Learning Curve Costs
question
The critical path is the longest path in the project network and also is the shortest time in which the project can be completed.
answer
True
question
PERT was developed in the 1950s to create a visual representation of scheduled activities, their logical sequence, and interrelationships using a statistical probability distribution.
answer
True
question
The direct costs of using a resource is the only type of cost that should be considered when developing the project budget.
answer
False
question
A reserve can provide a cushion when unexpected situations arise
answer
True
question
_____ can be useful for tracking and monitoring project progress because they are simple and straightforward
answer
Gantt Charts
Get an explanation on any task