PMI Lexicon of Project Management Terms – Flashcards

Unlock all answers in this set

Unlock answers
question
Acceptance Criteria
answer
A set of conditions that is required to be met before deliverables are accepted.
question
Activity
answer
A distinct, scheduled portion of work performed during the course of a project.
question
Actual Cost
answer
The realized cost incurred for the work performed on an activity during a specific time period.
question
Analogous Estimating
answer
A technique for estimating the duration or cost of an activity or a project, using historical data from a similar activity or project.
question
Apportioned Effort
answer
An activity where effort is allotted proportionately across certain discrete efforts and not divisible into discrete efforts. (Note: Apportioned effort is one of three earned value management [EVM] types of activities used to measure work performance.)
question
Assumption
answer
A factor in the planning process that is considered to be true, real, or certain, without proof or demonstration.
question
Backward Pass
answer
A critical path method technique for calculating the late start and late finish dates by working backward through the schedule model from the project end date.
question
Baseline
answer
The approved version of a work product that can be changed only through formal change control procedures and is used as a basis for comparison.
question
Bottom-up Estimating
answer
A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS).
question
Budget at Completion
answer
The sum of all budgets established for the work to be performed.
question
Change Control
answer
A process whereby modifications to documents, deliverables, or baselines associated with the project are identified, documented, approved, or rejected.
question
Change Control Board
answer
A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project and for recording and communicating such decisions.
question
Change Control System
answer
A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled.
question
Change Request
answer
A formal proposal to modify any document, deliverable, or baseline.
question
Code of Accounts
answer
A numbering system used to uniquely identify each component of the work breakdown structure.
question
Communication Management Plan
answer
A component of the project, program, or portfolio management plan that describes how, when, and by whom information will be administered and disseminated.
question
Constraint
answer
A limiting factor that affects the execution of a project, program, portfolio, or process.
question
Control Account
answer
A management control point where scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement.
question
Corrective Action
answer
An intentional activity that realigns the performance of the project work with the project management plan.
question
Cost Management Plan
answer
A component of a project or program management plan that describes how costs will be planned, structured, and controlled.
question
Cost Performance Index
answer
A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.
question
Cost Variance
answer
The amount of budget deficit or surplus at a given point in time, expressed as the difference between the earned value and the actual cost.
question
Crashing
answer
A technique used to shorten the schedule duration for the least incremental cost by adding resources.
question
Critical Chain Method
answer
A schedule method that allows the project team to place buffers on any project schedule path to account for limited resources and project uncertainties.
question
Critical Path
answer
The sequence of activities that represents the longest path through a project, which determines the shortest possible duration.
question
Critical Path Activity
answer
Any activity on the critical path in a project schedule.
question
Critical Path Method
answer
A method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule model.
question
Data Date
answer
A point in time when the status of the project is recorded.
question
Decision Tree Analysis
answer
A diagramming and calculation technique for evaluating the implications of a chain of multiple options in the presence of uncertainty.
question
Decomposition
answer
A technique used for dividing and sub-dividing the project scope and project deliverables into smaller, more manageable parts.
question
Defect Repair
answer
An intentional activity to modify a nonconforming product or product component.
question
Deliverable
answer
Any unique and verifiable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project.
question
Discrete Effort
answer
An activity that can be planned and measured and that yields a specific output. (Note: Discrete effort is one of three earned value management [EVM] types of activities used to measure work performance.)
question
Early Finish Date
answer
In the critical path method, the earliest possible point in time when the uncompleted portions of a schedule activity can finish based on the schedule network logic, the data date, and any schedule constraints.
question
Early Start Date
answer
In the critical path method, the earliest possible point in time when the uncompleted portions of a schedule activity can start based on the schedule network logic, the data date, and any schedule constraints.
question
Earned Value
answer
The measure of work performed expressed in terms of the budget authorized for that work.
question
Earned Value Management
answer
A methodology that combines scope, schedule, and resource measurements to assess project performance and progress.
question
Effort
answer
The number of labor units required to complete a schedule activity or work breakdown structure component, often expressed in hours, days, or weeks.
question
Enterprise Environmental Factors
answer
Conditions, not under the immediate control of the team, that influence, constrain, or direct the project, program, or portfolio.
question
Estimate at Completion
answer
The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.
question
Estimate to Complete
answer
The expected cost to finish all the remaining project work.
question
Fast Tracking
answer
A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration.
question
Finish-to-Finish
answer
A logical relationship in which a successor activity cannot finish until a predecessor activity has finished.
question
Finish-to-Start
answer
A logical relationship in which a successor activity cannot start until a predecessor activity has finished.
question
Forward Pass
answer
A critical path method technique for calculating the early start and early finish dates by working forward through the schedule model from the project start date or a given point in time.
question
Free Float
answer
The amount of time that a schedule activity can be delayed without delaying the early start date of any successor or violating a schedule constraint.
question
Gantt Chart
answer
A bar chart of schedule information where activities are listed on the vertical axis, dates are shown on the horizontal axis, and activity durations are shown as horizontal bars placed according to start and finish dates.
question
Human Resource Plan
answer
A component of the project or program management plan that describes how the roles and responsibilities, reporting relationships, and staff management will be addressed and structured.
question
Lag
answer
The amount of time whereby a successor activity is required to be delayed with respect to a predecessor activity.
question
Late Finish Date
answer
In the critical path method, the latest possible point in time when the uncompleted portions of a schedule activity can finish based on the schedule network logic, the project completion date, and any schedule constraints.
question
Late Start Date
answer
In the critical path method, the latest possible point in time when the uncompleted portions of a schedule activity can start based on the schedule network logic, the project completion date, and any schedule constraints.
question
Lead
answer
The amount of time whereby a successor activity can be advanced with respect to a predecessor activity.
question
Lessons Learned
answer
The knowledge gained during a project which shows how project events were addressed or should be addressed in the future for the purpose of improving future performance
question
Level of Effort
answer
An activity that does not produce definitive end products and is measured by the passage of time. (Note: Level of effort is one of three earned value management [EVM] types of activities used to measure work performance.)
question
Logical Relationship
answer
A dependency between two activities, or between an activity and a milestone.
question
Milestone
answer
A significant point or event in a project, program, or portfolio.
question
Most Likely Duration
answer
An estimate of the most probable activity duration that takes into account all of the known variables that could affect performance.
question
Opportunity
answer
A risk that would have a positive effect on one or more project objectives.
question
Optimistic Duration
answer
An estimate of the shortest activity duration that takes into account all of the known variables that could affect performance.
question
Organizational Breakdown Structure
answer
A hierarchical representation of the project organization, which illustrates the relationship between project activities and the organizational units that will perform those activities.
question
Organizational Process Assets
answer
Plans, processes, policies, procedures and knowledge bases specific to and used by the performing organization.
question
Organizational Project Management Maturity
answer
The level of an organization's ability to deliver the desired strategic outcomes in a predictable, controllable, and reliable manner.
question
Parametric Estimating
answer
An estimating technique in which an algorithm is used to calculate cost or duration based on historical data and project parameters.
question
Path Convergence
answer
A relationship in which a schedule activity has more than one predecessor.
question
Path Divergence
answer
A relationship in which a schedule activity has more than one successor.
question
Percent Complete
answer
An estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component.
question
Performing Organization
answer
An enterprise whose personnel are the most directly involved in doing the work of the project or program.
question
Pessimistic Duration
answer
An estimate of the longest activity duration, which takes into account all of the known variables that could affect performance.
question
Phase Gate
answer
A review at the end of a phase in which a decision is made to continue to the next phase, to continue with modification, or to end a project or program.
question
Planned Value
answer
The authorized budget assigned to scheduled work.
question
Portfolio
answer
Projects, programs, subportfolios, and operations managed as a group to achieve strategic objectives.
question
Portfolio Balancing
answer
The process of optimizing the mix of portfolio components to further the strategic objectives of the organization.
question
Portfolio Management
answer
The centralized management of one or more portfolios to achieve strategic objectives.
question
Precedence Diagramming Method
answer
A technique used for constructing a schedule model in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.
question
Predecessor Activity
answer
An activity that logically comes before a dependent activity in a schedule.
question
Preventive Action
answer
An intentional activity that ensures the future performance of the project work is aligned with the project management plan.
question
Probability and Impact Matrix
answer
A grid for mapping the probability of each risk occurrence and its impact on project objectives if that risk occurs.
question
Procurement Management Plan
answer
A component of the project or program management plan that describes how a team will acquire goods and services from outside of the performing organization.
question
Product Life Cycle
answer
The series of phases that represent the evolution of a product, from concept through delivery, growth, maturity, and to retirement.
question
Program
answer
A group of related projects, subprograms and program activities that are managed in a coordinated way to obtain benefits not available from managing them individually.
question
Program Management
answer
The application of knowledge, skills, tools, and techniques to a program to meet the program requirements and to obtain benefits and control not available by managing projects individually.
question
Program Management Office
answer
A management structure that standardizes the program-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques.
question
Progressive Elaboration
answer
The iterative process of increasing the level of detail in a project management plan as greater amounts of information and more accurate estimates become available.
question
Project
answer
A temporary endeavor undertaken to create a unique product, service, or result.
question
Project Calendar
answer
A calendar that identifies working days and shifts that are available for scheduled activities.
question
Project Charter
answer
A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
question
Project Life Cycle
answer
The series of phases that a project passes through from its initiation to its closure.
question
Project Management
answer
The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements.
question
Project Management Office
answer
A management structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques.
question
Project Management Plan
answer
The document that describes how the project will be executed, monitored, and controlled.
question
Project Manager
answer
The person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.
question
Project Phase
answer
A collection of logically related project activities that culminates in the completion of one or more deliverables.
question
Project Schedule
answer
An output of a schedule model that presents linked activities with planned dates, durations, milestones, and resources.
question
Project Schedule Network Diagram
answer
A graphical representation of the logical relationships among the project schedule activities.
question
Project Scope
answer
The work performed to deliver a product, service, or result with the specified features and functions.
question
Project Scope Statement
answer
The description of the project scope, major deliverables, assumptions, and constraints.
question
Quality Management Plan
answer
A component of the project or program management plan that describes how an organization's quality policies will be implemented.
question
Requirement
answer
A condition or capability that is required to be present in a product, service, or result to satisfy a contract or other formally imposed specification.
question
Requirements Management Plan
answer
A component of the project or program management plan that describes how requirements will be analyzed, documented and managed.
question
Requirements Traceability Matrix
answer
A grid that links product requirements from their origin to the deliverables that satisfy them.
question
Resource Breakdown Structure
answer
A hierarchical representation of resources by category and type.
question
Resource Calendar
answer
A calendar that identifies the working days and shifts upon which each specific resource is available.
question
Resource Leveling
answer
A technique in which start and finish dates are adjusted based on resource constraints with the goal of balancing demand for resources with the available supply.
question
Responsibility Assignment Matrix
answer
A grid that shows the project resources assigned to each work package.
question
Risk
answer
An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.
question
Risk Acceptance
answer
A risk response strategy whereby the project team decides to acknowledge the risk and not take any action unless the risk occurs.
question
Risk Avoidance
answer
A risk response strategy whereby the project team acts to eliminate the threat or protect the project from its impact.
question
Risk Breakdown Structure
answer
A hierarchical representation of risks that is organized according to risk categories.
question
Risk Category
answer
A group of potential causes of risk.
question
Risk Management Plan
answer
A component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed.
question
Risk Mitigation
answer
A risk response strategy whereby the project team acts to reduce the probability of occurrence or impact of a risk.
question
Risk Register
answer
A document in which the results of risk analysis and risk response planning are recorded.
question
Risk Transference
answer
A risk response strategy whereby the project team shifts the impact of a threat to a third party, together with ownership of the response.
question
Rolling Wave Planning
answer
An iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level.
question
Schedule Baseline
answer
The approved version of a schedule model that can be changed only through formal change control procedures and is used as a basis for comparison to actual results.
question
Schedule Compression
answer
A technique used to shorten the schedule duration without reducing the project scope.
question
Schedule Management Plan
answer
A component of the project or program management plan that establishes the activities for developing, monitoring, and controlling the project or program.
question
Schedule Model
answer
A representation of the plan for executing the project's activities including durations, dependencies and other planning information, used to produce a project schedule along with other scheduling artifacts.
question
Schedule Model Analysis
answer
A process used to investigate or analyze the output of the schedule model in order to optimize the schedule
question
Schedule Performance Index
answer
A measure of schedule efficiency expressed as the ratio of earned value to planned value.
question
Schedule Variance
answer
A measure of schedule performance expressed as the difference between the earned value and the planned value.
question
Scope Baseline
answer
The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary, which can be changed only through formal change control procedures and is used as a basis for comparison.
question
Scope Creep
answer
The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources.
question
Scope Management Plan
answer
A component of the project or program management plan that describes how the scope will be defined, developed, monitored, controlled, and verified.
question
S-Curve Analysis
answer
An earned value management technique used to indicate performance trends by using a graph that displays cumulative costs over a specific time period.
question
Secondary Risk
answer
A risk that arises as a direct result of implementing a risk response.
question
Sponsor
answer
A person or group who provides resources and support for the project, program, or portfolio, and is accountable for enabling success.
question
Staffing Management Plan
answer
A component of the human resource plan that describes when and how team members will be acquired and how long they will be needed.
question
Stakeholder
answer
An individual, group, or organization who may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project, program, or portfolio.
question
Start-to-Finish
answer
A logical relationship in which a successor activity cannot finish until a predecessor activity has started.
question
Start-to-Start
answer
A logical relationship in which a successor activity cannot start until a predecessor activity has started.
question
Successor Activity
answer
A dependent activity that logically comes after another activity in a schedule.
question
Summary Activity
answer
A group of related schedule activities aggregated and displayed as a single activity.
question
Threat
answer
A risk that would have a negative effect on one or more project objectives.
question
Three-Point Estimate
answer
A technique used to estimate cost or duration by applying an average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates.
question
To-Complete Performance Index
answer
A measure of the cost performance that is required to be achieved with the remaining resources in order to meet a specified management goal, expressed as the ratio of the cost to finish the outstanding work to the remaining budget.
question
Total Float
answer
The amount of time that a schedule activity can be delayed or extended from its early start date without delaying the project finish date or violating a schedule constraint.
question
Trigger Condition
answer
An event or situation that indicates that a risk is about to occur.
question
Variance Analysis
answer
A technique for determining the cause and degree of difference between the baseline and actual performance.
question
Variance at Completion
answer
A projection of the amount of budget deficit or surplus, expressed as the difference between the budget at completion and the estimate at completion.
question
WBS Dictionary
answer
A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure.
question
What-If Scenario Analysis
answer
The process of evaluating scenarios in order to predict their effect on project objectives.
question
Work Breakdown Structure
answer
A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.
question
Work Package
answer
The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed.
question
Workaround
answer
A response to a threat that has occurred, for which a prior response had not been planned or was not effective.