MEP Chapter 1
Unlock all answers in this set
Unlock answersquestion
T/F- Early control of comfort levels in a living environment was done by hand.€
answer
True
question
T/F-Credit is often given to the Greeks for having created the first central heating system.
answer
False
question
T/F- Early attempts to produce air conditioning were made by Ben Franklin in the mid 1800's.
answer
False
question
T/F- In American History, plumbing developments began as early as 1652.
answer
True
question
T/F- Around 1900, the first prototype of a siphonic wash down water closet was developed.
answer
True
question
T/F- Static electricity and generated electricity are 2 basic forms of electricity.
answer
True
question
T/F- Evidence has been found that basic forms of electricity were produced as early as 250 A.D.
answer
False
question
T/F- Energy-efficient building measures often require a higher initial budget.
answer
True
question
T/F- The more extensive an electrical wiring system if, the more cost added to the project.
answer
True
question
T/F- The energy auditing process is a multistep procedure that is preformed once.
answer
False
question
T/F- If performed in a proper manner, building commissioning activities begin in the construction planning phase and may continue throughout the life of the building.
answer
True
question
T/F- The orientation and shape of a building affect energy efficiency.
answer
True
question
T/F- Many of the inspection types included in an energy audit may become part of a regular maintenance program.
answer
True
question
T/F- The building commissioning process includes checks on major systems, such as hot water systems, HVAC, controls, and lighting.
answer
True
question
T/F- A general audit requires only one individual to evaluate a building.
answer
False
question
An individual who worked in the sanitary field in ancient Rome was call a __________
answer
Plumbarius
question
The word electricity is derived from the Greek word for _________
answer
Amber
question
_______ required and allotted for a building should be one of the first considerations in planning a new project.
answer
Space
question
A(n) _______ energy audit is the most complex and difficult energy audit to preform.
answer
Investment-grade
question
A ________ is a voluntary recommendation.
answer
Guideline
question
________ is the process of balancing and adjusting a mechanical or electrical system for max efficiency.
answer
Commissioning
question
A _____ is a mandatory rule issued by local, state, or the federal government.
answer
Regulation
question
The LEED Green Building Rating System was developed and is maintained by the ________.
answer
U.S. Green Building Council (USGBC)
question
By the _____ century water based systems were designed and used to circulate building heat.
answer
18th
question
By the 1950s _______ systems became more popular for residential use.
answer
A/C
question
In the year ____ the first electrical A/C system was invented.
answer
1902
question
_______ developed the first city water system in the colonies, primarily for firefighting and domestic use.
answer
Boston
question
From 1929 to 1954 the design of the _____ water closet was improved.
answer
Siphonic Washdown
question
Roughly _____% of a new construction budget is attributed to HVAC, plumbing, and electrical systems.
answer
45
question
A(n) ________ is an in-depth review of the energy use of a building.
answer
Energy Audit
question
________ is the scheduled work required to keep equipment in peak operating condition.
answer
Preventative Maintenance
question
________ is a voluntary labeling program designed to promote energy-efficient products and was implemented by EPA to save energy and reduce power plant greenhouse gas emissions.
answer
Energy Star
question
______ refers to building design and construction methods that efficiently use materials, energy, water, and other natural resources.
answer
Sustainable Construction
question
LEED has developed a system for existing buildings known as _____, which centers on efficient building operations within existing commercial buildings while minimizing the impact on the environment.
answer
LEED-EB
question
A(n) __________ energy audit is a simple overview of the energy-consuming equipment in a building.
answer
Preliminary
question
______ is a green building rating system that awards points based on specific energy and environmental constructions types and activities.
answer
LEED rating