Managing Quality Operations Management – Flashcards

Unlock all answers in this set

Unlock answers
question
Quality and competitive strategy
answer
Higher quality may be important factors in DIFFERENTIATION competitive strategy. Quality may reduce cost in some cases through increased productivity, lower rework and scrap.
question
Leadership
answer
Firm mission, culture, emphasis on quality. Employer fulfillment, Empowerment, commitment to the organization. Customer service.
question
Views of Quality
answer
User based, better performance, more features. Manufacturing base, conformance to standards, making it right the first time. Product based, specific and measurable attributes of the product.
question
Implications of Quality
answer
Company Reputation, Employment practices, product liability, global implications, perception of new products, supplier relations, reduce risk, improved ability to compete.
question
Dimensions of quality
answer
Performance, conformance, aesthetics, features, durability, perceived quality, reliability, serviceability, value.
question
Malcom Baldrige National Quality Award
answer
Established in 1988 by the U.S. government, designed to promote TQM practices, includes a variety of criteria.
question
Cost of Poor Quality
answer
Prevention cost, appraisal costs, internal failure, external failure.
question
International Quality Standards
answer
Industrial Standard Z8101 - 1981 (Japan) ISO 9000 series (Europe/EC): Common quality standards for products sold in Europe ( even if made in U.S.)
question
Names in Quality Management
answer
W. Edwards Deming 14 pints for Management. Joseph M. Juran top management commitment fitness for use. Philip B. Crosby Quality is free.
question
Ethics and quality management
answer
Operations managers must deliver healthy, sage quality products and services. Poor quality risk injuries, lawsuits, recall, and regulation. Organizations are judged by how they respond to problems.
question
Total Quality Management TQM
answer
Encompasses entire organization, from supplier to customer. Stresses a commitment by management to have a continuing, companywide drive toward excellence in all aspects of products and services that are important to the customer.
question
Demings 14 points
answer
1. Create consistency of purpose, 2. Build quality into product, stop depending on inspection, 3. Build long term relationships based on performance, not price. 4. Continuously improve product, quality, and service. 5. Start training.
question
6. Drive out fear, 7. Stop haranguing workers, 8. Remove barriers to pride in work.
answer
9. Institute a vigorous program of education and sell-improvement. 10. Put everybody in the company to work on the transformation. 11. Lead to promote change. 12. Emphasize leadership. 13. Break down barriers between departments. 14. Support, help, improve.
question
Seven Related Concepts of TQM
answer
Continuous improvement: Represent continual improvement of all process. Involves all operations and work centers including suppliers and customers. People, equipment, materials, procedures.
question
Six Sigma
answer
Originally developed by Motorola, Six Sigma refers to an extremely high measure of process capability. A Six Sigma capable process will return no more than 3.4 defects per million operations. Highly structured approach to process improvement.
question
Employe empowerment
answer
Getting employees involved in product and process improvements. Build communication network that include employees. Develop open, supportive supervisor. Build a high-morale organization. Quality circles. Move responsibility to employees. Create forma team structure.
question
Benchmarking: Selecting best practices to use as a standard for performance.
answer
Determine what to benchmark. Identify benchmarking partners. Take action to match or exceed the benchmark. Form a benchmark team. Collect & analyze benchmarking info.
question
Just - in - time JIT
answer
Pull' system of production scheduling including supply management. Production only when signaled. Allow reduced inventory levels. Inventory costs money and hides process and material problems. Encourages improved process an product quality.
question
Taguchi concepts
answer
Experimental design methods to improve product an process design. Identify key components an process variable affecting product variation. Quality Robustness, ability to produce uniformly in adverse manufacturing and environmental conditions.
question
Remove the effects of adverse conditions.
answer
Small variations in materials and process do not destroy product quality. Quality loss function, shows costs including customer satisfaction, warranty and service, internal scrap & repair, etc. increase as the product moves away from what the customer wants.
question
Tools of TQM
answer
Tools for generating ideas, check sheets, scatter diagrams, cause and effect diagrams. Tools to organize the Data, Pareto charts, flow charts. Tools for identifying problems, histograms.
question
Statistical process control chart
answer
Uses statistics and control charts to tell when to take corrective action, drives process improvement, four key steps, measure the process, when a change indicated, find the assignable cause, restart the revised process.
question
Inspection
answer
Involves examining items to see if an item is good or defective, detect a defective product, does not correct deficiencies in process or product, It is expensive, Many problem, work fatigue, measurement error, process variability, cannot inspect quality into a product.
question
TQM in Services
answer
Service quality is more difficult to measure than the quality of goods.
question
Determinants of Service Quality
answer
Reliability, Responsiveness, Competence, Access, Courtesy, Communication, Credibility, Security, Understanding/ knowing the customer.
question
Production
answer
Creation of goods and services
question
Operations Management / Production
answer
A set of activities that creates value in the form of goods and services by transforming inputs into outputs. Design, operation and improvement of the system that creates and deliver the firm's primary products and services.
question
Operations is one of the basic functions of any business.
answer
Efficiency, effectiveness and value. Operations Management provides a systematic way of looking at at organization and its process. Concepts and tools of Operations Management are used across other functions of a business.
question
Some of the Activities of operations Management.
answer
Service and product design, Quality management, Process and capacity design, Location Strategies, layout design, human resources & job design, supply-chain management, material requirements planning and inventory management, scheduling, maintenance.
question
Development of Operations Management
answer
Early Development, Adam Smith [1776] and Charles Babbage [1852] specialization of labor. Eli Whitney [1800] interchangeable parts.
question
Scientific Management
answer
Fredrick Taylor [1881] father of scientific management. Gantt [1916] Gantt charts. Frank & Lillian Gilbreth [1922] Motion Studies. Henry Ford & Charles Sorensen [1913] Assembly lines.
question
Quality Management
answer
Walter Shewhart [1924] Statistical Quality Control. W. Edward Deming [1950] TQM. Baldrige Award, ISO, Six Sigma Quality, etc. Business Process Reengineering.
question
Operations Research
answer
Many Researchers, EOQ, Linear Programming, Simulation, PERT/CPM, Waiting-line Theory, etc.
question
Goods VS. Services
answer
Goods, Usually tangible, can be inventoried, production separate from Consumption, can be produced to "tight" specification.
question
Services
answer
Usually intangible, cannot normally be inventoried and usually perishable, Often produced and consumed simultaneously it the interaction with customer. Inherently heterogeneous or variable, often involve a package of services. Continuum between pure goods and pure services.
question
Productivity
answer
Ratio of outputs to the inputs, output divided by input.
question
Productivity can be improved by reducing inputs, while holding outputs constant or increasing outputs while holding constant.
answer
labor productivity
question
Other partial measures of productivity
answer
Capital, materials,energy, etc.
question
Multi-factor productivity
answer
Consider more than one input relative to outputs, usually inputs are measured in dollars so that they can be added together. Measurement of productivity.
question
Examples of operations management positions.
answer
Plant manager, hospital administrator, branch manager of a bank, department store manager, call center manager, supply chain manager, purchasing manager, business process improvement manager, facilities manager, chief operating officer.
question
Operations and Strategy
answer
Mission: Why do we exist? Who are our customers?, What customers needs are being satisfied? What products or services do we provide?
question
Business Strategy
answer
How a firm competes: Competitive strategy, differentiation, cost leadership.
question
How operations fits in
answer
Operations management supports the business strategy.
question
Activities Strategic operations management decisions
answer
Service and product design, Quality management, process and capacity design, location, layout design, Human resources & job design, supply-chain management, inventory, scheduling, maintenance.
question
Project Management
answer
Three phases, 1. planning, 2. scheduling, 3. Controlling.
question
Project Planning
answer
Definition of a project: series of related tasks directed towards a major output.
question
Characteristics of typical projects
answer
Defined with a specific goal and deadline, may be unique or somewhat unfamiliar, may contain complex, interrelated task requiring specialized skills, finite life, cuts across organizational lines.
question
Project Organization
answer
Typical organized in a matrix fashion.
question
Project managers
answer
High visibility, responsible for making sure project is finished on time, within budget, and according to specifications, manage people assigned to the project.
question
Project Scheduling
answer
Sequencing and allotting of time to project activities. Show relationship of each activity to others and to the whole project. Identify precedence relationship among activities.
question
Sets realistic time and cost estimates for each activity. Identifies critical bottlenecks in the project, thus allowing better use of people and other resources.
answer
Project Management Techniques
question
The Techniques are next
answer
Gantt Chart: useful for smaller projects, Pert: Program Evaluation and Review Technique. CPM: Critical Path Method.
question
PERT & CPM
answer
Were developed to schedule, monitor and control large & complex projects.
question
Six Basic Steps for PERT & CPM
answer
1. Define project an prepare work breakdown structure, 2. Development relationship among the activities, including which activities must precede and which activities must follow others.
question
3. Draw network connecting all of the activities 4. Assign time and / or cost estimates to each activity.
answer
5. Compute the longest time path through the network also called the critical path. 6. Use the network to help plan, schedule, monitor and control projects.
question
Approaches
answer
Activity on Node AON AND Activity on Arrow AOA
question
PERT & CPM Advantages
answer
Especially useful for large and or complex projects. Straightforward and not mathematically complex. Graphical network help to visualize relationships among projects activities.
question
Critical path an slack time analyses help pinpoint activities that need to be most closely monitored
answer
Applicable to a wide variety of projects.
question
PERT & CPM
answer
Determine project schedule.
question
ES
answer
Earliest start, the earliest time which an activity can start, assuming all predecessor have been completed.
question
EF
answer
Earliest finish, the earliest time at which an activity can be finished.
question
LS
answer
Latest start, the latest time at which an activity can start so as to not delay the completion of the entire project.
question
LF
answer
Latest finish, the latest time by which an activity has to be finished so as to not delay the completion time of th entire project.
question
Forward pass
answer
Begin at starting event and work forward.
question
Earliest Start time rule
answer
If an activity has only 1 predecessor, the ES is the EF of the predecessor. If an activity has multiple predecessors, then the ES is the maximum of the EFs of all the predecessors.
question
Earliest Finish Time Rule
answer
The earliest finish time EF of an activity is the sum of the earliest start time ES and its activity time.
question
Backward Pass
answer
Begin with the lat event and work backwards.
question
Latest finish rule
answer
If an activity is an immediate predecessor for just a single activity, its LF is the minimum of ALL activity that immediately follow it. If an activity is an immediate predecessor to more than one activity, its LF is the minimum of ALL activities that immediately follow it.
question
Latest Start time rule
answer
The last start time LS of an activity is the difference of its latest finish time LF and its activity time .
question
Compute Slack Time for Each Activity
answer
Slack is the length of time an activity can be delayed without delaying the entire project.
question
Slack = LS - ES or Slack = LF - EF
answer
The critical path has no slack!
question
Variability in activity times
answer
CPM assumes a fixed tim with no variability. PERT uses a probability distribution for activity times.
question
Three time estimates
answer
Optimistic time a, Most-likely time m, Pessimistic time b.
question
Expected time
answer
t=[a+4m+b]/6
question
Variance time
answer
v=[[b-a]/6]^2
question
Project variance
answer
Sum of variances for critical activities.
question
Project standard deviation
answer
Square root of project variance.
question
PERT assumes that total project completion times are normally distributed.
answer
Probability of project completion on time can be estimated using the normal distiribution.
question
Project Crashing
answer
Shortening the projects's duration. Select activity on critical path can be crashed and the smallest crash cost.
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New