Information Technology Project Management 8th – Chapter 5 – Flashcards

Unlock all answers in this set

Unlock answers
question
analogy approach
answer
Creating a WBS by using a similar project's WBS as a starting point
question
benchmarking
answer
Generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization
question
bottom-up approach
answer
Creating a WBS by having team members identify as many specific tasks related to the project as possible and then grouping them into higher-level categories
question
decomposition
answer
Subdividing project deliverables into smaller pieces
question
deliverable
answer
product, such as a report or segment of software code, produced as part of a project
question
Joint Application Design (JAD)
answer
Using highly organized and intensive workshops to bring together project stakeholders—the sponsor, users, business analysts, programmers, and so on—to jointly define and design information systems
question
project scope management
answer
The processes involved in defining and controlling what work is or is not included in a project
question
project scope statement
answer
A document that includes at least a description of the project, including its overall objectives and justification, detailed descriptions of all project deliverables, and the characteristics and requirements of products and services produced as part of the project
question
prototyping
answer
Developing a working replica of the system or some aspect of it to help define user requirements
question
requirement
answer
A condition or capability that must be met by the project or that must be present in the product, service, or result to satisfy an agreement or other formally imposed specification
question
requirements management plan
answer
A plan that describes how project requirements will be analyzed, documented, and managed
question
requirements traceability matrix (RTM)
answer
A table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed
question
scope
answer
All the work involved in creating the products of the project and the processes used tocreate them
question
scope baseline
answer
The approved project scope statement and its associated WBS and WBS dictionary
question
scope creep
answer
The tendency for project scope to keep getting bigger
question
scope validation
answer
Formal acceptance of the completed project deliverables
question
top-down approach
answer
Creating a WBS by starting with the largest items of the project and breaking them into subordinate items
question
use case modeling
answer
A process for identifying and modeling business events, who initiated them, and how the system should respond to them
question
variance
answer
The difference between planned and actual performance
question
WBS dictionary
answer
document that includes detailed information about each WBS item
question
work breakdown structure (WBS)
answer
A deliverable-oriented grouping of the work involved in a project that defines its total scope
question
work package
answer
A task at the lowest level of the WBS
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New