Chapter 8 Project Quality Management – Flashcards

Unlock all answers in this set

Unlock answers
question
Quality
answer
the degree to which a set of characteristics fulfills requirements. must be on an equal level with project scope, time and cost.
question
conformance to requirements
answer
the project's processes and products meet written specifications
question
fitness for use
answer
a product can be used as it was intended
question
project quality management
answer
ensure that the project will satisfy the needs for which it was undertaken.
question
project quality management processes
answer
planning quality management, performing quality assurance, performing quality control.
question
1. planning quality management
answer
identifying which quality standards are relevant to the project and how to satisfy them; a metric is a standard of measurement.
question
2. performing quality assurance
answer
periodically evaluating overall project performance to ensure the project will satisfy the relevant quality standards.
question
3. performing quality control
answer
monitoring specific project results to ensure that they comply with the relevant quality standards.
question
plan quality management outputs
answer
quality management plan, process improvement involvement plan, quality metrics, quality checklists, and project documents updates. PLANNING PHASE
question
perform quality assurance outputs
answer
change requests, project management plan updates, project documents updates, and organizational process asset updates. EXECUTING PHASE
question
perform quality control
answer
quality control measurements, validated changes, validated deliverable, work performance information, change requests, project management plan updates, project documents updates, and organizational process asset updates. MONITORING & CONTROLLING PHASE
question
planning quality
answer
implies the ability to anticipate situations and prepare actions to bring about the desired outcome.
question
design of experiments
answer
a technique that helps identify which variables have the most influence on the overall outcome of a process.
question
scope aspects of IT projects
answer
functionality, features, system outputs, performance, reliability, maintainability.
question
functionality
answer
the degree to which a system performs its intended function.
question
features
answer
the system's special characteristics that appeal to users.
question
system outputs
answer
are the screens and reports the system generates.
question
performance
answer
addresses how well a product or service performs the customer's intended use.
question
reliability
answer
the ability of a product or service to perform as expected under normal conditions.
question
maintainability
answer
addresses the ease of performing maintenance on a product.
question
project managers
answer
ultimately responsible for quality management on their projects.
question
quality assurance
answer
includes all the activities related to satisfying the relevant quality standards for a project.
question
kaizen
answer
another goal of quality improvement, Japanese word for improvement or change for the better.
question
lean
answer
involves evaluating processes to maximize customer value while minimizing waste.
question
benchmarking
answer
generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other products within or outside the performing organization.
question
quality audit
answer
a structured review of specific quality management activities that help identify lessons learned that could improve performance on current or future projects.
question
kanban five core properties
answer
visual workflow, limit work-in-process, measure and manage flow, make processes policies explicit, use models to recognize improvement opportunities.
question
main outputs quality control
answer
acceptance decisions, rework, process adjustments
question
acceptance decisions
answer
determine if the products or services produced as part of the project will be accepted or rejected.
question
rework
answer
action taken to bring rejected items into compliance with product requirements, specifications, or other stakeholder expectations.
question
process adjustments
answer
correct or prevent further quality problems based on quality control measurements.
question
seven basic tools of quality
answer
cause-and-effect diagrams, control chart, checksheet, scatter diagram, histogram, Pareto chart, flowcharts
question
cause-effect-diagrams
answer
trace complaints about quality problems back to the responsible production operations. help you find the root cause of a problem.
question
fishbone or Ishikawa diagrams
answer
a diagram that traces complaints about quality problems back to the responsible production operations to help find the root cause.
question
5 whys
answer
a technique in which you repeatedly ask the question "Why?" to help peel away the layers of symptoms that can lead to the root cause of a problem.
question
control chart
answer
a graphic display of data that illustrates the results of a process over time.
question
seven run rule
answer
states that if seven data points in a row are all below the mean, above the mean, or are all increasing or decreasing, then the process needs to be examined for non-random problems
question
checksheet
answer
used to collect and analyze data. It is sometimes called a tally sheet or checklist, depending on its format
question
scatter diagram
answer
helps to show if there is a relationship between two variables. The closer data points are to a diagonal line, the more closely the two variables are related
question
histogram
answer
is a bar graph of a distribution of variables
question
pareto chart
answer
a histogram that can help you identify and prioritize problem areas.
question
pareto analysis
answer
also called the 80-20 rule, meaning that 80 percent of problems are often due to 20 percent of the causes
question
flowcharts
answer
graphic displays of the logic and flow of processes that help you analyze how problems occur and how processes can be improved, show activities, decision points, and the order of how information is processed.
question
statistical sampling
answer
involves choosing part of a population of interest for inspection.
question
run chart
answer
displays the history and pattern of variation of a process over time.
question
six sigma
answer
a comprehensive and flexible system for achieving, sustaining, and maximizing business success. uniquely driven by close understanding of customer needs, disciplined use of facts, data, and statistical analysis, and diligent attention to managing, improving, and reinventing business processes.
question
standard deviation
answer
measures how much variation exists in a distribution and there is relatively greater variability.
question
normal distribution
answer
a bell-shaped curve that is symmetrical around the mean or average value of the population (the data being analyzed).
question
yield
answer
represents the number of units handled correctly through the process steps.
question
DMAIC
answer
a systematic, closed-loop process for continued improvement that is scientific and fact based, stands for define, measure, analyze, improve and control.
question
Define
answer
define the problem/opportunity, process, and customer requirements
question
measure
answer
define measures, then collect, compile and display data
question
analyze
answer
scrutinize process details to find improvement opportunities
question
improve
answer
generate solutions and ideas for improving the problem
question
control
answer
track and verify the stability of the improvements and the predictability of the solution
question
defect
answer
any instance in which the product or service fails to meet customer requirements.
question
six 9s of quality
answer
a measure of quality control equal to 1 fault in 1 million opportunities.
question
unit test
answer
done to test each individual component (often a program) to ensure that it is as defect-free as possible.
question
integration testing
answer
occurs between unit and system testing to test functionally grouped components.
question
system testing
answer
tests the entire system as one entity.
question
user acceptance testing
answer
an independent test performed by end users prior to accepting the delivered system.
question
cost of quality
answer
the cost of conformance plus the cost of nonconformance.
question
conformance
answer
delivering products that meet requirements and fitness for use
question
cost of conformance
answer
taking responsibility for failures or not meeting quality expectations.
question
five major cost categories related to quality
answer
prevention cost, appraisal cost, internal failure cost, external failure cost, measurement and test equipment costs.
question
prevention cost
answer
the cost of planning and executing a project so that it is error-free or within an acceptable error range.
question
appraisal cost
answer
the cost of evaluating processes and their outputs to ensure that a project is error-free or within an acceptable error range.
question
internal failure cost
answer
a cost incurred to correct an identified defect before the customer receives the product.
question
external failure cost
answer
cost that relates to all errors not detected and corrected before delivery to the customer.
question
measurement and test equipment costs
answer
the capital cost of equipment used to perform prevention and appraisal activities
question
software defect
answer
anything that must be changed before delivery of the program
question
modern quality management
answer
requires customer satisfaction, prefers prevention to inspection, recognizes management responsibility for quality
question
malcom baldrige national quality award
answer
originated in 1987 to recognize companies that have achieved a level of world-class competition through quality management
question
ISO 9000
answer
a quality system standard developed by the ISO, is a three-part, continuous cycle of planning, controlling, and documenting quality in an organization.
question
maturity models
answer
frameworks for helping organizations improve their processes and systems
question
software quality function deployment model integration
answer
a process improvement approach that provides organizations with the essential elements of effective processes
question
CMMI levels
answer
incomplete, performed, managed, defined, quantitatively managed, optimizing
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New