Business Project Management – Chapter 7

question

Murphy’s Law and Corollary
answer

7.1. Risk Management Process • X: Anything that can go wrong, will go wrong • Y: It will go wrong at the worst possible time
question

Risk
answer

Uncertain or chance events that planning can not overcome or control.
question

Risk Management
answer

• A proactive attempt to recognize and manage internal events and external threats that affect the likelihood of a project’s success. • What can go wrong (risk event). • How to minimize the risk event’s impact (consequences). • What can be done before an event occurs (anticipation). • What to do when an event occurs (contingency plans).
question

Risk event
answer

The X graph – The probability of a X is greatest in the concept, planning and early execution phases of the project – The cost impact of a X dramatically rises nearer the end of the execution phase and peaks during delivery
question

Potential risk
answer

The early stages of the project represent the period when the opportunity for minimizing the impact or for working around a X is the greatest
question

Risk management
answer

Benefits of X • Proactive vs. reactive approach. • Reduces surprises and negative consequences. • Prepares team to take advantage of appropriate risks. • Provides better control over the future. • Improves chances of completing project within budget and on time.
question

Risk Identification, Risk Assessment, Risk Response Development, Risk Response Control
answer

Risk Management Step 1: I Step 2: A Step 3: RD Step 4: RC
question

List
answer

Step 1: Risk Identification Generate a X of possible risks through brainstorming, problem identification and risk profiling. • Don’t focus on events, rather look at event(s) that could produce consequences • Example: Risk – Failing to meet schedule; should be events like poor estimates, bad weather, shipping delays, etc.
question

Risk Breakdown Structure
answer

Step 1: Risk Identification – X • Macro risks first, then specific events • Reduces the chance a risk will be missed
question

Risk profile
answer

Step 1: Risk Identification – X – List of questions specifically designed to address known areas of risk
question

Scenario analysis
answer

Step 2: Risk Assessment – X • probability risk will occur • impact if risk does occur • Figure 7.5 shows an example of a table listing impacts by objective area (Cost, Time, Scope, Quality) • Figure 7.6 is a partial example of one type of documentation of the risk scenario analysis (a risk assessment form)
question

Risk Assessment
answer

Step 2: X – X matrix • Major (red); Moderate (yellow); Minor (green) risks – Failure Mode and Effects Analysis (FMEA) • Probability x Impact x Detection = Risk Value – Probability analysis • Decision trees, NPV, and PERT -Semi-quantitative scenario analysis • FMEA: Impact 1 x Probability 5 x Detection 5 = Impact 5 x Probability 5 x Detection 1!
question

Mitigating risk
answer

Step 3: Risk Response Development – X: • Reducing the likelihood a risk event will occur – example: testing • Reducing impact of risk event – example: preplanning alternatives
question

Avoiding risk
answer

Step 3: Risk Response Development – X: • Changing the project plan to eliminate the risk or condition
question

Transferring Risk
answer

Step 3: Risk Response Development – X: • Paying a premium to pass the risk to another party (e.g., insurance) • Requiring Build-Own-Operate-Transfer (BOOT) provisions
question

Retaining Risk
answer

Step 3: Risk Response Development – X: • Making a conscious decision to accept the risk
question

Contingency plans
answer

Step 3: Risk Response Development – An alternative plan that will be used if a possible foreseen risk event actually occurs. – A plan of actions that will reduce or mitigate the negative impact (consequences) of a risk event
question

Risks and Contingency
answer

Step 3: Risk Response Development X and Y Plans • Technical risks • Cost risks (Price changes) • Funding risks (Funding supply) • Schedule risks (Funds set aside to expedite or “crash” the project to get it back on track)
question

Opportunity
answer

Step 3: Risk Response Development X management: – X: an event that can have a positive impact (positive risk) – Four different types of response to an X • Exploit • Share • Enhance • Accept
question

Contingency Funds
answer

Step 3: Risk Response Development • Budget Reserves (risk is identified): at work package or deliverable level • Management Reserves (risk is unknown): at the project level
question

Time Buffers
answer

Step 3: Risk Response Development X – time added to uncertain activities • Activities with severe risks • Merge activities prone to delay • Non-critical activities that may create a new critical path • Activities that require scarce resources
question

Risk register and Risk control
answer

Step 4: Risk Response Control – X: Details all identified risks, including descriptions, category, probability of occurring, responses, contiguity plans, owners and current status – Y involves: • Execute the risk response strategy, triggering events, initiating contingency plans, watching for new risks
question

Management system
answer

Change Control Management Change X 1. Identify proposed changes. 2. List expected effects on schedule and budget. 3. Review, evaluate, and approve or disapprove changes formally. 4. Negotiate and resolve conflicts of change, condition, and cost. 5. Communicate changes to parties affected. 6. Assign responsibility for implementing change. 7. Adjust master schedule and budget. 8. Track all changes that are to be implemented
question

Change
answer

Benefits of a X management system 1. Inconsequential Xs are discouraged by the formal process. 2. Costs of Xs are maintained in a log. 3. Integrity of the WBS and performance measures is maintained. 4. Allocation and use of budget and management reserve funds are tracked. 5. Responsibility for implementation is clarified. 6. Effect of changes is visible to all parties involved. 7. Implementation of change is monitored. 8. Scope changes will be quickly reflected in baseline and performance measures.