Acc Ch 22 – Flashcards

Unlock all answers in this set

Unlock answers
question
true
answer
The use of budgets in controlling operations is known as budgetary control
question
managers must use responsibility accounting
answer
which one of the following is not part of the budgetary control process?
question
budgets contribute to the control of operations
answer
which statement is correct as it relates to budgetary control?
question
using static budgets
answer
budgetary control involves all of the following except
question
all of the above answers (daily, weekly, monthly)
answer
budget reports are prepared
question
scrap report
answer
a production manager in a manufacturing company would most likely receive a
question
all of the above answers (developing, analyzing, corrective action)
answer
budgetary control involves
question
false
answer
a static budget report is appropriate for variable manufacturing costs
question
when the company performs at the same activity level as the static budget level
answer
Ace Company monitors its managers performance using a static budget. Which one of the following situations will provide the fairest evaluation for those managers?
question
fixed overhead costs
answer
for which of the following costs is a static budget most appropriate
question
a projection of budget data at a single level of activity
answer
a static budget is
question
fixed
answer
a static budget is useful in controlling costs when cost behavior is
question
static budget
answer
a projection of budget data at one level of activity is a
question
fixed manufacturing costs and fixed selling & administrative expenses
answer
a static budget report is appropriate for
question
false
answer
a flexible budget projects budget data for one level of activity
question
true
answer
the first step in developing a flexible budget is to identify the activity index and the relevant range of activity
question
false
answer
management by exception means that top management will investigate every budget difference
question
budgeted amounts for the actual activity level achieved
answer
what budgeted amounts appear on the flexible budget report?
question
identify the activity index and the relevant range of activity
answer
which one of the following is a step that management must perform when developing the flexible budget?
question
$30,000 fixed plus $6 per direct labor hour variable
answer
at zero direct labor hours in a flexible budget graph, the total budgeted cost line intersects the vertical axis at $30,000. At 10,000 direct labor hours, a horizontal line drawn from the total budgeted cost line intersects the vertical axis at $90,000. Fixed and variable costs may be expressed as
question
$400 unfavorable
answer
at 9,000 direct labor hours, the flexible budget for indirect materials is $27,000. If $28,000 of indirect materials costs are incurred at 9,200 direct labour hours, the flexible budget report should show the following difference for indirect materials
question
flexible budget
answer
A projection of budget data for various levels of activity is a
question
identify the fixed costs and determine the budgeted fixed cost per unit
answer
which of the following steps is not taken by management when developing a flexible budget?
question
supervision
answer
In a flexible budget, a cost that would remain the same at each activity level is
question
$332,000
answer
In-Step Manufacturing uses a flexible budget. It has the following budgeted manufacturing costs for 25,000 pairs of shoes: Fixed Manufacturing Costs, $12,000 and Variable Manufacturing Costs, $16.00 per pair of shoes. If In-step Manufacturing makes 20,000 pairs of shoes this month, what are the total budgeted manufacturing cost for the month?
question
56,000 machine hours
answer
The processing department has monthly budgeted manufacturing overhead of $180,000 plus $3.00 per machine hour. If a flexible budget report shows $348,000 for total budgeted manufacturing overhead costs for the month, what was the actual level of activity achieved during the month?
question
true
answer
Costs incurred indirectly and allocated to a responsibility level are considered to be non-controllable at that level
question
true
answer
Cost centers are usually either production departments or service departments
question
means that top management has to investigate every budget difference
answer
all of the following statements are correct about management by exception except it
question
the department manager sees a controllable costs of his or her respective department
answer
a company produces four reports in its responsibility reporting system, one for each level of management: department managers, plant managers, division managers, and the company vice president. Which statement is correct concerning the content of the respective reports?