Activities
answer
Project steps that consume resources and/or time.
question
Activity-on-arrow (AOA)
answer
Network diagram convention in which arrows designate activities
question
Activity-on-node (AON)
answer
Network diagram convention in which nodes designate activities.
question
Beta distribution
answer
Used to describe the inherent variability in activity time estimates.
question
CPM
answer
Critical path method, for planning and coordinating large projects.
question
Crash
answer
Shortening activity durations.
question
Critical activities
answer
Activities on the critical path.
question
Critical path
answer
The longest path; determines expected project duration.
question
Deterministic
answer
Time estimates that are fairly certain.
question
Events
answer
The starting and finishing of activities, designated by nodes in the AOA convention.
question
Independence
answer
Assumption that path duration times are independent of each other; requiring that activity times be independent, and that each activity is on only one path.
question
Most likely time
answer
The most probable length of time that will be required.
question
Network (precedence) diagram
answer
Diagram of project activities that shows sequential relationships by use of arrows and nodes.
question
Optimistic time
answer
The length of time required under optimal conditions.
question
Path
answer
A sequence of activities that leads from the starting node to the finishing node.
question
PERT
answer
Program evaluation and review technique, for planning and coordinating large projects.
question
Pessimistic time
answer
The length of time required under the worst conditions.
question
Precedence diagram
answer
Diagram of project activities that shows sequential relationships by use of arrows and nodes.
question
Probabilistic
answer
Estimates of times that allow for variation.
question
Project champion
answer
A person who promotes and supports a project.
question
Projects
answer
Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.
question
Slack
answer
Allowable slippage for a path; the difference between the length of a path and the length of the critical path.
question
Virtual project teams
answer
Some or all of the team members are geographically separated.
question
Work breakdown structure (WBS)
answer
A hierarchical listing of what must be done during a project.
question
Work breakdown structure (WBS) purpose
answer
underscored by the fact that the activity list that results serves as the focal point for planning and doing the project
question
Five phases of a project life cycle?
answer
1. Initiating-- outlining the expected costs, benefits, and risks associated with the project 2. Planning- provides details on deliverables, scope, budget, schedule and milestones, performance objectives, resources needed, and plan for handling risks. 3. Executing- actual work carried out 4. Monitoring and Controlling- occurs at the same time as project execution 5. Closing- ends the project
question
How is project management different from general management?
answer
1. Limited time frame 2. Narrow focus, specific objectives 3. Less bureaucratic
question
Why is project management used?
answer
1. Special needs that don't lend themselves to functional management 2. Pressures for new or improved products or services, cost reduction
question
What are the key project metrics?
answer
1. Time 2. Cost 3. Performance objectives
question
What are the main tools of project management?
answer
1.Work breakdown structure-initial planning 2. Network diagram- big picture 3. Gantt charts- visual aid 4. Risk management- analyses of potential failures or problems
question
What are the key decision steps in project management?
answer
1. Deciding which projects to implement 2. Selecting the project manager 3. Selecting the project team 4. Planning and designing the project 5. Managing and controlling project resources 6. Deciding if and when a projects should be terminated
question
Project champions
answer
a person who promotes and supports a project
question
Why are project champions used?
answer
Instrumental in facilitating the work of the project manager by "talking up" the project to other managers who might be asked to share resources with the project team
question
Expected time of an activity formula
answer
te= to+4tm+tp/6 to= Optimistic time tm= Most likely time (mode) tp= Pessimistic time
question
Variance of an activity (squaring the standard deviation)
answer
o^2= [(tp-to)/6]^2 or (tp-to)^2/36 to= Optimistic time tp= Pessimistic time
question
Standard deviation of a path
answer
=sqrt(sum of variances of activities on path)
question
Probability that a given path will be completed in a specified length of time
answer
z= specified time - path mean / path standard deviation
question
Rule of thumb
answer
If the value of z is 13.00 or more, treat the probability of path completion by the specified time as 100 percent
question
Crash
answer
shortening activity durations
question
What extent should a project be crashed?
answer
1. Regular time and crash time estimates for each activity 2. Regular cost and crash cost estimates for each activity 3. A list of activities that are on the critical path
question
General procedure for crashing is
answer
1. Crash the project one period at a time 2. Crash the least expensive activity that is on the critical path 3. When there are multiple critical paths, find the sum of crashing the least expensive activity on each critical path.
question
What ways can project management software be helpful?
answer
1. Assign resources 2. Compare project plan versions 3. Evaluate changes 4. Track performance
question
The Nature of Projects: matrix organization
answer
allows them to integrate the activities of a variety o specialists within a functional framework
question
In the planning stage, The Project Manager
answer
must prepare a scope statement that spells out the deliverables and goals, determine required skills and resources needed, develop a schedule and budget, and develop plans for managing the scope, the schedule, the budget, and quality risk.
question
The Project Manager
answer
bears the ultimate responsibility for the success or failure of the project
question
What is the project manager responsible for?
answer
1. Work 2. Human resources 3. Communications 4. Quality 5. Time 6. Costs 7. Scope
question
Project management triangle (set of skills)
answer
1. ability to motivate and direct team members 2. make trade-off decisions 3. expedite the work when necessary 4. put out fires 5. monitor time 6. budget 7. technical duties
question
The Project Management Institute (PMI) administers a globally recognized, examination based professional certification program that maintains T/F
answer
True
question
Pros of working on projects
answer
1. Potential rewards of being involved in a project 2. dynamic environment that surrounds a project 3. challenge of working under pressure and solving new problems 4. opportunities to meet new people and increase future job opportunities 5. association can be a sign of status 6. inspire team spirit, increase morale, and motivation
question
Cons of working on projects
answer
1. Interrupt their regular jobs 2. Managers don't want to lose output of good workers 3. Workers aren't eager to participate in projects 4. May disrupt friendships and daily routines 5. Risks of being replaced on current job 6. Fear of being associated with an unsuccessful project
question
What is a Gantt chart?
answer
visual tool for planning and scheduling simple projects ; enables managers to initially schedule project activities and then to monitor progress over time by comparing planned progress to actual progress
question
By using PERT or CPM, managers are able to obtain
answer
1. graphical display of project activities 2. estimate of how long the project will take 3. indication of which activities are the most critical to timely project completion 4. indication of how long any activity can be delayed without delaying the project.
question
Main determinant of the way PERT and CPM networks are analyzed and interpreted is whether activity time estimates are _______ or _______.
answer
probabilistic or deterministic
question
probabilistic
answer
estimates of times that allow for variation
question
deterministic
answer
time estimates that are fairly certain
question
Budget Control is a
answer
critical aspect of a project
question
The goal in evaluating time-cost trade offs is to identify activities that will reduce the sum of the project costs T/F
answer
True
question
To crash and on the extent of crashing desirable, a manager needs certain information
answer
1. regular time and crash time est. for each activity 2. regular cost and crash cost estimates for each activity 3. list of activities that are on the critical path
question
Advantages of Using PERT
answer
1. techniques forces the manager to organize and quantify available information and to recognize where additional info is needed 2. provide graphic display of the project and its major activities 3. identify activities that should be watched, slack time
question
Potential Sources of Error when using PERT
answer
1. omit one or more activities 2. precedence relationships may not all be correct 3. time est. may include fudge factors 4. tendency to focus solely on activities that are on the critical path
question
Critical Chain Project Management (CCPM)
answer
approach to project management that includes an emphasis on the resources required to execute project tasks
question
Six-sigma projects
answer
tend to have narrow focus; involve all of the typical elements and requirements of general project management
question
Virtual project teams
answer
some or all of the team members are geographically separated
question
Steps in risk management
answer
1. Identify risks 2. Evaluate to determine probability of occurrence and the potential consequences 3. Monitor
question
One path in a precedence diagram has four activities. If the standard deviation of each activity is 3.0, the path standard deviation is:
answer
The path standard deviation is equal to the square root of the sum of the activity variances, which is the square root of 36: 32 + 32 + 32 + 32 = 36. sqrt(36)=6
question
What is the variance of an activity that has these three time estimates? 4-7-10
answer
(10 - 4)2/36 = 36/36 = 1
question
What is the mean of an activity that has these three time estimates? 3-5-10
answer
(1(3) + 4(5) 1(10))/6 = 33/6 = 5.5
question
Which one is not a key project metric?
answer
effort
question
Which one of these
answer
Use of resources.
question
In PERT, the distribution that is used to describe activity times is
answer
beta
question
An important assumption in probabilistic computations is
answer
activity times are independent.
question
If the z value for a path is greater than +3.00, the probability that it will be completed on time is zero. T/F
answer
False
question
T/F The only candidates for crashing are activities that are on the critical path.
answer
True
question
A project champion is a project manager who has successfully completed a number of projects.T/F
answer
False
question
Two activities in a PERT diagram cannot begin with the same node and end with the same node.T/F
answer
True
question
The standard deviation of a path is equal to the sum of the standard deviations of the path's activities. T/F
answer
false
question
A dummy activity is sometimes needed in an activity-on-node diagram. T/f
answer
false
question
A key feature of the critical chain approach is the use of various buffers.
answer
True
question
The critical chain approach in project management emphasizes supply chain relationships. t/f
answer
false
question
Projects typically go through a sequence of stages, referred to as a life cycle. T/f
answer
true
question
The slack of any path is the difference between its time length and the time length of the critical path. T/f
answer
true
question
The critical path is the path that has the most activities. T/f
answer
false
question
An activity that is at the intersection of two paths is a critical activity. t/f
answer
false
question
An activity may be on more than one path in a network diagram. t/f
answer
true
question
A path is a sequence of activities in a project that stretches from its beginning to its end. T/f
answer
true
question
Projects are large, complex sets of tasks that must be completed in a limited timeframe. T/f
answer
false
question
Activity 7-8 is directly preceded by two activities, activity 5-7 and activity 6-7. Activity 5-7 has an expected time of five and an ES time of eight. Activity 6-7 has an expected time of seven and an ES time of seven. Activity 7-8 has an expected time of nine. The EF for activity 7-8 is:
answer
23
question
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2 days. The standard deviation of the critical path is:
answer
1^2+2^2+4^2+2^2=25 sqrt(25)=5
question
Trading the costs of shorter activity times for the benefits of an earlier project completion is called:
answer
crashing.
question
A node has one entering activity, 2-3, and two leaving activities, 3-4 and 3-5. Given the following, determine the latest starting time (LS) for activity 2-3: EF for 3-4 = 15, EF for 3-5 = 18, latest finish time (LF) for 3-4 = 24, LF for 3-5 = 27, activity times are 2-3 = 4, 3-4 = 6, and 3-5 = 8.
answer
14
question
All of the following are true about the critical path, except:
answer
the critical path is the path that has the greatest number of activities.
question
Which of the following is not a form of risk reduction in project management?
answer
scenario analysis
question
Given this information about activity 3-4: ES = 10, EF = 15, LS = 16, and LF = 21, we can determine that the amount of slack associated with the activity is:
answer
6
question
According to the Stevenson textbook, which of the following is not typically a phase of a project life cycle?
answer
Defining
question
Which of the following would probably not benefit from the use of PERT/CPM for scheduling and planning?
answer
Cutting lumber at a sawmill.
question
What is the variance of an activity that has these three time estimates? 4-7-10
answer
1.00