PMP 8: Project Quality Management – Flashcards

Unlock all answers in this set

Unlock answers
question
Project Quality Management
answer
Includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken
question
Characteristics of Project Quality Management
answer
• It implements the quality management system through policy and procedures with continuous process improvement activities conducted throughout, as appropriate. • Addresses the management of the project and the product of the project. • It applies to all projects, regardless of the nature of their product.
question
Product Quality
answer
measures and techniques that are specific to the type of product produced by the project
question
Quality
answer
the degree to which a set of inherent characteristics fulfill requirements
question
Grade
answer
a category assigned to products or services having the same functional use but different technical characteristics
question
Quality vs Grade
answer
• While a quality level that fails to meet quality requirements is always a problem, low grade may not be. • The project manager and the project management team are responsible for managing the tradeoffs involved to deliver the required levels of both quality and grade
question
Precision
answer
the values of repeated measurements are clustered and have little scatter
question
Accuracy
answer
that the measured value is very close to the true value
question
Precision vs Accuracy
answer
• Precise measurements are not necessarily accurate. • A very accurate measurement is not necessarily precise. • The project management team must determine appropriate levels of accuracy and precision
question
Basic Project Quality Management approach is meant to be compatible with..
answer
International Organization for Standardization (ISO)
question
International Organization for Standardization (ISO)
answer
compatible with proprietary approaches to quality management such as those recommended by Deming, Juran, Crosby, and others, and non-proprietary approaches such as Total Quality Management (TQM), Six Sigma, failure mode and effect analysis (FMEA), design reviews, voice of the customer, cost of quality (COQ), and continuous improvement
question
Quality and Project Management Disciplines both recognize the importance of...
answer
• Customer satisfaction. • Prevention over inspection • Continuous improvement • Management responsibility • Cost of quality (COQ)
question
Customer Satisfaction
answer
Understanding, evaluating, defining, and managing expectations so that customer requirements are met. This requires a combination of conformance to requirements (to ensure the project produces what it was created to produce) and fitness for use (the product or service must satisfy real needs)
question
Prevention Over Inspection
answer
One of the fundamental tenets of modern quality management states that quality is planned, designed, and built in—not inspected in. The cost of preventing mistakes is generally much less than the cost of correcting them when they are found by inspection
question
Continuous Improvement
answer
The plan-do-check-act cycle is the basis for quality improvement as defined by Shewhart and modified by Deming. In addition, quality improvement initiatives undertaken by the performing organization, such as TQM and Six Sigma, should improve the quality of the project's management as well as the quality of the project's product
question
Process Improvement Models
answer
• Malcolm Baldridge • Organizational Project Management Maturity Model (OPM3®) • Capability Maturity Model Integrated (CMMI®)
question
Management Responsibility
answer
Success requires the participation of all members of the project team, but remains the responsibility of management to provide the resources needed to succeed
question
Cost of Quality (COQ)
answer
refers to the total cost of all efforts related to quality throughout the product life cycle Project decisions can impact operational costs of quality as a result of product returns, warranty claims, and recall campaigns. Therefore, due to the temporary nature of a project, the sponsoring organization may choose to invest in product quality improvement, especially defect prevention and appraisal, to reduce the external cost of quality
question
Project Quality Management Processes
answer
8.1 Plan Quality 8.2 Perform Quality Assurance 8.3 Perform Quality Control
question
Plan Quality Process Group
answer
Planning Process Group
question
Perform Quality Assurance
answer
Executing Process Group
question
Perform Quality Control
answer
Monitoring and Controlling Process Group
question
Plan Quality
answer
The process of identifying quality requirements and/or standards for the project and product, and documenting how the project will demonstrate compliance
question
When should Quality Planning be performed?
answer
Quality planning should be performed in parallel with the other project planning processes.
question
Inputs to Plan Quality
answer
1. Scope Baseline 2. Stakeholder Register 3. Cost Performance Baseline 4. Schedule Baseline 5. Risk Register 6. Enterprise Environmental Factors 7. Organizational Process Assets
question
Tools and Techniques for Plan Quality
answer
1. Cost Benefit Analysis 2. Cost of Quality (COQ) 3. Control Charts 4. Benchmarking 5. Design of Experiments 6. Statistical Sampling 7. Flowcharting 8. Proprietary Quality Management Methodologies 9. Additional Quality Planning Tools
question
Outputs of Plan Quality
answer
1. Quality Management Plan 2. Quality Metrics 3. Quality Checklists 4. Process Improvement Plan 5. Project Document Updates
question
Elements of Scope Baseline Use in Plan Quality
answer
• Scope statement. • WBS. • WBS Dictionary.
question
Scope Statement Use in Plan Quality
answer
Contains the project description, major project deliverables, and acceptance criteria. The product scope description will often contain details of technical issues and other concerns that can affect quality planning. The definition of acceptance criteria can significantly increase or decrease project costs and quality costs. Satisfying all acceptance criteria implies the needs of the customer have been met.
question
WBS Use in Plan Quality
answer
Identifies the deliverables, the work packages and the control accounts used to measure project performance.
question
WBS Dictionary Use in Plan Quality
answer
The WBS dictionary defines technical information for WBS elements.
question
Stakeholder Register Use in Plan Quality
answer
Identifies stakeholders with a particular interest in , or impact on, quality
question
Cost Performance Baseline Use in Plan Quality
answer
Documents the accepted time phase used to measure cost performance
question
Schedule Baseline Use in Plan Quality
answer
Documents the accepted schedule performance measures including start and finish dates
question
Risk Register Use in Plan Quality
answer
Contains information on threats and opportunities that may impact quality requirements
question
Plan Quality: Enterprise Environmental Factors
answer
• Governmental agency regulations • Rules, standards, and guidelines specific to the application area • Working/operating conditions of the project/product which may affect project quality
question
Plan Quality: Organizational Process Assets
answer
• Organizational quality policies, procedures and guidelines • Historical databases • Lessons learned from previous projects • Quality policy, as endorsed by senior management, which sets the intended direction of a performing organization with regard to quality.
question
Quality Policy Use in Plan Quality
answer
• The quality policy of the performing organization for their products often can be adopted "as is" for use by the project. • If the performing organization lacks a formal quality policy, or if the project involves multiple performing organizations (as with a joint venture), the project management team will need to develop a quality policy for the project. • Regardless of the origin of the quality policy, the project management team must ensure that the project stakeholders are fully aware of the policy used for the project through the appropriate distribution of information
question
Cost Benefit Analysis
answer
The primary benefits of meeting quality requirements can include less rework, higher productivity, lower costs, and increased stakeholder satisfaction. A business case for each quality activity compares the cost of the quality step to the expected benefit
question
Cost of Quality (COQ)
answer
Cost of quality includes all costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirements, and failing to meet requirements (rework)
question
Failure Costs Categories
answer
• Internal (found by the project) • External (found by the customer).
question
Failure Costs
answer
Costs of poor quality
question
Control Charts
answer
Control charts are used to determine whether or not a process is stable or has predictable performance, using upper and lower specification limits, which are based on requirements of the contract
question
Upper and Lower Control Limits
answer
They reflect the maximum and minimum values allowed. There may be penalties associated with exceeding the specification limits
question
Characteristics of Control Limits
answer
• Upper and lower control limits are set by the project manager and appropriate stakeholders to reflect then points at which corrective action will be taken to prevent exceeding specification limits. • For repetitive processes, the control limits are generally ± 3σ. • A process is considered out of control when a data point exceeds a control limit or if seven consecutive points are above or below the mean
question
Uses for Control Charts
answer
monitor cost and schedule variances, volume, and frequency of scope changes, or other management results to help determine if the project management processes are in control
question
Benchmarking
answer
Involves comparing actual or planned project practices to those of comparable projects to identify best practices, generate ideas for improvement, and provide a basis for measuring performance. These other projects can be within the performing organization or outside of it and can be within the same or in another application area
question
Design of Experiments
answer
A statistical method for identifying which factors may influence specific variables of a product or process under development or in production
question
DOE
answer
Design of Experiments
question
Characteristics of DOE
answer
• DOE should be used during the Plan Quality process to determine the number and type of tests and their impact on cost of quality. • DOE also plays a role in the optimization of products or processes. • DOE can be used to reduce the sensitivity of product performance to sources of variations caused by environmental or manufacturing differences. • One important aspect of this technique is that it provides a statistical framework for systematically changing all of the important factors, rather than changing the factors one at a time. • Analysis of the experimental data should provide the optimal conditions for the product or process, highlight the factors that influence the results, and reveal the presence of interactions and synergy among the factors
question
Statistical Sampling
answer
Involves choosing part of a population of interest for inspection (for example, selecting ten engineering drawings at random from a list of seventy-five)
question
Characteristics of Statistical Sampling
answer
• Sample frequency and sizes should be determined during the Plan Quality process so the cost of quality will include the number of tests, expected scrap, etc. • There is a substantial body of knowledge on statistical sampling. In some application areas it may be necessary for the project management team to be familiar with a variety of sampling techniques to assure the sample selected actually represents the population of interest
question
Flowcharting
answer
A graphical representation of a process showing the relationships among process steps
question
Characteristics of Flowcharting
answer
• There are many styles, but all process flowcharts show activities, decision points, and the order of processing. • During quality planning, flowcharting can help the project team anticipate quality problems that might occur. • An awareness of potential problems can result in the development of test procedures or approaches for dealing with them
question
Proprietary Quality Management Methodologies
answer
These include Six Sigma, Lean Six Sigma, Quality Function Deployment, CMMI®, etc. Many other methodologies exist
question
Additional Quality Planning Tools
answer
• Brainstorming • Affinity Diagrams • Force Field Analysis • Nominal Group Techniques • Matrix Diagrams • Prioritization Matrices
question
Affinity Diagrams
answer
used to visually identify logical groupings based on natural relationships
question
Force Field Analysis
answer
which are diagrams of the forces for and against change
question
Nominal Group Techniques
answer
to allow ideas to be brainstormed in small groups and then reviewed by a larger group
question
Matrix Diagrams
answer
which include two, three, or four groups of information and show relationships between factors, causes, and objectives. Data in a matrix is organized in rows and columns with intersecting cells that can be filled with information that describes the demonstrated relationship between the items located in the row and column
question
Prioritization Matrices
answer
which provide a way of ranking a diverse set of problems and/or issues (usually generated through brainstorming) by their importance
question
Quality Management Plan
answer
Describes how the project management team will implement the performing organization's quality policy. It is a component or a subsidiary plan of the project management plan
question
Characteristics of the Quality Management Plan
answer
• Provides input to the overall project management plan and includes quality control, quality assurance, and continuous process improvement approaches for the project. • May be formal or informal, highly detailed, or broadly framed. The style and detail is determined by the requirements of the project. • Should be reviewed early in the project to ensure that decisions are based on accurate information. • The benefits of this review can include reduction of cost and schedule overruns caused by rework
question
Quality Metrics
answer
Is an operational definition that describes, in very specific terms, a project or product attribute and how the quality control process will measure it
question
A measurement is a
answer
actual value
question
Tolerance
answer
defines the allowable variations on the metrics. For example, a metric related to the quality objective of staying within the approved budget by ± 10% could be to measure the cost of every deliverable and determine the percent variance from the approved budget for that deliverable
question
Quality Metrics Use
answer
Used in the quality assurance and quality control processes.
question
Examples of Quality Metrics
answer
Some examples of quality metrics include on-time performance, budget control, defect frequency, failure rate, availability, reliability, and test coverage
question
Quality Checklists
answer
A checklist is a structured tool, usually component-specific, used to verify that a set of required steps has been performed.Checklists range from simple to complex based on project requirements and practices
question
Quality Checklists Use
answer
Used in the Quality Control Process
question
Process Improvement Plan
answer
Is a subsidiary of the project management plan. Details the steps for analyzing processes to identify activities which enhance their value
question
Areas to Consider in the Process Improvement Plan
answer
• Process boundaries • Process configuration • Process metrics • Targets for improved performance
question
Process Boundaries
answer
Describes the purpose of processes, their start and end, their inputs/outputs, the data required, the owner, and the stakeholders
question
Process Configuration
answer
A graphic depiction of processes, with interfaces identified, used to facilitate analysis
question
Process Metrics
answer
Along with control limits, allows analysis of process efficiency
question
Targets for Improved Performance
answer
Guides the process improvement activities
question
Plan Quality: Project Document Updates
answer
• Project documents that may be updated include, but are not limited to: • Stakeholder register, and • Responsibility Assignment Matrix
question
Perform Quality Assurance
answer
The process of identifying quality requirements and/or standards for the project, product and documenting how the project will demonstrate compliance
question
Characteristics of Perform Quality Assurance
answer
• Provides an umbrella for continuous process improvement, which is an iterative means for improving the quality of all processes. • Continuous process improvement reduces waste and eliminates activities that do not add value. • This allows processes to operate at increased levels of efficiency and effectiveness
question
Inputs to Perform Quality Assurance
answer
1. Project Management Plan 2. Quality Metrics 3. Work Performance Information 4. Quality Control Measurements
question
Tools and Techniques for Perform Quality Assurance
answer
1. Plan Quality and Perform Quality Control Tools and Techniques 2. Quality Audits 3. Process Analysis
question
Outputs of Perform Quality Assurance
answer
1. Organizational Process Assets Updates 2. Change Requests 3. Project Management Plan Updates 4. Project Document Updates
question
Project Management Plan Use in Perform Quality Assurance
answer
• Quality management plan • Process improvement plan
question
Quality Management Plan Use in Perform Quality Assurance
answer
The quality management plan describes how quality assurance will be performed within the project
question
Process Improvement Plan Use in Perform Quality Assurance
answer
The process improvement plan details the steps for analyzing processes to identify activities which enhance their value
question
Work Performance Information Use in Perform Quality Assurance
answer
Performance information from project activities is routinely collected as the project progresses. Performance results which may support the audit process include, but are not limited to: • Technical performance measures, • Project deliverables status, • Schedule progress, and • Costs incurred.
question
Quality Control Measurements Use in Perform Quality Assurance
answer
The results of quality control activities. They are used to analyze and evaluate the quality standards and processes of the performing organization
question
Quality Audit
answer
Is a structured, independent review to determine whether project activities comply with organizational and project policies, processes, and procedures
question
Objective of Quality Audits
answer
• Identify all the good/best practices being implemented, • Identify all the gaps/shortcomings, • Share the good practices introduced or implemented in similar projects in the organization and/or industry, • Proactively offer assistance in a positive manner to improve implementation of processes to help the team raise productivity, and • Highlight contributions of each audit in the lessons learned repository of the organization
question
Characteristics of Quality Audits
answer
• The subsequent effort to correct any deficiencies should result in a reduced cost of quality and an increase in sponsor or customer acceptance of the project's product. • Quality audits may be scheduled or random and may be conducted by internal or external auditors. • Quality audits can confirm the implementation of approved change requests including corrective actions, defect repairs, and preventive actions
question
Process Analysis
answer
Follows the steps outlined in the process improvement plan to identify needed improvements. This analysis also examines problems experienced, constraints experienced, and non-value-added activities identified during process operation. Process analysis includes root cause analysis
question
Root Cause Analysis
answer
a specific technique to identify a problem, discover the underlying causes that lead to it, and develop preventive actions
question
Perform Quality Assurance: Organizational Process Assets Updates
answer
Elements of the organizational process assets that may be updated include, but are not limited to, the quality standards
question
Perform Quality Assurance: Change Requests
answer
• Quality improvement includes taking action to increase the effectiveness and/or efficiency of the policies, processes, and procedures of the performing organization. • Change requests are created and used as input into the Perform Integrated Change Control process to allow full consideration of the recommended improvements. • Change requests can be used to take corrective action or preventive action or to perform defect repair
question
Perform Quality Assurance: Project Management Plan Updates
answer
• Quality management plan • Schedule management plan • Cost management plan
question
Perform Quality Assurance: Project Document Updates
answer
• Quality audit reports • Training plans • Process documentation
question
Perform Quality Control
answer
The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes
question
Characteristics of Perform Quality Control
answer
• Quality control is performed throughout the project • Quality control is often performed by a quality control department or similarly titled organizational unit. • Quality control activities identify causes of poor process or product quality and recommend and/or take action to eliminate them • The project management team should have a working knowledge of statistical quality control, especially sampling and probability, to help evaluate quality control outputs.
question
Quality Standards
answer
Include project processes and product goals
question
Project Results
answer
Include deliverables and project management results, such as cost and schedule performance
question
Prevention
answer
keeping errors out of the process
question
Inspection
answer
keeping errors out of the hands of the customer
question
Attribute Sampling
answer
the result either conforms or does not conform
question
Variable Sampling
answer
the result is rated on a continuous scale that measures the degree of conformity
question
Tolerances
answer
specified range of acceptable results
question
Control Limits
answer
thresholds, which can indicate whether the process is out of control
question
Inputs to Perform Quality Control
answer
1. Project Management Plan 2. Quality Metrics 3. Quality Checklists 4. Work Performance Measurements 5. Approved Change Requests 6. Deliverables 7. Organizational Process Assets
question
Tools and Techniques for Perform Quality Control
answer
1. Cause and Effect Diagrams 2. Control Charts 3. Flowcharting 4. Histogram 5. Pareto Chart 6. Run Chart 7. Scatter Diagram 8. Statistical Sampling 9. Inspection 10. Approved Change Requests Review
question
Ishikawa's seven basic tools of quality
answer
1. Cause and Effect Diagrams 2. Control Charts 3. Flowcharting 4. Histogram 5. Pareto Chart 6. Run Chart 7. Scatter Diagram
question
Outputs of Perform Quality Control
answer
1. Quality Control Measurements 2. Validated Changes 3. Validated Deliverables 4. Organizational Process Assets Updates 5. Change Requests 6. Project Management Plan Updates 7. Project Document Updates
question
Project Management Plan Use in Perform Quality Control
answer
• Contains the quality management plan, which is used to control quality • The quality management plan describes how quality control will be performed within the project
question
Work Performance Measurements Use in Perform Quality Control
answer
Used to produce project activity metrics to evaluate actual progress as compared to planned progress. These metrics include: • Planned s. Actual technical performance • Planned s. Actual schedule performance • Planned s. Actual cost performance
question
Approved Change Requests Use in Perform Quality Control
answer
• As part of the Perform Integrated Change Control process a change control status update will indicate that some changes are approved and some are not. The timely implementation of approved changes needs to be verified
question
Approved Change Requests
answer
Include modifications such as defect repairs, revised work methods and revised schedule.
question
Perform Quality Control: Organizational Process Assets
answer
• Quality standards and policies • Standard work guidelines • Issue and defect reporting procedures and communication policies
question
Cause and Effect Diagrams
answer
Also called Ishikawa diagrams or fishbone diagram. Illustrate how various factors might be linked to potential problems or effects
question
Control Charts Use in Perform Quality Control
answer
Illustrate how a process behaves over time and when a process is subject to special cause variation, resulting in an out-of-control condition
question
Characterisitics of Control Charts
answer
• The appropriate data is collected and analyzed to indicate the quality status of project processes and products. • They graphically answer the question: "Is this process variance within acceptable limits?" • The pattern of data points on a control chart may reveal random fluctuating values, sudden process jumps, or a gradual trend in increased variation. • By monitoring the output of a process over time, a control chart can help assess whether the application of process changes resulted in the desired improvements. • When a process is within acceptable limits it is in control and does not need to be adjusted. • Conversely, when a process is outside acceptable limits, the process should be adjusted. • Seven consecutive points above or below the central line indicate a process that is out of control. • The upper control limit and lower control limit are usually set at ±3σ, where 1σ is one standard deviation
question
Characteristics of Cause and Effect Diagrams
answer
• possible root cause can be uncovered by continuing to ask "why" or "how" . • "Why-Why" and "How-How" diagrams may be used in root cause analysis. • Cause and effect diagrams are also used in risk analysis
question
Flowcharting Use in Perform Quality Control
answer
Used during Perform Quality Control to determine a failing process step(s) and identify potential process improvement opportunities. Flowcharting is also used in risk analysis
question
Histogram
answer
Illustrates the most common cause of problems in a process by the number and relative heights of the bars
question
Characteristics of Histograms
answer
• A vertical bar chart showing how often a particular variable state occurred. • Each column represents an attribute or characteristic of a problem/situation. • The height of each column represents the relative frequency of the characteristic.
question
Pareto Chart
answer
Also referred to as a Pareto diagram, is a specific type of histogram, ordered by frequency of occurrence. It shows how many defects were generated by type or category of identified cause
question
Characteristics of Pareto Charts
answer
• Rank ordering is used to focus corrective action. • The project team should address the causes creating the greatest number of defects first. • Pareto diagrams are conceptually related to Pareto's Law • Pareto diagrams can also be used to summarize various types of data for 80/20 analyses.
question
Pareto's Law
answer
holds that a relatively small number of causes will typically produce a majority of the problems or defects. This is commonly referred to as the 80/20 principle
question
80/20 Principle
answer
where 80% of the problems are due to 20% of the causes
question
Run Chart
answer
Similar to a control chart without displayed limits, a run chart shows the history and pattern of variation
question
Characteristics of a Run Chart
answer
• Is a line graph that shows data points plotted in the order in which they occur. • Show trends in a process over time, variation over time, or declines or improvements in a process over time. • Trend analysis is performed using run charts and involves mathematical techniques to forecast future outcomes based on historical results
question
Trend Analysis
answer
Involves mathematical techniques to forecast future outcomes based on historical results
question
Trend Analysis is often used to monitor
answer
• Technical Performance • Cost and Schedule Performance
question
Technical Performance: Trend Analysis
answer
How many errors or defects have been identified, and how many remain uncorrected
question
Cost and Schedule Performance: Trend Analysis
answer
How many activities per period were completed with significant variances
question
Scatter Diagram
answer
Shows the relationship between two variables
question
Characteristics of Scatter Diagrams
answer
• Allows the quality team to study and identify the possible relationship between changes observed in two variables. • Dependent variables versus independent variables are plotted. • The closer the points are to a diagonal line, the more closely they are related
question
Statistical Sampling
answer
Samples are selected and tested as defined in the quality plan
question
Inspection
answer
Is the examination of a work product to determine whether it conforms to documented standards.
question
Characteristics of Inspection
answer
• The results of an inspection generally include measurements and may be conducted at any level. • In some application areas, these terms have narrow and specific meanings. • Inspections are also used to validate defect repairs
question
Approved Change Requests Reviews
answer
All approved change requests should be reviewed to verify that they were implemented as approved
question
Quality Control Measurements
answer
Are the documented results of quality control activities in the format specified during quality planning
question
Validated Changes
answer
Any change or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided. Reject items may require rework
question
Validated Deliverables
answer
• A goal of quality control is to determine the correctness of deliverables. • The results of the execution quality control processes are validated deliverables. • Validated deliverables are an input to Verify Scope for formalized acceptance
question
Perform Quality Control: Organizational Process Assets Updates
answer
• Completed checklists. The completed checklists become part of the project's records • Lessons learned documentation. The causes of variances, the reasoning behind the corrective action chosen, and other types of lessons learned from quality control are documented so they become part of the historical database for both the project and the performing organization. Lessons learned are documented throughout the project life cycle, but at a minimum, during project closure.
question
Perform Quality Control: Change Requests
answer
If the recommended corrective or preventive actions or a defect repair requires a change to the project management plan, a change request should be initiated in accordance with the defined Perform Integrated Change Control process
question
Perform Quality Control: Project Management Plan Updates
answer
• Quality management plan • Process improvement plan
question
Perform Quality Control: Project Document Updates
answer
• Quality standards
question
Survey of the entire population yields
answer
accurate data
question
Fishbone diagrams
answer
Ishikawa / Cause and Effect Diagrams
question
Standard deviation
answer
Is a distance of measurement from the mean or, the square root of the average of the squares of deviations (about) the mean of a set of data. Standard deviation is a statistical measure of spread or variability
question
Standard Normal Distribution
answer
shows standard deviation (sigma) as distance of the measurement from the mean value
question
Quality Metric is not used for
answer
determining process improvements
question
Quality Metrics are used in
answer
the Perform Quality Assurance and Perform Quality Control processes
question
Gold-plating
answer
certain features are added to the deliverable which were not asked for by the customer, to earn customer appreciation. It is not a recommended project management practice
question
Prevention and Appraisal costs
answer
(cost of conformance) include costs for quality planning, quality control (QC), and quality assurance to ensure compliance to requirements (i.e., training, QC systems, etc.).
question
Failure Costs
answer
(cost of non-conformance) include costs to rework products, components, or processes that are non-compliant, costs of warranty work and waste, and loss of reputation.
question
Prevention Costs
answer
costs incurred by an organization to create high quality products in order to avoid failures. They include cost of training, cost of documenting processes, cost of equipment, etc.
question
Quality Audit is Technique used in
answer
Perform Quality Assurance process
question
Failure Costs include
answer
• costs to rework products, components, or processes that are non-compliant; • costs of warranty work and waste; and • costs due to loss of reputation
question
Juran
answer
• Pareto Principle • Juran Trilogy: Planning, Control and Improvement • Defines quality as fitness for use
question
Crosby
answer
• Doing It Right First Time (DIRFT) • Quality is Conformance to Requirements • System of quality is Prevention • Performance standard is Zero Defects • Measurement of quality is the price of non-conformance
question
Deming
answer
• increase quality and reduce costs by practicing continuous process improvement • Deming Cycle: Plan, Do, Check, Act, Analyze