SCM304 Chapter 7
Unlock all answers in this set
Unlock answersquestion
The work activity that effectively limits throughput of a process is called a ____
answer
bottleneck
question
A legal defense preparation is an example of a project.
answer
TRUE
question
In service operations, significant volume increases can and frequently are made without changes in the service process, as would be expected in manufacturing.
answer
TRUE
question
Which is the correct order of hierarchy?
answer
Value chain, process, activity, task
question
Job shop processes use flexible, general purpose equipment that is capable of customizing work for individual customers.
answer
TRUE
question
Which one of the following major activities is not one of the six major activities to design a goods-producing or service-providing process?
answer
Use the product life cycle for each good or service to create a future state process map.
question
Improving process designs nearly always focuses on decreasing costs.
answer
FALSE
question
Dell computers and Subway sandwiches are examples of ____ goods.
answer
option
question
A custom good or service is produced in anticipation of demand.
answer
FALSE
question
The lowest resource utilization is usually found in
answer
job shop
question
Automobile factories and hospital laboratory work are examples of
answer
flow shop processes
question
What is least related to Value Stream Mapping?
answer
reengineering
question
Which one of the following best describes reengineering?
answer
radical redesign
question
Process mapping can be characterized as the fundamental rethinking and radical redesign of business processes.
answer
FALSE
question
____ offer customers broad freedom to select the pathways that are best suited for their immediate needs and wants from many possible pathways through the service delivery system.
answer
Customer-routed pathways
question
What type of process would a paper mill most likely use?
answer
Continuous flow process
question
Ships, weddings and estate planning are examples of ____ goods and services
answer
make-to-order
question
A pathway is a route that a product takes in a job shop.
answer
FALSE
question
During which phase of a product's life cycle does low unit cost become a top competitive priority?
answer
maturity
question
A bottleneck is the work activity that effectively limits throughput of a process.
answer
TRUE