Project Management Midterm Test Questions – Flashcards
Unlock all answers in this set
Unlock answersquestion
            Project managers would prefer to communicate in which of the following manners if given a choice?
answer
        Informal and oral
question
            Which type of interpersonal influences would be represented by a project manager that has a command of technology?
answer
        Expert Power
question
            William Ouchi's approach that managers in Japanese companies have a better relationship with their subordinates falls under:
answer
        Theory Z
question
            If the customer's SOW contains words such as nearly or approximately, then:
answer
        The customer uses his discretion in determining the meaning
question
            An employee who would turn down a promotion in order to remain as a project manager would most likely be at which level of Maslow's hierarchy of needs?
answer
        Self-actualization
question
            Which of the following is not a benefit of having a highly detailed work breakdown structure?
answer
        Lower status reporting costs
question
            Generally speaking, the lowest level in the WBS is referred to as:
answer
        The work package
question
            Coercive power most often represents:
answer
        Penalty power
question
            Which of the following types of interpersonal influences comes from the recognition that the project manager is officially empowered to give orders?
answer
        Legitimate power
question
            Which of the following is usually preferred for the placement of the project manager with regard to the WBS? The project manager's salary should be:
answer
        There should be only one WBS element covering the project manager's salary
question
            Which of the following types of interpersonal influences would be representative of workers that are attracted to a particular project?
answer
        Referent power
question
            Plans such as the cost plan, schedule plan and quality plan are referred to as:
answer
        Subsidiary plans
question
            Which one of the following is not one of the three steps of controlling
answer
        Authorizing
question
            The person with the ultimate responsibility to make sure that all work required by the SOW and only the work required by the SOW is performed is the:
answer
        Project manager
question
            The term scope creep is best described as:
answer
        increasing featurism
question
            PMBOK views project integration management as one of the most important because it coordinates the other eight knowledge areas
answer
        true
question
            A contractor accepts a project, after go-ahead, and the contractor discovers that the statement of work was ill-defined and pushed through scope changes that significantly alienate the customer. The customer pays for the scope changes and then files a lawsuit against the contractor to recover the cost of the scope changes. Neglecting the type of contract, the court would most likely rule that:
answer
        The customer is at fault for providing a statement of work that could be misinterpreted
question
            Continuously agreeing to project changes is an example of:
answer
        scope creep
question
            The scope boundary establishes both what is, and what is not part of the project work to be completed by the project team
answer
        true
question
            Which of the following is the most common type of project authority?
answer
        Project charter
question
            Generally speaking, work packages are assigned to one functional unit
answer
        True
question
            Scope creep is generally the result of:
answer
        poorly defined SOW
question
            Laissez-faire leadership most likely represents:
answer
        delegating
question
            Democratic leadership most likely represents:
answer
        Participating
question
            Scop change control procedres protect the scop boundary from expanding as a result of increasing featurism
answer
        True
question
            A customer is unhappy with the performance thus far on a project. The customer states that, unless scope changes are made at the contractor's expense, the contractor would he removed from the customer's preferred bidders list for future contracts. The contractor should.
answer
        Perform the scope changes at the contractor's expense
question
            According the the PMBOK area of scope management, one of the processes is scope planning which means ensuring that authority and resources are committed to developing a scope management plan.
answer
        False
question
            Project expeditors generally have authority over the functional managers.
answer
        false
question
            _____ organizes resources to perform specialized tasks or activities in order to attain the goals of the organization.
answer
        The Functional Organization
question
            Matrix structures allow for workers to be shared on multiple projects and at a lower than usual cost.
answer
        true
question
            Most people seem to believe that the most common driving force for maturity in project management is:
answer
        survival
question
            changes in scope boundary are handled through a
answer
        change control
question
            Higher potential for conflict and poor response time are disadvantages of:
answer
        The Matrix Organization
question
            Which organizational structure generally retains team members long after they are needed?
answer
        Projectized
question
            Which of the following is generally not one of the five processes integrated into an enterprise project management methodology?
answer
        manpower staffing
question
            Which of the following is not part of the project sponsor's role?
answer
        selection of project team members
question
            Which of the following three types of deliverables discussed in the book would be used to classify the final report that must be presented to the customer at the end of the project?
answer
        Software Deliverables
question
            Which of the following organizational forms provides the least career path opportunities for project personnel?
answer
        Projectized
question
            Industries that have _____ tasks and operate in a _____ environment demonstrated the greatest need for project management.
answer
        Complex; Dynamic
question
            The more traditional organizational form best describes:
answer
        The functional organization
question
            The major difference between projects and programs is usually:
answer
        time
question
            _____ supports projects as the dominant form of business with each treated as a separate and independent unit within the organization.
answer
        The project-based organization
question
            Which category of projects would involve a large number of functional units where the workers may be assigned either part-time or full-time?
answer
        matrixed
question
            Which structure will tend to work well when an organization cannot dedicate scarce resources to a project?
answer
        The Matrix Organization
question
            Continuously agreeing to project changes is an example of:
answer
        scope creep
question
            According to Grinnell and Apple, organizational restructuring is needed because management is unhappy with technical skills though projects are being completed within time and cost.
answer
        false
question
            Typical cost overruns on Government contracts in the early years of project management reached:
answer
        300%
question
            Which of the following is a potential benefit of using project management?
answer
        identification of time limits for scheduling
question
            With a line-staff organizational structure, department managers will readily accept instructions from the project manager.
answer
        false
question
            Which of the following is reflective of the changes in project management according to Dr. Thamhain?
answer
        Moving toward full utilization of information technology
question
            High potential for conflict and poor response time are disadvantages of the Matrix Organizational structure.
answer
        true
question
            All of the stakeholders involved in a project either directly or indirectly may have a different definition of project success.
answer
        true
question
            In which of the following schedule compression techniques is the cost of rework usually the greatest?
answer
        performing series of work in parallel
question
            If the optimistic time for an activity is 6 weeks, the pessimistic time is 24 weeks and the most likely time is 12 weeks, then the expected duration is:
answer
        13 weeks
question
            Completing activities in parallel is called_____
answer
        fast tracking
question
            Which of the following is an activity-on-node network diagramming method?
answer
        PDM
question
            Start-to-Start and Finish-to-Finish relationships allow activities to be worked on in parallel.
answer
        true
question
            The major disadvantage of using a bar chart on large projects is that bar charts:
answer
        do not show dependencies between activities
question
            Research suggests that projects that use a formal estimating tool have a better chance of delivering a system that is on time and within budget.
answer
        true
question
            Predecessor activities are activities that must be completed before another activity can be started.
answer
        true
question
            The PMBOK® area called project time management includes all of the following except:
answer
        assign activities
question
            The Critical Path is:
answer
        the longest path in the project network.
question
            Sunk costs include such things as rent, utilities, insurance, and other administrative costs.
answer
        true
question
            The critical path is the shortest path in the project network and also is the longest time in which the project can be completed.
answer
        false
question
            Which of the following schedule compression techniques usually requires adding more resources to each work package that is being compressed?
answer
        crashing
question
            _____ is the most common, real-world method of estimating projects.
answer
        bottom-up estimating
question
            Which of the following is normally not one of the three critical parameters provided in information reporting to the customer?
answer
        risks
question
            The critical path is the longest path in the project network and also is the shortest time in which the project can be completed.
answer
        true
question
            Which of the following statements about the work breakdown structure (WBS) is not true?
answer
        The WBS should be developed by the project manager.
question
            An estimation technique characterized by schedule and cost estimates of how long something should take or should cost.
answer
        D.  Top-Down Estimating
question
            The work breakdown structure (WBS) decomposes, or subdivides, the project into smaller components and more manageable units of work called work packages.
answer
        true
question
            Activities with zero time durations are called:
answer
        dummy activities
question
            With departmental project management, the person assigned to head up the project is called a:
answer
        project leader
question
            For informal project management to be effective, which of the following must exist among the project team?
answer
        A. Effective communications B. Cooperation C. Trust *D. All of the above
question
            The primary difference between formal versus informal execution of a project is the:
answer
        amount of paperwork
question
            Which structure will tend to work well when an organization cannot dedicate scarce resources to a project?
answer
        The Matrix Organization
question
            Which of the following is not an organizational stakeholder?
answer
        customers
question
            In which life cycle phase do project sponsors become most actively involved in the project?
answer
        Initiation
question
            A single organizational structure is best for all organizations regardless of strategy.
answer
        false
question
            The Project Organizational structure supports clear authority and responsibility, improved communication, and high levels of integration.
answer
        true
question
            Uncontrolled obstacles can result in:
answer
        an inability to cope with changes in technology
question
            Which of the following is not one of the three critical terms to consider when looking at organizational workflow?
answer
        span of control
question
            The structure that reveals most clearly how individuals in an organization relate is the:
answer
        The Informal Organization
question
            In which organizational form is it highly unlikely that project management would be a career path?
answer
        Traditional
question
            Which category of projects would be most suited for a small project that stays in one functional unit and is headed up by the functional manager?
answer
        Individual
question
            What type of project manager would have employees (i.e. team members) that report directly to the project manager full-time for the duration of the project?
answer
        Tiger team leader
question
            In which life cycle phase do project sponsors become most actively involved in the project?
answer
        initiation
question
            Which category of projects would involve a large number of functional units where the workers may be assigned either part-time or full-time?
answer
        Matrixed
question
            Which of the following techniques led to the acceptance of project management principles?
answer
        over the fence management
question
            Project isolation, duplication of effort, and projectitis are disadvantages of:
answer
        the project-based organization
question
            In which organizational form are the formal and informal organizations well established?
answer
        traditional
question
            Which structure will tend to work well when an organization cannot dedicate scarce resources to a project?
answer
        The Matrix Organization
question
            Which of the following functions of classical management is generally not performed by the project manager?
answer
        staffing
question
            Breadth, depth of knowledge, and experience are advantages for projects sponsored by organizations with functional structures.
answer
        true
question
            Which of the following is not a capital market stakeholder?
answer
        unions
question
            Accountability can be defined as:
answer
        Authority plus responsibility
question
            Which of the following is the role of the PM rather than the role of the functional manager?
answer
        what work will be done
question
            Project management restructuring allowed companies to manage projects that _____.
answer
        cannot be handled by the traditional organization
question
            The PM's role with regard to interface management does not include interfacing:
answer
        Between senior management and various external stakeholders
question
            High level of integration, improved communication, increased project focus, higher potential for conflict, and poorer response time are advantages and disadvantages of:
answer
        the matrix organization
question
            Successful project management does not require that people understand how to report to multiple bosses.
answer
        false
question
            The Project Organizational structure supports clear authority and responsibility, improved communication, and high levels of integration.
answer
        true
question
            _____ integrates areas and resources throughout the organization.
answer
        The matrix organization
question
            With the project expeditor organizational structure, the expeditor is usually brought on board:
answer
        when a problem arises
question
            Which of the following most likely represents a project champion rather than a project manager?
answer
        Seeks perfection
question
            Projectitis sometimes occurs when the project manager and project team develop a strong attachment to the project and to each other.
answer
        true
question
            Which of the following three types of deliverables discussed in the book would be used to classify the final report that must be presented to the customer at the end of the project?
answer
        Software deliverables
question
            The project manager's role as an integrator of activities does not include integration of activities necessary to:
answer
        All of the following are PM roles:  A. Develop the plan B. Execute the plan C. Make changes to the plan D. All the above are PM roles
question
            Which of the following is not a product/market stakeholder?
answer
        creditors
question
            According to the text, which of the following is not a life cycle phase for project management maturity?
answer
        time
question
            Effective project management pushes decision making:
answer
        down in the organization
question
            Which category of projects would be most suited for a small project that stays in one functional unit and is headed up by the functional manager?
answer
        individual
question
            Which of the following is not a present view of project management?
answer
        Providing good products rather than business solutions
question
            Historically, which functional organization provided the greatest resistance to project management implementation?
answer
        sales
question
            The most difficult decision for a sponsor at the gate review meeting is to:
answer
        cancel the project
question
            According to the text, which of the following is not a life cycle phase for project management maturity?
answer
        planning phase
question
            Money already spent on a project is called
answer
        sunk costs
question
            Project phases are also known as
answer
        stage gates
question
            A stage gate allows a project to
answer
        continue after performance and deliverable review against a set of predefined metrics
question
            If the deliverables of the phase, or stage, met the predefined metrics
answer
        the project is allowed to continue
question
            Project management processes are aggregated into what Process Groups?
answer
        Initiate Plan Execute Monitor and Control Close
question
            Project managers generally spend what percent of their time involved in some type of communications?
answer
        90%
question
            Which of the following is the most common type of project authority?
answer
        project charter
question
            The scope boundary establishes both what is, and what is not part of the project work to be completed by the project team.
answer
        true
question
            Which of the following is usually not validated by using the WBS?
answer
        the quality of the deliverables
question
            If the optimistic time for an activity is 6 weeks, the pessimistic time is 24 weeks and the most likely time is 12 weeks, then the expected duration is:
answer
        13 weeks
question
            If the slack in a 12 week activity is 6 weeks and ES = 4, then LF = _____.
answer
        22
question
            Waiting for people, incomplete work and numerous telephone calls are referred to as:
answer
        time robbers
question
            Which of the following is normally not one of the three critical parameters provided in information reporting to the customer?
answer
        risks
question
            Which of the following cannot be determined after performing a forward pass and a backward pass on a network diagram?
answer
        the effort in each activity
question
            Which of the following schedule compression techniques is often the lowest risk and with the added benefit of lowering the cost?
answer
        Descoping
question
            Project managers that refuse to delegate and have limited faith in the ability of the team create time management problems for:
answer
        themselves
question
            Which of the following scheduling techniques is most appropriate today for reporting project status to a customer during an interchange meeting?
answer
        BAR charts
question
            Which of the following network diagramming methods allows for branching and looping?
answer
        GERT
question
            During competitive bidding, a contractor can submit inclusions and exclusions to the customer's preliminary statement of work.
answer
        true
question
            Which of the following is often overlooked when planning and budgeting a project?
answer
        cost and size of contractual documentation
question
            Which of the following people has the greatest influence on how much authority a project manager will possess on a given project?
answer
        project sponsor
question
            If the project manager's authority is not documented, then the project manager is expected to assume whatever authority he / she needs to get the job done.
answer
        true
question
            What is the project sponsor's responsibility with regard to the WBS preparation?
answer
        The sponsor should not be involved in WBS development.
question
            Which of the following processes of Scope Management Process centers on defining and documenting the stakeholders' needs to properly manage expectations?
answer
        collect requirements
question
            Which of the following is not a benefit of having a highly detailed work breakdown structure?
answer
        lower status reporting costs
question
            According to Douglas McGregor, team members that require supervision, direction and threat of punishment for non-compliance are called _____ employees.
answer
        Theory X
question
            Changes in the scope boundary are handled through a _____.
answer
        change control
question
            Project sponsors within the contractor's company have the authority to change the scope of an external customer's project as they see fit.
answer
        false
question
            A project manager desires a work breakdown structure that goes through 6 levels of detail. Level 3 through level 6 would most likely be prepared by:
answer
        subject matter experts
question
            All work packages in a project must be at the same level of the WBS
answer
        false
question
            Project managers often rewrite the customer's SOW into a document that the project team can easily understand. The document is called:
answer
        the scope statement
question
            Project integration concerns making choices about where resources and effort should be concentrated, as well as anticipating and dealing with issues that often involves making trade offs between objectives and alternatives.
answer
        true
question
            If six people are in a room participating in a conversation, then there are _____ two-way channels of communications.
answer
        15
question
            Most project managers communicate _____ and most line managers communicate _____.
answer
        laterally and vertically downward
question
            Which of Maslow's levels would be a motivational force for newly hired employees?
answer
        physiological
question
            Which of the following type of authority would come from the project manager's job description?
answer
        De jure
question
            During the execution of a project, the customer asks you to perform additional tests which the customer will pay for. Unfortunately, there are no resources available to perform the additional tests. The project manager should:
answer
        Let the sponsor make the decision on what to do.
question
            A project manager that communicates honestly, fairly and by the book is called a ____communicator
answer
        ethical
question
            Which of the following is normally not addressed in a change control board meeting to approve a scope change
answer
        which functional unit will perform the change
question
            The document that is prepared at the beginning of a project in order to clarify the roles and responsibilities of the team members is called a:
answer
        Responsibility assignment matrix
question
            During an interface meeting with your customer, both of you have different interpretations of the raw data. If the customer's interpretation is correct, then the direction of ,the project should change. However, the customer states that they need more time to determine if their interpretation is correct. As the PM, you should:
answer
        Continue on with your existing baseline until the customer confirms that the direction must change.
question
            What is the project sponsor's responsibility with regard to the WBS preparation?
answer
        The sponsor should not be involved in the WBS development
question
            sunk costs include things as rent, utilities, insurance, and other administrative costs
answer
        false
question
            the alternative to sigma is
answer
        all are possible
question
            the best source of revenue for a customer-requested scope change is:
answer
        a customer-funded contract amendment
question
            with type of project report would we most likely find EAC and ETC
answer
        forecast
question
            a common cause for a favorable SV but unfavorable CV might be:
answer
        using overtime
question
            rent, utilities, insurance and administrative costs are examples of:
answer
        indirect costs
question
            identifying the critical path is important because a project can only have on critical path and it never changes
answer
        false
question
            earned value measurement systems must be capable of
answer
        all of the above
question
            which of the following quality gurus focused on the four absolutes of quality
answer
        crosby
question
            the best method to price out a work package is to use the:
answer
        actual salary of the workers assuming they are known
question
            which of the following is not one of the four categories of the cost of quality
answer
        identification
question
            the PMBOK area called project cost management includes estimate costs, determine budget, and control costs
answer
        true
question
            a document that states the principles of quality would be a quality
answer
        policy
question
            adding resources to an activity to shorten the critical path is called
answer
        crashing
question
            identifying the critical path is important because any change in the duration of the activities or tasks on the critical path will affect the project's schedule
answer
        true
question
            the critical path has zero slack or float
answer
        true
question
            which of the following is an estimating pitfall
answer
        all of the above
question
            the fact that random variation is always present in any process is called
answer
        common cause variability
question
            the weakness in all earned value measurement is the way we calculate
answer
        EV
question
            variance envelopes are usually established because:
answer
        not all cost variances must be explained even though they exist
question
            which category of projects would involve a large number of functional units where the workers may be assigned either part-time or full-time
answer
        Special
question
            Which of the following scheduling techniques is most appropriate today for managing a project?
answer
        precedence charts
question
            Which of the following is an activity-on-node network diagramming method?
answer
        PDM
question
            Which of the following cannot be determined after performing a forward pass and a backward pass on a network diagram?
answer
        the effort in each activity
question
            Negative slack is the result of:
answer
        The forward pass going beyond the customer's end date and the backward pass is measured from the customer's end date
question
            Which of the following is false concerning the critical path in a network?
answer
        it is the path that contains the greatest number of activities
question
            Smoothing out project resources from period to period is called
answer
        resource leveling
question
            Laying out a network diagram when you know beforehand the size of the available resource
answer
        Resource allocation or resource limited planning
question
            PERT network reflect what type of precedence diagram?
answer
        Finish-to-start
question
            What are the maximum number of inputs and outputs that can exist in a node in the precedence diagramming method?
answer
        it is unlimited
question
            cost performance index (CPI)
answer
        CPI Measures the value of the work completed at the measurement date against actual cost. This is the most critical of all EVM measurements. The formula is CPI = EV / AC.
question
            cost variance (CV)
answer
        cost variance (CV) The difference between a task's value at the measurement date and its actual cost. The formula is CV = EV - AC.
question
            earned value (EV)
answer
        earned value (EV) The value of the work completed to date as it compares to the budgeted amount for the work component.
question
            earned value measurement (EVM)
answer
        EVM is a tool and technique of the Cost Control process that compares what you're received or produced as of the measurement date to what you've spent. The three measurements needed to perform earned value measurement are planned value (PV), actual cost (AC), and earned value (EV).
question
            Estimate at Completion (EAC)
answer
        estimate at completion (EAC) A forecast of the total cost of the project based on both current project performance and the remaining work. The formula is EAC = AC + ETC.
question
            cost control
answer
        A process that measures the project spending to date, determines whether changes have occurred to the cost baseline, and takes action to deal with the changes. This process monitors the budget and manages changes to the cost baseline.
question
            common causes of variance
answer
        Variances that come about as a result of circumstances that are common to the process you're performing and are easily controlled at the operational level. The three types of common cause variances are random, known or predictable, and variances that are always present in the process.
question
            budget at completion (BAC)
answer
        budget at completion (BAC) The total amount of the project budget for a work package, control account, or schedule activity, or for the project.
question
            actual cost (AC)
answer
        actual cost (AC) The cost to complete a component of work in a given time period. Actual costs include direct and indirect costs.
question
            acceptance
answer
        The decision to tolerate the defects that are found as a result of the quality testing. This is also a tool for risk response planning.
question
            cause-and-effect diagram
answer
        A Quality Control technique that shows the relationship between the effects of problems and their causes. This is also known as an Ishikawa diagram and a fishbone diagram.
question
            TCPI to complete performance index
answer
        to-complete performance index (TCPI) The projected performance level that must be achieved in the remaining work of the project in order to satisfy financial or schedule goals. The formula is TCPI = (BAC − EV) / (BAC − AC).
question
            When team members take direction from both the project and line managers, the type of project manager is usually
answer
        a heavyweight team leader
question
            On a project headed up by a lightweight project manager, employees have their performance reviews made by:
answer
        line managers only
question
            Which of the following is normally not part of a team member's role?
answer
        sharing information with the sponsor
question
            During the 1970s and 1980s, formal project management practices were put in place because the constraints were _____ and _____ boundaries had to be crossed
answer
        tight and several
question
            Which of the following is not necessarily an obstacle to effective project management?
answer
        changes in project sponsorship
question
            If a company advertises on television that they consider themselves as a solution provider to satisfy your business needs, then their driving force was most likely:
answer
        customer expectations
question
            Companies can become reasonably mature in project management by designing the right support systems. In general, how much time usually elapses after maturity before a company becomes excellent in project management execution?
answer
        5 years
question
            which of the following is not a major benefit of using life cycle phases?
answer
        easier task of selecting the project manager
question
            In which of the following structures is budgeting and cost control easier to perform?
answer
        classical
question
            In which organizational form is there no customer focal point?
answer
        traditional
question
            Which of the following is not one of the integration mechanisms considered when creating work integration positions?
answer
        project managers rank and pay grade
question
            In which organizational form is response to the customer's needs the slowest?
answer
        traditional
question
            With departmental project management, the person assigned to head up the project is called a:
answer
        project leader
question
            In departmental project management, the person that ultimately ends up managing the project, assuming several departments are involved, is the:
answer
        division manager
question
            In a line-staff organizational structure, the person heading up the project is called the:
answer
        project division leader
question
            Other than the traditional structure, which organizational form has strong communication channels?
answer
        projectized
question
            In which organizational form do we usually have the best balance among the time, cost and performance constraints on a project?
answer
        matrix
question
            In a strong matrix structure, employees take daily direction from:
answer
        both, but the project manager has greater influence
question
            According to the text, the "next generation" project manager must exhibit skills in all of the following except:
answer
        wage and administrative skills
question
            Which of the following is usually not a major concern for the PM during the organizational staffing process?
answer
        union vs nonunion personnel
question
            Probably the greatest risk to a project manager on a long-term project is to receive the best employees and then:
answer
        losing them to another project at an inopportune time
question
            In a weak matrix structure, teamwork is not vital for project success because the team members are under the control of their functional manager.
answer
        false
question
            Which people generally receive no visibility or credit for a job well done.
answer
        functional managers
question
            Strange as it may seem, project managers should encourage conflicts to take place during recruitment and staffing.
answer
        true
question
            Which of the following is not usually an option for a PM dealing with an incompetent worker?
answer
        removal from the company
question
            During the past few years, which project management skill seems to have outpaced all other skills?
answer
        business conceptual skills
question
            Professionally-trained people with advanced degrees often prefer:
answer
        to work with groups of people dedicated to their profession
question
            Project team members often feel threatened by the possibility of the cancellation of the project. In which organizational form is this threat the greatest?
answer
        projectized
question
            Some companies assign employees to a project management position as a lateral transfer move without a salary increase because:
answer
        the employee must demonstrate performance first
question
            the person most qualified to assess the overall risk in a work package activity in a project is the:
answer
        team member/line manager
question
            Who determines grade level of the employee needed to accomplish a task?
answer
        functional manager
question
            You have just been awarded a contract in which you told the customer that a certain employee would be assigned full time on the project. Once the project begins, you discover that the employee is splitting his time between two projects per the instructions of his functional manager. You should
answer
        Determine the impact on the project and discuss it with the functional manager
question
            After contract award, a customer requests that some of the senior workers in the functional areas be assigned to the project team. You priced out the project assuming the average worker would be assigned and furthermore assumed that the average worker could do the job effectively. You should discuss this first with:
answer
        project sponsor
question
            Which of the following standard project estimating techniques is usually accomplished in weeks?
answer
        analogy
question
            Pricing out the construction cost of a home by a cost per square foot would be representative of a _____ estimate.
answer
        parametric
question
            When a functional manager tells you that your project is 10% more difficult than the standard project, the functional manager is providing you with a _____ estimate.
answer
        analogy
question
            Which of the following projects would most likely have reasonably good estimating techniques?
answer
        contruction
question
            Material provided in a proposal to justify one's estimates are called:
answer
        back up data
question
            An employee earning $40/hour works in a department where the overhead is 125%. A billable or charge back hour to this department would be:
answer
        $90
question
            Which of the following components of life cycle costing incurs the largest cost?
answer
        operational and support
question
            Which of the following is generally not part of capital budgeting?
answer
        life cycle cost estimating
question
            Which of the following would be the first item to be discussed in the initial kickoff meeting for a project?
answer
        understanding of the requirements
question
            A customer external to your company requests that a certain element of work be subdivided to lower level work packages and that cost/schedule information be reported at the lower levels. You should:
answer
        Check with the line managers first to see if cost and schedule can be reported at this level.
question
            Consider the WBS shown below:  1.00.00   1.1.0   1.1.1   1.1.2   1.2.0   1.2.1   1.2.2 If the total program costs $100,000 and 1.2.1 and 1.2.2 are each $20 K, then the cost of 1.1.0 is:
answer
        $60 K
question
            If the schedule variance is positive and the cost variance is negative, the project's status is:
answer
        under budget ahead of schedule
question
            The EVMS term that represents the value of work actually accomplished is:
answer
        EV
question
            Which of the following terms is used to determine the trend on cost?
answer
        CPI
question
            If PV = $100, EV = $200 and AC = $300, the status is:
answer
        over budget ahead of schedule
question
            If SPI = 1.05 and CPI = 0.96, the project's trend is:
answer
        over budget ahead of schedule
question
            The difference between the cost baseline and the contracted cost is the:
answer
        management reserve
question
            The form that is used to establish charge numbers is the:
answer
        work authorization form
question
            The best source of revenue for a customer-requested scope change is:
answer
        a customer-funded contract amendment
question
            The best method to price out a work package is to use the:
answer
        actual salary of workers assuming they are known
question
            Which of the following escalation factors are usually paid for with funds from the management reserve?
answer
        A. Salaries  B. Overhead rates  C. Material costs
question
            Dr. Juran's cost of quality model suggests that complete elimination of all defects may not be cost-effective.
answer
        True
question
            The collective term for the formal quality activities and processes is called:
answer
        qauilty assurance
question
            The person or group with greatest ability to influence cost at project initiation is:
answer
        the customer/owner
question
            Which quality guru was heavily involved with quality control charts?
answer
        Deming
question
            Consider the following: BAC = $1000, VAC = , and AC = $400. Therefore EV = _____.
answer
        $480
question
            Once the project schedule and budget are accepted by the client or sponsor, the project plan becomes the baseline plan that will be used as a benchmark to track the project's actual progress.
answer
        True
question
            If the upper and lower control limits of a process are set at plus or minus three sigma, then what percent of the units produced are expected to satisfy the customer's requirements?
answer
        99.73%
question
            The EVMS term that represents the value of work actually accomplished is:
answer
        EV
question
            The project budget is determined by the project schedule, the cost of the resources assigned to each of the tasks, and by any other direct or indirect costs and reserves.
answer
        True
question
            The cost of labor for using a resource are _____
answer
        Direct Costs
question
            A common cause for a favorable CV but unfavorable SV might be:
answer
        Too few workers on the project
question
            The establishment of all of the charge numbers for a project is called the:
answer
        Code of accounts
question
            The final step in determining the cost of an activity is:
answer
        ensuring resources are leveled
question
            Which of the following is not generally a special cause variability?
answer
        A point outside of the control limit
question
            The idea that there is a cost associated with using a resource is _____
answer
        Prorated costs
question
            The cause and effect chart is used to _____.
answer
        Determine its cause
question
            Crosby believed that the cost of quality was the cost of conformance to quality.
answer
        False
question
            The balance between quality and cost is called:
answer
        Salability
question
            Which of the following is not one of the four categories of the cost of quality?
answer
        Identification
question
            _____ is well suited for developing simulations where the project manager can conduct sensitivity analysis for schedule planning and risk analysis.
answer
        PERT
question
            The EVMS term that represents the value of work actually accomplished is:
answer
        EV
question
            If PV > AC, then we are spending less than the plan called for but we do not know if that's good or bad without having a value for EV.
answer
        True
question
            The alternative to three sigma is:
answer
        6 Sigma
question
            Quality is defined by the:
answer
        Customer
question
            Which of the following quality gurus developed an approach for determining the cost of quality?
answer
        Juran
question
            The fact that random variation is always present in any process is called:
answer
        Common cause variability
question
            Rolling wave planning is:
answer
        preparing a summary plan and developing incremental detailed schedules
question
            Consider the following: BAC = $1000, VAC = , and AC = $400. Therefore, SV = _____
answer
        Cannot be determined
question
            The weakness in all of earned value measurement is the way we calculate:
answer
        EV
question
            At project initiation:
answer
        Many cost reduction opportunities exist and the cost of each change is low
question
            __ is well suited for developing simulations where the project manager can conduct sensitivity analysis for schedule planning and risk analysis
answer
        PERT
question
            The plan-do-check-act cycle is attributed to:
answer
        Deming
question
            An S-Curve plots:
answer
        Cumulative cost as a function of time
question
            Design of experiments is attributed to:
answer
        Taguchi
question
            Scheduling other projects so that resources may be shared is_____
answer
        Critical Chain Project Management
question
            Which of the following is generally not part of capital budgeting?
answer
        Life Cycle cost estimating
question
            A common cause for a favorable SV but unfavorable CV might be:
answer
        using overtime
question
            he collective term for the activities and techniques within the overall process is called:
answer
        quality control
question
            Confidence in project estimates will be highest _____
answer
        later in the project
question
            Two common time management forms, as described in the book are called:
answer
        to-do-pad and daily calendar log
question
            The technique used to find the sequence of tasks with zero slack (or float) is most closely associated with:
answer
        critical path analysis
question
            Based upon the following diagram and activity durations, the Critical Path is:
answer
        A+B+C+F+H+J
question
            An estimation technique characterized by the dividing the project into smaller modules and then directly estimating the time and effort in terms of person-hours, person-weeks, or person-months for each module best describes
answer
        bottom-up estimating
question
            A start-to-finish activity is the most common relationship between two activities.
answer
        false
question
            Which type of chart provides the least "predictive" value?
answer
        Bar charts
question
            Which of the following activity-on-arrow network diagramming methods does not require three estimates for durations?
answer
        ADM
question
            An estimation technique characterized by the allocation of a timeframe for a specified activity. e.g. a team has two weeks to complete a task and at the end of two weeks work on that task ceases.
answer
        time boxing
question
            The critical path is the path in the network with the greatest amount of risk.
answer
        false
question
            Project success will be determined in large part by __
answer
        thinking carefully through activities and estimating their durations.
question
            Which of the following is not one of the four network diagramming techniques?
answer
        VERT
question
            A charting technique designed to illustrate the inductive and deductive reasoning necessary to achieve some objective is called a _____ Diagram / network
answer
        logic
question
            An activity in a network has the following characteristics: ES = 10, EF = 18 and LS = 12. The duration of the activity is:
answer
        8
question
            _____ can help manage the Critical Path by providing information about which activities can be delayed without affecting the deadline target date.
answer
        project network diagrams
question
            Each phase of the project should provide at least one specific deliverable.
answer
        true
question
            Which of the following network diagramming methods do not use dummy activities?
answer
        PDM
question
            One way to ensure that the WBS has the appropriate level of detail is to ensure that the people who do the work are involved in its development.
answer
        true
question
            The critical path is the path in the network with the greatest amount of risk.
answer
        false
question
            Which of the following is false concerning the critical path in a network?
answer
        It is the path that contains the greatest number of activities
question
            Which of the following scheduling techniques is most appropriate today for reporting project status to a customer during an interchange meeting?
answer
        BAR charts
question
            The measurement of lag is made within an activity whereas slack is measured between activities.
answer
        false
question
            Laying out a network diagram when you know before-hand the size of the available resource pool is called:
answer
        Resource allocation or resource limited planning
question
            What are the maximum number of inputs and outputs that can exist in a node in the precedence diagramming method?
answer
        it is unlimited
question
            Installing a server before loading the operating system is an example of a finish-to-start relationship.
answer
        true
question
            Which of the following type of interpersonal influence has as its source the individual rather than the company?
answer
        referent power
question
            According to the PMBOK® area of scope management, one of the processes is scope planning which means ensuring that authority and resources are committed to developing a scope management plan.
answer
        false
question
            Which of the following quality gurus focused on the four absolutes of quality?
answer
        Crosby
question
            A Pareto Diagram is used to identify and prioritize quality problems.
answer
        true
question
            In which project life cycle phase does quality begin?
answer
        Initiation/Planning
question
            The critical path is the path in the network with the greatest amount of risk.
answer
        false