            activity attributes
answer
        Information that provides schedule-related information about each activity, such as predecessors. successors, logical relationships. leads and lags, resource requirements, constraints, imposed dates, and assumptions related to the activity.
question
            activity list
answer
        A tabulation of activities to be included on a project schedule.
question
            activity-on-arrow (AOA)
answer
        A network diagramming technique in which activities are represented by arrows and connected at points called nodes to illustrate the sequence of activities.
question
            arrow diagramming method (ADM)
answer
        A network diagramming technique in which activities are represented by arrows and connected at points called nodes to illustrate the sequence of activities.
question
            analogous estimates / top-down estimates
answer
        The estimates that use the actual cost of a previous, similar project as the basis for estimating the cost of the current project.
question
            baseline
answer
        A starting point, a measurement, or and observation that is documented so that it can be used for future comparison; also defined as the original project plans plus approved changes.
question
            bottom-up estimates
answer
        Cost estimates created by estimating individual activities and summing them to get a project total.
question
            buffer
answer
        Additional time to complete a task, added to an estimate to account for various factors.
question
            burst
answer
        An occurrence when two or more activities follow a single node on a network diagram.
question
            cost baseline
answer
        A time-phased budget that project managers use to measure and monitor cost performance.
question
            crashing
answer
        A technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost.
question
            critical chain scheduling
answer
        A method of scheduling that takes limited resources into account when creating a project schedule and includes buffers to protect the project completion date.
question
            critical path method (CPM) / analysis
answer
        A networking diagramming techniques used to predict total project duration.
question
            dependency / relationship
answer
        The sequence of project activities or tasks.
question
            discretionary dependencies
answer
        The dependencies that are defined by the project team.
question
            duration
answer
        The actual amount of time spent working on an activity plus elapsed time.
question
            effort
answer
        The number of workdays or work hours required to complete a task.
question
            external dependencies
answer
        The dependencies that involve relationships between project and non-project activities.
question
            fast tracking
answer
        A scheduling compression technique where you do activities in parallel that you would normally do in sequence.
question
            feeding buffers
answer
        Additional time added before tasks on the critical path that are preceded by non-critical path tasks.
question
            Gantt charts
answer
        A standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format.
question
            mandatory dependencies
answer
        The dependencies that are inherent in the nature of the work being performed on a project.
question
            merge
answer
        A situation when two or more nodes precede a single node on a network diagram.
question
            milestone
answer
        A significant event on a project.
question
            multitasking
answer
        When a resource works on more than one tasks at a time.
question
            Murphy's Law
answer
        If something can go wrong, it will.
question
            network diagram
answer
        A schematic display of the logical relationships among or sequencing of project activities.
question
            node
answer
        The starting and ending of an activity-on-arrow network diagram.
question
            parametric modeling
answer
        A technique that uses project characteristics (parameters) in a mathematical model to estimate project cost.
question
            Parkinson's Law
answer
        Work expands to fill time allowed.
question
            precedence diagramming method (PDM)
answer
        A network diagramming technique in which boxes represent activities.
question
            Program Evaluation and Review Technique (PERT)
answer
        A network analysis technique used to estimate project duration when there is a high degree of uncertainty about the individual activity duration estimates
question
            project buffer
answer
        The additional time added before a project's due date to account for unexpected factors.
question
            project management plan
answer
        A document which is a deliverable for the project integration management knowledge area, used to coordinate all project planning documents and to help guide a project's execution and control.
question
            scope baseline
answer
        The approved project scope statement and its associated WBS and WBA dictionary
question
            scope management plan
answer
        A document that includes descriptions of how the team will prepare the project scope statement , create the WBS, verify completion if the project deliverables, and control requests for changes to the project scope.
question
            slack / float
answer
        The amount of time an activity may be delayed without delaying a succeeding activity or the project finish date.
question
            team contract
answer
        A document created to help promote team work and clarify team communications.
question
            Theory of Constraints (TOC)
answer
        A management philosophy that states that any complex system at any point in time often has only one aspect or constraint that is limiting its ability to achieve more of its goal.
question
            three-point estimate
answer
        An estimate that includes an optimistic, most likely and pessimistic estimate.
question
            work breakdown structure (WBS)
answer
        A deliverable-oriented grouping of the work involved in a project that defines the total scope of the project.
question
            work breakdown structure (WBS) dictionary
answer
        A document that describes detailed information about WBS tasks.
question
            work package
answer
        A task at the lowest level of the WBS.
question
            requirement
answer
        a condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document
question
            requirements management plan
answer
        a plan that describes how project requirements will be analyzed, documented, and managed.
question
            requirements tractability matrix (RTM)
answer
        A table that lists requirements, various attributes of each requirement, and the status of the requirements to ensure that all of them are addressed.
question
            Scope Creep
answer
        The tendency for project scope to continually increase
question
            Critical path
answer
        The series of activities that determine the earliest by which the project can be completed; it is the longest path through the network diagram and has the least amount of slack or float
question
            Organizational process assets
answer
        Policies and procedures related to project management, past project files, and lessons-learned reports from previous, similar projects
question
            Execution
answer
        The main purpose of project planning is to guide ______.
question
            "you plan to fail?"
answer
        End of the saying, "If you fail to plan..."
question
            all of them
answer
        Number of knowledge areas that include planning processes
question
            planning
answer
        Often the most difficult and unappreciated process in project management
question
            gets managed
answer
        End of the saying, "What gets measured..."
question
            project management plan
answer
        Plan that coordinates all other project plans
question
            team contract
answer
        Document created to help promote teamwork and clarify team communications (a ________ contract)
question
            baseline
answer
        A starting point or measurement that can be used for future comparison
question
            dynamic or flexible
answer
        As opposed to static, project management plans should be this
question
            variable
answer
        The length of a project management plan is ______.
question
            meeting
answer
        The ______ guidelines section of a team contract describes items like arranging telephone or video-conferencing, developing and following agendas, etc.
question
            subsidiary plans
answer
        Other plans that the project management plan refers to, such as the scope management plan, risk management plan, etc. are called ________ plans
question
            work package
answer
        Lowest level of the WBS
question
            work breakdown structure
answer
        Meaning of the acronym WBS
question
            scope
answer
        The _____ management plan involves defining and controlling what work is or is not included in the project
question
            statement
answer
        The project scope ______ defines the scope of a project
question
            mind mapping
answer
        approach for creating a WBS that that uses branches radiating out from a core idea to structure thoughts and ideas
question
            activities
answer
        Process in project time management that seems more like a scope task - defining ________
question
            milestone
answer
        A significant event on a project
question
            SMART
answer
        Acronym for creating milestones that are specific, measureable, assignable, realistic, and time-framed
question
            critical
answer
        Shows the shortest time in which a project can be completed; also the longest path through a network diagram - the ______ path
question
            chain
answer
        A method of scheduling that considers limited resources when creating a project schedule - critical ____ scheduling
question
            parametric
answer
        Type of estimate that uses project characteristics in a mathematical model, such as number of square feet of a house
question
            cost budgeting
answer
        Allocating the overall cost estimate to individual tasks over time
question
            bottom-up estimate
answer
        Type of estimate that can be very accurate but also very expensive to create
question
            analogous or top-down
answer
        Type of estimate that uses the actual costs of a similar project as its basis
question
            baseline
answer
        A time-phased budget that project managers use to measure and monitor cost performance - a cost ______
question
            guide project execution
answer
        The main purpose of project planning is to
question
            85-90%
answer
        EI accounts for ______ of the difference between outstanding leaders and their more average peers.
question
            emotion
answer
        When dealing with people, remember you are not dealing with creatures of logic, but creatures of ______
question
            Self-awareness  Self-management  Social-Awareness  Relationship Management
answer
        Four Dimensions to Emotional Intelligence
question
            Mindfulness
answer
        being aware of our own inner experience (attuned to self), and paying attention to what is happening around us (attuned to others and the world around us).