accounting test 3 – Flashcards

Unlock all answers in this set

Unlock answers
question
Which of the following is not a product cost?
answer
Advertising costs.
question
Using a traditional costing approach which of the following manufacturing costs are assigned to products?
answer
Variable manufacturing overhead, direct materials, direct labor and fixed manufacturing overhead.
question
Which of the following statements is true regarding absorption costing?
answer
It assigns all manufacturing costs to products.
question
Which of the following statements is true regarding variable costing?
answer
Only manufacturing costs that change in total with changes in production level are included
question
Which of the following statements is true?
answer
Variable costing treats fixed overhead as a period cost.
question
Which of the following statements is true?
answer
A per unit cost that is constant at all production levels is a variable cost per unit.
question
Under absorption costing, which of the following statements is not true?
answer
Fixed inventory costs are treated in the same manner as they are under variable costing.
question
When evaluating a special order, management should:
answer
Only accept the order if the incremental revenue exceeds total variable product costs.
question
Which of the following best describes costs assigned to the product under the absorption costing method?
answer
DL, DM, variable manufacturing overhead, and fixed manufacturing overhead.
question
Which of the following best describes costs assigned to the product under the variable costing method?
answer
DL, DM, and variable manufacturing overhead.
question
A cost that remains the same in total even when volume of activity varies is a:
answer
Fixed cost
question
A cost that changes in total proportionately to changes in volume of activity is an:
answer
Variable cost
question
A cost that changes with volume, but not at a constant rate, is called a:
answer
Curvilinear cost
question
A cost that remains constant over a limited range of volume but increases by a lump sums when volume increases beyond a maximum amour is a:
answer
Step-wise cost
question
A cost that can be separated into fixed and variable components is called a:
answer
Mixed cost
question
Curvilinear costs always increase:
answer
When volume increases but not at a constant rate.
question
Which one of the following statements is not true?
answer
Total variable costs decrease as the volume increases
question
An important tool in predicting the volume of activity, the costs to be incurred, the sales to be earned, and the profit to be received is:
answer
Cost-volume-profit analysis.
question
A company's normal operating range, which excludes extremely high and low volumes that are not likely to occur, is called the:
answer
Relevant range.
question
A term describing a firm's normal range of operating activities is:
answer
Relevant range of operations.
question
Cost-volume profit analysis is based on three basic assumptions. Which of the following is not one of these assumptions?
answer
Curvilinear costs change proportionately with changes in volume throughout the relevant rang.
question
A target income refers to:
answer
Income planned for a future period.
question
The margin of safety is the excess of :
answer
Expected sales over break-even sales.
question
The excess of expected sales over the sales level at the break-even point is know as the:
answer
Margin of safety.
question
A formal statement of future plans, usually expressed in monetary terms, is a:
answer
Budget
question
The process of planning future business actions and expressing them as a formal plan is called
answer
Budgeting
question
Effective budgeting requires all of the following except:
answer
Determination of budgets by to levels of management.
question
Which of the following is not a benefit of following a well-designed budgeting process?
answer
Assurance of future profits.
question
Which of the following is not a benefit derived from budgeting?
answer
Budgeting ensures the achievement of all goals.
question
Which of the following statements about budgeting is false?
answer
The master budget should only be prepared by top management.
question
A budget is best described as:
answer
A formal statement of a company's future plans usually expressed in monetary terms.
question
Preparing a master budget is usually the responsibility of:
answer
A budget committee
question
The most useful budget figures are developed:
answer
From the bottom up following a participatory process.
question
The overall coordinating activity of the budget process is the responsibility of the:
answer
Budget committee
question
The set of periodic budgets that are prepared and periodically revised in the practice of continuous budgeting is called:
answer
Rolling budgets
question
The practice of preparing budgets for each of several future periods and revising those budgets as each period is completed, adding a new budget each period so that the budgets always cover the same number of future periods, is called:
answer
Continuous budgeting
question
The usual budget period is:
answer
An annual period separated into quarterly and monthly budgets.
question
Operating budgets include all the following budgets except the:
answer
Cash budget.
question
Which of the following is a financial budget?
answer
Budgeted balance sheet.
question
The master budget includes:
answer
Operating budgets, a capital expenditure budget, and financial budgets.
question
The usual starting point for preparing a master budget is forecasting or estimating:
answer
Sales
question
A comprehensive or overall formal plan for a business that includes specific plans for expected sales, the units of product to be produced, the merchandise or materials to be purchased, the expense to be incurred, the long-term assets to be purchased, and the amours of cash to be borrowed or loans to be repaid, as well as a budgeted income statement and balance sheet, is called a:
answer
Master budget
question
The master budget process usually ends with:
answer
The budgeted balance sheet.
question
Which of the following budgets is not an operating budget?
answer
Cash budget
question
A budget system based on expected activities and their levels that enables management to plan for resources required to perform the activities is:
answer
Activity-based budgeting
question
A plan that lists the types and amounts of general and administrative expenses expected during the budget period is referred to as a:
answer
General and administrative expense budget.
question
A plan that lists dollar amounts to be received from disposing of plant assets and dollar amount to be spent on purchasing additional plant assets is called a:
answer
Capital expenditures budget
question
A plan that reports the units or costs of merchandise to be purchased by a merchandising company during the budget period is called a:
answer
Merchandise purchases budget
question
A plan showing the units of goods to be sold and the revenue to be derived from sales that is the usual starting point in the budgeting process, is called:
answer
Sales budget
question
A plan that lists the types and amounts of selling expenses expected during the budget period is called a(n):
answer
Selling expense budget
question
Which of the following factors is least likely to be considered in preparing a sales budget
answer
The capital expenditures budget.
question
A quantity of merchandise or materials over the minimum needed reduce the risk of running short is called:
answer
Safety stock.
question
When preparing the cash budget all of the following should be considered except:
answer
Depreciation expense.
question
A plan that shows the expected cash inflows and cash outflows during the budget period, including receipts from loans needed to maintain a minimum cash balance and repayments of such loans, is called a(n):
answer
Cash budget
question
Which budget must be completed after a cash budget is prepared?
answer
Budgeted income statement
question
Which of the following would not be used in preparing a cash budget for October?
answer
Estimated depreciation expense for October.
question
A managerial accounting report that presents predicted amours of the company's revenues and expenses for the budget period is called a:
answer
Budgeted income statement.
question
A managerial accounting report that presents predicted amounts of the company's assets, liabilities, and equity as of the end of the budget period is called a(n):
answer
Budgeted balance sheet
question
In preparing a budgeted balance sheet, the amount for Accounts Receivable is primarily determined from:
answer
The sales budget.
question
A Long-term liability data for the budgeted balance sheet is derived from:
answer
The cash budget and capital expenditures budget.
question
In preparing financial budgets:
answer
The budgeted balance sheet is usually prepared last.
question
To determine the production budget for an accounting period, consideration is not given to which of the following:
answer
Budgeted overhead.
question
A plan that shows the predicted costs for direct materials, direct labor, and overhead to be incurred in manufacturing the units in the production budget is called the:
answer
Manufacturing budget.
question
A plan that states the number of units to be manufactured during each future period covered by the budget, based on the budgeted sales for the period and the levels of inventory needed to support future sales, is the:
answer
Productions budget
question
Standard costs are:
answer
Preset costs for delivering a product or service under normal conditions.
question
The costs that should be incurred under normal conditions to produce a specific product or component or to perform a specific service are:
answer
Standard costs
question
Standard costs are used to measure:
answer
Price and quantity variances.
question
The difference between actual and standard cost caused by the difference between the actual price and the standard price is called the:
answer
Price variance.
question
The difference between actual and standard cost caused by the difference between the actual quantity and the standard quantity is called the:
answer
Quantity variance.
question
The difference between the actual cost incurred and the standard cost is called the:
answer
Cost variance.
question
A process of examining the differences between actual and budgeted costs and describing them in terms of the amounts that resulted from price and quantity differences is called:
answer
Cost variance analysis.
question
An analytical technique used by management to focus on the most significant variances and give less attention to the areas where performance is satisfactory is known as:
answer
Management by exception.
question
A planning budget based on a single predicted amount of sales or production volume is called a:
answer
Fixed budget
question
A report based on predicted amounts of revenues and expenses corresponding to the actual level of output is called a:
answer
Flexible budget.
question
An internal report that helps management analyze the difference between actual performance and budgeted performance based on the actual sales volume (or other level of activity) and that presents the differences between actual and budgeted amounts as variances is called a(n):
answer
Flexible budget performance report.
question
Static budget is another name for:
answer
Fixed budget
question
Variable budget is another name for
answer
Flexible Budget
question
An internal report that compares actual cost and sales amours with budgeted amounts and identifies the differences between them as favorable or unfavorable variances is called a:
answer
Performance report.
question
A performance report compares the differences between:
answer
Actual results and predicted results.
question
Sales analysis is useful for:
answer
Planning and control purposes.
question
A flexible budget is prepared:
answer
At any time in the planning period.
question
Which department is often responsible for the direct materials price variance?
answer
The purchasing department.
question
Overhead cost variance is:
answer
The difference between the actual overhead incurred during a period and the standard overhead applied.
question
Which of the following variances is not used in a standard cost system?
answer
Fixed overhead efficiency variance.
question
The sum of the variable overhead spending variance, the variable overhead efficiency variance, and the fixed overhead spending variance is the:
answer
Controllable variance
question
The difference between the total budgeted overhead cost and the overhead applied to production using the predetermined overhead rate is the:
answer
Volume variance
question
Regarding overhead costs, as volume increases:
answer
Unit fixed cost decreases, unit variable cost remains constant.
question
When recording variances in a standard cost system:
answer
All unfavorable material and labor variances are credited.
question
When standard manufacturing costs are recorded in the accounts and the cost variances are immaterial at the end of the accounting period, the cost variances should be:
answer
Closed to cost of goods sold.
question
Which of the following would not be considered a cost center?
answer
Pharmacy in a grocery store.
question
Which of the following is most likely to be considered a profit center?
answer
The grocery department of a Walmart Supercenter or Target Superstore
question
A unit of a business that not only incurs costs but also generates revenues is called a:
answer
Profit center.
question
A profit center:
answer
Incurs costs and directly generates revenues
question
An accounting system that provides information that management can use to evaluate the profitability and/or cost effectiveness of a department's activities is a:
answer
Departmental accounting system.
question
A department that incurs cost without directly generating revenues is a:
answer
Cost center
question
Regardless of the system used in departmental cost analysis:
answer
Indirect costs are allocated, direct costs are not
question
An expense that does not require allocation between departments is a(n):
answer
Direct expense.
question
Expenses that are easily traced and assigned to specific department because they are incurred for the sole benefit of that department are called:
answer
Direct expenses
question
Expenses that are not easily associated with a specific department, and which are incurred for the benefit of more than one department, are:
answer
Indirect expenses
question
The salaries of employees who spend all their time working in one department are:
answer
Direct expenses
question
A difficult problem in calculating the total costs and expenses of a department is:
answer
Assigning indirect expenses to the department.
question
The allocation bases for assigning indirect costs include:
answer
Any appropriate and reasonable bases.
question
The most useful allocation basis for the departmental costs of an advertising campaign for a storewide sale is likely to be:
answer
Total sales of each department
question
Costs that the manager has the power to determine or at least strongly influence are called:
answer
Controllable costs
question
A report that specifies the expected and actual costs under the control of a manger is a:
answer
Responsibility accounting report.
question
An accounting system that provides information that management can use to evaluate the performance of a department's manager is called a:
answer
Responsibility accounting system.
question
Costs that the manager does not have the power to determine or strongly influence are:
answer
Uncontrollable costs
question
Within an organizational structure, the person most likely to be evaluated in terms of controllable costs would be:
answer
A cost center manager
question
The most useful evaluation of a manager's cost performance is based on:
answer
Controllable costs.
question
Which of the following would not appear on a responsibility accounting performance report?
answer
Uncontrollable costs
question
In a responsibility accounting system:
answer
Controllable costs are assigned to managers who are responsible for them.
question
Responsibility accounting performance reports:
answer
Become less detailed at higher levels of management.
question
A responsibility accounting performance report documents:
answer
Both actual costs and budgeted costs.
question
A responsibility accounting report that compares actual costs and expenses for a department with the budgeted amounts is called a(n):
answer
Performance report
question
A responsibility accounting system:
answer
Can be applied at any level of an organization.
question
Under which of the following conditions is a market-based transfer price likely to be used?
answer
There is no excess capacity.
question
A single cost incurred in producing or purchasing two or more essentially different products is a:
answer
Joint cost
question
Allocations of joint product costs can be based on the relative market values of the products:
answer
At the time the products are separated.
question
Allocating joint costs to products can be based on their relative:
answer
Market values
question
Which of the following is an example of a performance measure of internal business processes that would be found in a balanced scorecard:
answer
Product defect rates
question
Which of the following is an example of a performance measure of the customer perspective that would be found in a balanced scorecard?
answer
Number of new customers.
question
Which of the following is an example of a financial performance measure that would be found in a balance scorecard?
answer
Residual income
question
Which of the following is an example of a financial performance measure that would be found in a balance scorecard?
answer
Return on investment.
question
In the preparation of departmental income statements, the preparer completes the following steps in the following order:
answer
Identify direct expenses; allocate indirect expenses; allocate service department expenses.
question
The amount by which a department's revenues exceed its direct costs and expenses is the:
answer
Departmental contribution to overhead.
question
Departmental contribution to overhead is calculated as revenues of the department less:
answer
Direct costs and expenses.
question
Process time is the time:
answer
Spent producing the product
question
Wait time is the time:
answer
That an order or job sits with no production applied to it.