The comparison of differences between actual and planned results
answer
appears on periodic budget reports.
Unlock the answer
question
A static budget
answer
shows planned results at the original budgeted activity level.
Unlock the answer
question
Top management's reaction to a difference between budgeted and actual sales often depends on
answer
the materiality of the difference.
Unlock the answer
question
If costs are not responsive to changes in activity level, then these costs can be best described as
answer
fixed.
Unlock the answer
question
What is the primary difference between a static budget and a flexible budget?
answer
The static budget is prepared for a single level of activity, while a flexible budget is adjusted for different activity levels.
Unlock the answer
question
A flexible budget
answer
projects budget data for various levels of activity.
Unlock the answer
question
What budgeted amounts appear on the flexible budget?
answer
Budgeted amounts for the actual activity level achieved
Unlock the answer
question
The flexible budget
answer
is a series of static budgets at different levels of activity
Unlock the answer
question
Another name for the static budget is
answer
master budget.
Unlock the answer
question
Within the relevant range of activity, the behavior of total costs is assumed to be
answer
linear and upward sloping.
Unlock the answer
question
Management by exception
answer
means that material differences will be investigated.
Unlock the answer
question
Under management by exception, which differences between planned and actual results should be investigated?
answer
Material and controllable
Unlock the answer
question
The activity index used in preparing the flexible budget
answer
should significantly influence the costs that are being budgeted.
Unlock the answer
question
A static budget is not appropriate in evaluating a manager's effectiveness if a company has
answer
substantial variable costs
Unlock the answer
question
The accumulation of accounting data on the basis of the individual manager who has the authority to make day-to-day decisions about activities in an area is called
answer
responsibility accounting
Unlock the answer
question
A cost is considered controllable at a given level of managerial responsibility if
answer
the manager has the power to incur the cost within a given time period.
Unlock the answer
question
As one moves up to each higher level of managerial responsibility
answer
a greater number of costs are controllable.
Unlock the answer
question
A responsibility report should
answer
show only those costs that a manager can control
Unlock the answer
question
Performance reports for cost centers compare actual
answer
controllable costs with flexible budget data
Unlock the answer
question
In the performance report for cost centers
answer
no distinction is made between fixed and variable costs
Unlock the answer