Chads Creative Concepts Essay Example
Chads Creative Concepts Essay Example

Chads Creative Concepts Essay Example

Available Only on StudyHippo
  • Pages: 3 (637 words)
  • Published: August 3, 2016
  • Type: Case Study
View Entire Sample
Text preview

1. The company must allocate resources, including labor and equipment, to both custom and standard furniture. They should also assign more skilled craftsmen to the challenging custom jobs that require greater time and skill. Moreover, they need to establish the feasible amount of overtime hours when faced with numerous orders to fulfill. Despite increasing sales, the process is not operating at its maximum potential and lacks 100% efficiency.

Chad needs to prioritize and schedule accordingly when there is a backlog of orders. This is crucial because custom made furniture has a longer lead time compared to standard furniture. As a result, standard furniture is ready for delivery sooner than custom made units. When taking orders, Chad should commit to more realistic delivery times.

Daily decisions regarding inventory levels and work in process are crucial. When inventory acc

...

umulates, costs also accumulate. It is important to make informed choices about allocating funds for equipment and production, including the purchase of new machinery. Additionally, Chad must consider relocating and reorganizing the layout of the equipment and machinery, as he deals with two different product lines. A more efficient layout is necessary to avoid confusion or mixing up of materials and personnel.

2. The sales of standard furniture are continuously increasing, creating a production problem. The problem arises because custom furniture brings in higher profits. When there is a sudden increase in orders for standard furniture, the production process for standard furniture gets delayed as employees concentrate on making custom pieces instead. Consequently, there is a substantial accumulation of inventory and work-in-progress (WIP), leading to increased costs related to storing these products.

Th

View entire sample
Join StudyHippo to see entire essay

introduction of the new product line has affected scheduling, quality, and equipment at Chad's reputable and trusted company. Clients can still rely on the standard units. However, the new product line also impacts production time as there are now two lines being produced. The general purpose equipment tends to use up a significant amount of time for the standard furniture used in custom products. With limited machine hours available, it is crucial to allocate time effectively for each product line.

3. Despite the increasing sales of both product lines, the expense of maintaining two lines is also growing. The profitability of standard furniture is lower, so Chad needs to prioritize cost control and efficient production. Currently, skilled employees are working on both types of furniture instead of focusing more on custom-made pieces. This leads to standard furniture being neglected during busy periods, resulting in additional costs for storage and inventory housing. To accommodate limited available space, all excess furniture is now stored in third-party facilities. Consequently, overall costs are rising and ultimately reducing the company's profits.

4. Chad could have implemented various changes in marketing and logistics. It is crucial to establish separate facilities for each of the two product lines. If both lines are produced in the same building, Chad must divide them in order to maintain control and organization. This segregation would prevent any mixing up of resources and personnel, with one side dedicated to standard products and the other to custom products. Furthermore, Chad should assess employees' capabilities and allocate them to more challenging tasks, thereby guaranteeing adherence to quality standards.

The addition of the second product line resulted

in increased costs and complications. It would have been wise for Chad to conduct market analysis and assess potential profits before deciding to produce standard furniture. The pressure is higher for the standard furniture due to demanding deadlines and delivery requirements. Avoiding this line would have prevented conflicts with scheduling and prioritization. Chad's company has established a strong reputation in the market for its custom-made furniture. However, the introduction of the standard line has led to numerous problems, such as failure to meet delivery times and the production of subpar furniture, which may tarnish Chad's good name.

Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New