SAP STUDY QUIZ – Flashcards
Unlock all answers in this set
Unlock answersquestion
Shelf storage, pallet storage, and rack storage are examples of
answer
Storage Types
question
Consider the following scenario, then choose which one of the options below corresponds to the level of CIRs and PIRs after consumption. Before consumption: Procurement proposal for CIRs: 50 Procurement proposal for PIRs: 50
answer
CIRs: 50, PIRs: 0
question
Which of the following represents the document used to plan the movement of materials into and out of bins in a warehouse?
answer
TRANSFER REQUIREMENT
question
In the production process, a goods issue reflects
answer
Issuing raw materials or semifinished goods to a production order.
question
The organizational data elements in material planning are:
answer
Client, company code, plant, storage location.
question
Which of the following is a request to change the status of the material?
answer
Posting change notice
question
Replenishment lead time is
answer
The time between placing an order and receiving the materials.
question
Given the following information, use the net requirement calculation to calculate the available stock. MRP type is consumption-based planning. Plant stock = 100 Receipts = 20 Issues = 10 Safety stock = 30
answer
120
question
Setup time is the time required to
answer
Set up the work centers used in production.
question
Which of the following options is appropriate when two locations are physically close to each other and there is no significant time lag between issue and receipt?
answer
One-Step Procedure
question
The ERP system can create transfer orders automatically, but only when
answer
A reference document exists.
question
Which of the following scenarios requires material-to-material posting?
answer
Changing the material number of a material
question
In SAP ERP production planning strategy, net requirements planning (Strategy 10), procurement proposals are based on
answer
PIRs, without regard to CIRs.
question
Warehouse management is typically used
answer
By organizations that have either large quantities of materials or an expensive inventory.
question
The static lot-sizing procedure
answer
Specifies a fixed quantity based on either fixed lot size or lot-for-lot.
question
Exploding the BOM refers to
answer
Calculating and planning requirements for materials at all levels of the BOM.
question
Which of the following statements best represents what procurement type indicates?
answer
Whether a material is produced in house, obtained externally, both, or none
question
What is SOP used for?
answer
Forecasting and planning
question
A picking area groups which of the following elements?
answer
Storage bins, based on similar picking strategies
question
The key organizational level associated with inventory management is
answer
Storage location.
question
When creating a transfer order, you find that a particular material has to be moved from multiple source bins. Which of the following statements follows from this scenario?
answer
The transfer order will have multiple line items for the material.
question
Which of the following represents the hierarchy of a warehouse?
answer
Warehouse, storage type, storage section, storage bin
question
MRP type specifies
answer
The production control technique used in planning.
question
What is a stock transfer used for?
answer
To physically move materials within the enterprise from one organizational level or location to another
question
Requirements that are calculated based on actual and forecasted sales are known as
answer
Planned independent requirements.
question
The planning table is best defined as
answer
A spreadsheet-like tool used to complete the tasks in SOP.
question
Which of the following statements about consumption-based planning is TRUE?
answer
Planning is based on historical data.
question
Shelves, stacks, and aisles are examples of
answer
Coordinate systems for addresses.
question
Which of the following statements about the goods receipt step are NOT true?
answer
It results in a decrease in inventory.
question
A storage type is a division of a warehouse based on the characteristics of the
answer
Space, materials, and activity.
question
A company has two options for procuring materials: make or buy. Which MRP data view of the material master will the ERP system consider for this decision?
answer
MRP 2
question
Which of the following options represents categories of consumption-based planning?
answer
Forecast-based planning, time-phased planning, reorder-point planning
question
Which of the following is most likely to trigger the MRP process?
answer
Changes to MRP elements
question
When do unplanned receipts occur?
answer
When a reference document does not exist
question
Which one of the steps listed most likely would be the final step in the procurement process?
answer
Send payment
question
In which of the following processes is a material document NOT created?
answer
Warehouse management
question
After a transfer order related to fulfillment has been confirmed, which of the following steps is most likely to occur next?
answer
Shipping
question
Shipping, billing, and payment are steps in which process?
answer
Fulfillment
question
Receive invoice is a step in which process?
answer
Procurement
question
A company has decided to acquire materials via internal procurement. What is the likely next step?
answer
Create an STO
question
Identify the step in the procurement process for which a material document is created.
answer
Goods receipt
question
Identify the step in the fulfillment process for which a material document is created.
answer
Goods issue.
question
Which statement about the production process is TRUE?
answer
It involves issuing materials to the production order.
question
In the procurement process, a purchase requisition is created during which step?
answer
Requirements determination
question
In a plant-to-plant movement, valuation occurs at
answer
Goods issue and at the valuation price of the issuing plant.
question
Calculate the financial effect of a goods issue posting based on the following data. Procurement type: Internal Materials: Pens Quantity shipped: 100 Valuation price at the receiving plant (for one pen): $2.30 Valuation price at the sending plant (for one pen): $2.40
answer
Debit and credit to the inventory account for $240.00.
question
What is the FI effect ofa goods receipt posting in the external procurement process?
answer
Debit inventory, credit GR/IR
question
What is the general ledger impact when a vendor invoice is received and verified?
answer
Debit GR/IR, credit vendor subledger account
question
What is the general ledger impact when a transfer requirement is created in the warehouse management process?
answer
There is no GL impact
question
In WM steps related to fulfillment, a transfer order is created based on a(n)
answer
Delivery Document
question
What is the general ledger impact of the goods issue step in the fulfillment process?
answer
Debit COGS, credit inventory
question
Calculate the debit and credit for the goods issue step in the fulfillment process, based on the following data. (Note: You need to pick the right price for this calculation.) Materials sold (trading goods): Printers Quantities sold: 100 Price for customer: $120.00 Current average moving price: $85.00 Price from vendor: $84.00 Average price 30 days before customer order was placed: $86.00
answer
$8,500
question
What is the GL entry when a company receives a payment from a customer?
answer
Debit bank, credit customer, credit accounts reconciliation account
question
What is the CO impact in the confirmation step of the production process?
answer
Labor costs are transferred from the work centers to the production order.
question
What is the general ledger impact of the goods receipt step during a stock transfer?
answer
There is no GL impact