Project Management Exam 2 Terms – Flashcards
Unlock all answers in this set
Unlock answersquestion
Avoiding risk
answer
Elimination of the risk cause before the project begins.
question
Budget reserve
answer
Reserve setup to cover identified risks that may occur and influence baseline tasks or costs. These reserves are typically controlled by the project manager and the project team. See management reserve.
question
Change management system
answer
A defined process for authorizing and documenting changes in the scope of a project.
question
Contingency plan
answer
A plan that covers possible identified project risks that may materialize over the life of the project.
question
Management reserve
answer
A percentage of the total project budget reserved for contingencies. The fund exists to cover unforeseen, new problems—not unnecessary overruns. The reserve is designed to reduce the risk of project delays. Management reserves are typically controlled by the project owner or project manager. See budget reserve.
question
Mitigating risk
answer
Action taken to either reduce the likelihood that a risk will occur and/or the impact the risk will have on the project.
question
Opportunity
answer
An opportunity is an event that can have a positive impact on project objectives.
question
Retaining risk
answer
Simply accepting the risk and not taking any pre-emptive action to mitigate the risk.
question
Risk
answer
The chance that an undesirable project event will occur and the consequences of all its possible outcomes.
question
Risk breakdown structure (RBS)
answer
A hierarchical depiction of the identified project risks arranged by risk category and subcategory that identifies the various areas and causes of potential risks.
question
Risk register
answer
A risk register details all identified risks, including descriptions, category, and probability of occurring, impact, responses, contingency plans, owners, and current status.
question
Risk profile
answer
A list of questions that addresses traditional areas of uncertainty on a project.
question
Risk severity matrix
answer
A tool used to assess the impact of risks on a project.
question
Scenario analysis
answer
Scenario analysis is the easiest and most commonly used technique for analyzing risks.
question
Time buffer
answer
A contingency amount of time for an activity to cover uncertainty—for example, availability of a key resource or merge event.
question
Transferring risk
answer
Shifting responsibility for a risk to another party.
question
Heuristic
answer
A rule of thumb used to make decisions. Frequently found in scheduling projects. For example, schedule critical activities first, then schedule activities with the shortest duration.
question
Leveling
answer
Techniques used to examine a project for an unbalanced use of resources, and for resolving resource over-allocations.
question
Planned value (PV)
answer
The planned time-phased baseline of the value of the work scheduled. Previously this was called budgeted cost of work scheduled (BCWS).
question
Resource-constrained projects
answer
A project that assumes resources are limited (fixed) and therefore time is variable.
question
Resource Smoothing
answer
If resources are adequate but the demand varies widely over the life of the project, it may be desirable to even out resource demand by delaying noncritical activities (using slack) to lower peak demand and, thus, increase resource utilization. This process is called resource smoothing.
question
Splitting
answer
A scheduling technique in which work is interrupted on one activity and the resource is assigned to another activity for a period of time, then reassigned to work on the original activity.
question
Time-constrained projects
answer
A project that assumes time is fixed and, if resources are needed, they will be added.
question
Time-phased budget baseline
answer
Planned costs that are broken down by distinct time periods (e.g., $5,000 per week) for a work package, as opposed to a budget for a whole job/project (6 months for a total of $130,000). Time phasing allows better cost control by measuring the actual rate of expenditure versus the planned expenditure rate over small pieces of the project.
question
Crashing
answer
Shortening an activity or project.
question
Crash point
answer
The most a project activity time can realistically be compressed with the resources available to the organization.
question
Direct costs
answer
Costs that are clearly charged to a specific work package—usually labor, materials, or equipment.
question
Fast-tracking
answer
Accelerating project completion typically by rearranging the network schedule and using start-to-start lags.
question
Indirect costs
answer
Costs that cannot be traced to a particular project or work package.
question
Outsourcing
answer
Contracting for the use of external sources (skills) to assist in implementing a project.
question
Project cost-duration graph
answer
A graph that plots project cost against time; it includes direct, indirect, and total cost for a project over a relevant range of time.
question
Crash time
answer
The shortest time an activity can be completed (assuming a reasonable level of resources).
question
Emotional intelligence (EQ)
answer
The ability or skill to perceive, assess, and manage the emotions of one's self and others.
question
Inspiration-related currencies
answer
Influence based on inspiration (opportunity to do good, be the best, etc.).
question
Law of reciprocity
answer
People are obligated to grant a favor comparable to the one they received.
question
Leading by example
answer
Exhibiting the behaviors you want to see in others.
question
Management by wandering around (MBWA)
answer
A management style in which managers spend the majority of their time outside their offices interacting with key people.
question
Personal-related currencies
answer
Influence based on enhancing another person's self-esteem.
question
Position-related currencies
answer
Influence based on the ability to enhance someone else's position within an organization.
question
Proactive
answer
Working within your sphere of influence to accomplish something.
question
Relationship-related currencies
answer
Influence based on friendship.
question
Social network building
answer
The process of identifying and building cooperative relationships with key people.
question
Stakeholder
answer
Individuals and organizations that are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or completion. They may also exert influence over the project and its results.
question
Systems thinking
answer
A holistic approach to viewing problems that emphasizes understanding the interactions among different problem factors.
question
Task-related currencies
answer
Influence based, helping someone else do their work.
question
Brainstorming
answer
Generating as many ideas/solutions as possible without critical judgment.
question
Dysfunctional conflict
answer
Disagreement that does not improve project performance.
question
Functional conflict
answer
Disagreement that contributes to the objectives of the project.
question
Groupthink
answer
A tendency of members in highly cohesive groups to lose their critical evaluative capabilities.
question
Nominal group technique (NGT)
answer
A structured problem-solving process in which members privately rank-order preferred solutions.
question
Positive synergy
answer
A characteristic of high-performance teams in which group performance is greater than the sum of individual contributions
question
Project kick-off meeting
answer
Typically the first meeting of the project team.
question
Project vision
answer
An image of what the project will accomplish.
question
Team building
answer
A process designed to improve the performance of a team.
question
Team rituals
answer
Ceremonial actions that reinforce team identity and values.
question
Virtual project team
answer
Spatially separated project team whose members are unable to communicate face to face. Communication is usually by electronic means.
question
Best alternative to a negotiated agreement (BATNA)
answer
Strong or weak BATNA indicates your power to negotiate with the other party.
question
Co-location
answer
A situation in which project members including those from different organizations work together in the same location.
question
Escalation
answer
A control mechanism for resolving problems in which people at the lowest appropriate level attempt to resolve a problem within a set time limit or the problem is "escalated" to the next level of management.
question
Met-expectations model
answer
Customer satisfaction is a function of the extent to which perceived performance exceeds expectations.
question
Outsourcing
answer
Contracting for the use of external sources (skills) to assist in implementing a project.
question
Partnering charter
answer
A formal document that states common goals as well as cooperative procedures used to achieved these goals, which is signed by all parties working on a project.
question
Principled negotiation
answer
A process of negotiation that aims to achieve win/win results.
question
Baseline budget
answer
A concrete document and commitment; it represents the first real plan with cost, schedule, and resource allocation. The planned cost and schedule performance are used to measure actual cost and schedule performance. Serves as an anchor point for measuring performance.
question
Budget at completion (BAC)
answer
Budgeted cost at completion. The total budgeted cost of the baseline or project cost accounts.
question
Control chart
answer
This chart is another tool used to monitor past project schedule performance and current performance and to estimate future schedule trends.
question
Cost performance index (CPI).
answer
The ratio of work performed to actual costs (EV/AC).
question
Cost variance (CV)
answer
The difference between EV and AC (CV = EV - AC). Tells if the work accomplished cost more or less than was planned at any point over the life of the project.
question
Earned value (EV)
answer
The physical work accomplished plus the authorized budget for this work. Previously this was called the budgeted cost of work performed (BCWP).
question
Estimated cost at completion (EAC)
answer
The sum of actual costs to date plus revised estimated costs for the work remaining in the WBS. The text uses EACre to represent revisions made by experts and practitioners associated with the project. A second method is used in large projects where the original budget is less reliable. This method uses the actual costs to date plus an efficiency index (CPI = EV/AC) applied to the remaining project work. When the estimate for completion uses the CPI as the basis for forecasting cost at completion, we use the acronym EACf, where EACf = estimated costs at completion. Includes costs to date plus revised estimated costs for the work remaining. (Uses formula to compute EAC.)
question
Estimated cost at completion—Forecasted (EACf)
answer
Estimated cost to complete (uses formula to compute estimates).
question
Estimated cost at completion—Revised (EACre)
answer
Estimated cost to complete (uses expert estimates).
question
Percent complete index—budget costs (PCIB)
answer
Percentage of work accomplished to date based on original budget of the project (EV/BAC).
question
Percent complete index—actual costs (PCIC).
answer
Percentage of work accomplished to date based on expected cost of the project. (AC/EAC).
question
Schedule performance index (SPI)
answer
The ratio of work performed to work scheduled (EV/PV).
question
Schedule variance (SV)
answer
The difference between the planned dollar value of the work actually completed and the value of the work scheduled to be completed at a given point in time (SV = EV - PV). Schedule variance contains no critical path information.
question
Scope creep
answer
The tendency for the scope of a project to expand once it has started.
question
To complete performance index (TCPI)
answer
The value each remaining dollar in the budget must earn to stay within budget (BAC-EV/BAC-AC).
question
Tracking Gantt chart
answer
A Gantt chart that compares planned versus actual schedule information.
question
Variance at completion (VAC)
answer
Indicates expected actual cost over- or under run at completion (VAC = BAC − EAC).
question
Lessons learned
answer
Lessons learned represent an analysis carried out during and shortly after the project life cycle; they attempt to capture positive and negative project learning.
question
Performance review
answer
In general, all review methods of individual performance center on the technical and social skills brought to the project and team. These reviews stress personal improvement and are frequently used for salary and promotion decisions.
question
Project closure
answer
All of the activities of shutting down a project. The major activities are evaluation of project goals and performance, developing lessons learned, releasing resources, and preparing a final report.
question
Project evaluation
answer
The process of assessing, verifying, and documenting project results.
question
Project facilitator
answer
A guide who leads the project team through an analysis of project activities that went well, what needs improvement, and development of a follow-up action plan with goals and accountability.
question
Retrospective
answer
A methodology that analyzes a past project event to determine what worked and what didn't, develops lessons learned, and creates an action plan that ensures lessons learned are used to improve management of future projects.
question
Team evaluation
answer
Evaluating the performance of the project team using a minimum core of conditions in place before the project began. Evaluation practices should emphasize the team as a whole, while minimizing individual performance.
question
360-degree review (feedback)
answer
A multirater appraisal system based on performance information that is gathered from multiple sources (superiors, peers, subordinates, customers).