Managerial Accounting Chapter 4 Answers – Flashcards

Unlock all answers in this set

Unlock answers
question
True or False: A traditional costing system allocates overhead by means of multiple overhead rates.
answer
False
question
True or False: Activity-based costing allocates overhead costs in a two-stage process.
answer
True
question
True or False: Direct materials and direct labor costs are easier to trace to products that overhead.
answer
True
question
True or False: As manufacturing processes have become more automated, more companies have chosen to allocate overhead on the basis of direct labor costs.
answer
False
question
True or False: In activity-based costing, an activity is any event, action, transaction, or work sequence that incurs costs when producing a product.
answer
True
question
Value Added or Non-Value Added: Inspecting completed skis
answer
Non-value added
question
Value Added or Non-Value Added: Storing raw materials
answer
Non-value added
question
Value Added or Non-Value Added: Machine setups
answer
Non-value added
question
Value Added or Non-Value Added: Installing binding on skis
answer
Value added
question
Value Added or Non-Value Added: Packaging skis for shipment
answer
Value added
question
Value Added or Non-Value Added: Reworking defective skis
answer
Non-value added
question
Batch Level, Product Level, Unit Level, or Facility Level? Engineering Design
answer
Product-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Machine Setup
answer
Batch-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Toy Design
answer
Product-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Interviews of Prospective Employees
answer
Facility-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Inspection After Each Setup
answer
Batch-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Polishing Parts
answer
Unit-Level
question
Batch Level, Product Level, Unit Level, or Facility Level? Assembling Parts
answer
Unit-level
question
Batch Level, Product Level, Unit Level, or Facility Level? Health and Safety
answer
Facility-level
question
Self-Test Question: Activity-based costing (ABC):
answer
focuses on activities performed to produce a product, and is a 2-stage overhead cost allocation system that identifies activity cost pools and cost drivers.
question
Self-Test Question: Any activity that causes resources to be consumed is called a __________
answer
cost driver.
question
Self-Test Question: The first step in the development of an activity-based costing system is:
answer
identify and classify activities and allocate overhead to cost pools.
question
Self-Test Question: Which of the follow would be the BEST cost driver for the assembling cost pool? A. Number of product lines B. Number of parts C. Number of orders D. Amount of square footage
answer
B. Number of parts
question
Self-Test Question: A frequently cited limitation of activity-based costing is:
answer
certain overhead costs remain to be allocated by means of come arbitrary volume-based cost driver such as labor or machine hours.
question
Self-Test Question: A company should consider using ABC if:
answer
its product lines differ greatly in volume and manufacturing complexity.
question
Self-Test Question: An activity that adds costs to the product but does not increase its perceived market value is a:
answer
non-value added activity
question
Self-Test Question: Which of the following activities is value-added activity? A. Storage of raw materials B. Moving parts from machine to machine C. Shaping a piece of metal on a lathe D. All of the above
answer
C. Shaping a piece of metal on a lathe
question
Self-Test Question: A relevant facility-level cost driver for heating cost is:
answer
Floor Space
question
Define: Batch-level activities
answer
Activities performed for each batch of products rather than for each unit.
question
Define: Facility-level activities
answer
Activities required to support or sustain an entire production process.
question
Define: Product-level activities
answer
Activities performed in support of an entire product line, but not always performed every time a new unit or batch of products is produced.
question
Define: Unit-level activities
answer
Activities performed for each unit of production.
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New