Test #2 – Leadership – Flashcards

Unlock all answers in this set

Unlock answers
question
is determining which quality requirements and/or standards are important for the project and the product and then documenting how compliance will be demonstrated
answer
Quality Management Plan
question
provides the basis for continuous improvement by auditing and evaluating the results from quality control measurements so that appropriate quality standards and operational definitions are used.
answer
Perform Quality Assurance
question
is monitoring and documenting the results of executing project quality activities to eliminate causes of unsatisfactory performance and implement new processes and techniques to improve project quality throughout the organization.
answer
Perform Quality Control
question
is the person most closely associated with the scientific management approach
answer
Frederic Taylor
question
published the Quality Control Handbook which viewed quality as "fitness for use" as perceived by the customer
answer
Joseph Juran
question
The CMM/CMMI level characterized by an immature software organization using ad hoc process is
answer
Level 1 Initial
question
The CMM/CMMI level which is the first to introduce key process areas is
answer
Level 2 Repeatable
question
The CMM/CMMI level which documents and standardizes software engineering and management processes throughout the organization is
answer
Level 3 Defined
question
The CMM/CMMI level which is the first to introduce technology change management
answer
Level 5 Optimizing
question
The CMM/CMMI level which is characterized by the addition of Software Quality management and Quantitative Process Management is
answer
Level 4 Managed
question
A _____ refers to the activities, methods, materials, and measurements used to produce the product or service
answer
Process
question
introduced the control chart to better understand process variations.
answer
Walter Shewhart
question
The core values of quality programs proposed by Shewhart, Deming, Juran, Ishikawa, and Crosby include:
answer
Focus on the Customer
question
Verification and validation of project deliverables should be carried out
answer
at the end of the project
question
n general control limits are set at + or -________ standard deviations which provides ________ probability limits.
answer
3, .001
question
A _____ provides a picture of how a particular process is behaving over time by providing a chart with a center line and limits on either side of the center line.
answer
Control Chart
question
A _____ is best developed by brainstorming with a learning cycle approach to identify and correct a particular problem.
answer
Fishbone Diagram
question
A _____ is useful for identifying and investigating the most important problems by ranking them in descending order.
answer
Pareto Diagram
question
A list of 14 points for quality is associated with
answer
Deming
question
Defect arrival rate is an example of a
answer
Process Metric
question
Customer found defects is an example of a
answer
Product Metric
question
Earned Value (EV) would be an example of a
answer
Project Metric
question
Quality metrics should focus on
answer
All of these
question
Which of the following is a product-oriented activity that attempts to determine if the system or project deliverable meets the customer or client's expectations?
answer
Validation
question
Which of the following focuses on the process-related activities of the project to ensure that the product or deliverable meets its specified requirements before final testing of the system begins?
answer
Verification
question
Which of the following is not a traditional management activity?
answer
Inspiring a vision
question
Leadership includes
answer
Setting a direction
question
The approach to leadership where the leader leads by example is:
answer
Model the way
question
means that a leader's behavior wins respect, not title or position within the organization.
answer
Model the way
question
The approach to leadership that entails inventing the future so that people become committed to a purpose is:
answer
Inspire a vision
question
means understanding the needs, interests, and "speaking the language" of constituents.
answer
Inspire a vision
question
The approach to leadership where the leader is viewed as a pioneer who seeks out opportunities to innovate, grow, and improve is:
answer
Challenge the process
question
means recognizing and supporting good ideas, and making sure these ideas happen.
answer
Challenge the process
question
The approach to leadership that requires a leader to support collaboration and build trust among project stakeholders is
answer
Enable others to act
question
means empowering people and motivating them to do their best, feel a sense of ownership, and take pride in what they do.
answer
Enable others to act
question
The project team appears to be tired, disillusioned, frustrated, and willing to give up. The most appropriate leadership approach would be:
answer
Encourage the heart
question
means using simple gestures to show appreciation for people's contributions and recognition of accomplishments
answer
Encourage the heart
question
The coercive leadership style can be summarized as
answer
"Do as I say"
question
The leadership style that is most effective in a crisis situation is the:
answer
The coercive style
question
The authoritative leadership style can be summarized as:
answer
"Come with me"
question
The leadership style where the leader outlines a clearly defined goal but empowers people to choose their own means for achieving it is the:
answer
The authoritative style
question
The leadership style that follows the attitude that "people come first" is the:
answer
The affiliative style
question
centers of the value of the individual rather than goals and tasks and attempts to keep people happy by creating harmony.
answer
The affiliative style
question
The democratic leadership style can be summarized as:
answer
"What do you think"
question
The leadership style that would be least effective in a crisis situation would be the:
answer
The democratic style
question
When using _____, the leader spends time getting other people's ideas, while building trust, respect, and commitment
answer
The democratic style
question
The pacesetting leadership style can be summarized as:
answer
"Do as I do, now"
question
The leadership style where poor performers are quickly identified and replaced if standards are not met is the:
answer
The pacesetting style
question
The coaching leadership style can be summarized as:
answer
"Try this"
question
The leadership style that helps people identify their unique strengths and weaknesses so that they can achieve their personal and career goals is the:
answer
The coaching style
question
Emotional intelligence
answer
All of these
question
A capability that outlines a specific set of competencies associated with emotional intelligence is:
answer
All of these capabilities are associated with emotional intelligence
question
Visionary leadership, influence, developing others, and communication are all associated with _____ of Emotional Intelligence
answer
Social skills
question
Many organizations are mandating ethics training for their employees because
answer
It is in the best interest for people in the organization and society
question
An unethical leader could be described as someone who
answer
Is a weak moral individual and a weak moral manager
question
A hypocritical leader could be described as someone who
answer
Extols the virtues of integrity and ethical conduct, but then engages in unethical behavior
question
An ethically neutral leader could be described as someone who
answer
Does not provide a clear message of the ethical conduct that is expected, so people interpret this to mean that the leader doesn't care how business goals are met - just that they are met.
question
An ethical leader could be described as someone who:
answer
Makes it clear that bottom line results are important, but only if they can be achieved in an ethical manner
question
Focusing on fairness in terms of equity, reciprocity, and impartiality is hoping to avoid which ethical dilemma?
answer
Human resource
question
A gift from a vendor could cause the following ethical dilemma
answer
conflict of interest
question
While working on an IT project, you learn that a particular department plans to reduce its staff by 50%. The manager of this department has asked the project team to keep this information secret until the plans are finalized. A good friend of yours works in this department and has asked you whether you heard of any news concerning the future of the department. This would be an example of which of the following ethical dilemmas?
answer
conflict of interest
question
Your employer has issued you a computer. Using this computer to trade stocks online could be considered which of the following ethical dilemmas?
answer
corporate resource
question
The first thing to consider when faced with an ethical dilemma would be
answer
gather the facts
question
Which of the following would NOT be considered a complexity of international projects?
answer
All of these are complexities of international projects
question
Differences in nationality, ethnicity, religion, gender, or generation is:
answer
Diversity
question
can be defined as the shared beliefs, assumptions, and values that we learn from society or a group that guides or influences our behavior.
answer
Culture
question
The tool most closely associated with activity bars across a horizontal time axis is:
answer
Gantt Chart
question
is considered the most useful and widely used project management tool.
answer
Gantt Chart
question
can be useful for tracking and monitoring project progress because they are simple and straightforward.
answer
Gantt Chart
question
provide valuable information about the logical sequence and dependencies among the various activities and tasks:
answer
Project Network Diagrams
question
The amount of time an activity can be delayed before affecting the project deadline is
answer
Slack
question
The technique used to find the sequence of tasks with zero slack (or float) is most closely associated with:
answer
Critical Path Analysis
question
The Critical Path is:
answer
The longest path in the project network
question
Adding resources to an activity to shorten the critical path is called
answer
Crashing
question
Completing activities in parallel is called
answer
Fast Tracking
question
The technique used to help manage the Polaris submarine project and which bases activity estimates on probabilistic estimates of three scenarios is most closely associated with:
answer
Polaris
question
Starting the next task before the first task is complete is
answer
lead
question
An activity being analyzed under PERT was judged to most likely have a duration of 40 days. When considering the time it would take to complete the activity if every relevant factor went well, it was estimated to be able to be doable in 20 days and even under the worst case imaginable, the task would be take 50 days. The estimates PERT duration of that activity is:
answer
38.33 days
question
Based upon the following diagram and activity durations, the Critical Path is:
answer
A. (A, B, C, F, H, J)
question
Under the Precedence Diagramming Method, the situation which occurs when a relationship between two tasks that can or must start at the same time is called:
answer
Start-To-Start (SS)
question
Under the Precedence Diagramming Method, the most common relationship between two activities which implies a logical sequence is called:
answer
Finish-To-Start (FS)
question
Installing the operating system on a computer before loading any application packages is an example of:
answer
Finish-To-Start (FS)
question
Under the Precedence Diagramming Method, the situation which occurs when two activities can start at different times, have different durations, but are planned to be competed at the same time is called:
answer
Finish-To-Finish (FF)
question
Under the Precedence Diagramming Method, the situation which occurs when task A cannot end until task B starts is called:
answer
Start-To-Finish (SF)
question
Waiting to leave your shift until another person shows up is an example of:
answer
Start-To-Finish (SF)
question
Under the Precedence Diagramming Method, the least common relationship between two activities which occurs when they must complete at the same time is called:
answer
Start-To-Finish (SF)
question
Critical Chain Project Management (CCPM) is based on the idea that
answer
people often inflate or add cushioning to their time estimates
question
Rolling wave planning is:
answer
preparing a summary plan and developing incremental detailed schedules
question
The final step in determining the cost of an activity is:
answer
ensuring resources are leveled