3m maintenance and material management – Flashcards

Unlock all answers in this set

Unlock answers
question
3m manager
answer
XO
question
senior enlisted manages the 3m system day by day
answer
3MC
question
signs 13 week report and reviews maintenance within division to ensure that its accomplished.
answer
Divo
question
manage individual work centers and ensure maintenance gets done and all administrative data up top date.
answer
Work Center Supervisor
question
maintenance requirement card- step by step procedure to do maintenance
answer
MRC
question
maintenance index page- LIST of MRC'S for one system
answer
MIP
question
list of effective pages- LIST of all MIP'S for work CENTER
answer
LOEP
question
record of previous force revisions
answer
Change Page
question
1.MRC 2. MIP 3.LOEP 4.Change Page
answer
Validation of MRC ORDER
question
Use Syscom control number, description, and periodicity code.
answer
MRC to MIP
question
Use the MIP control number and the date to verify
answer
Verifying MIP to LOEP
question
Match the Force Revision number and the date
answer
LOEP to Change Page
question
Classified MRC
answer
What is Pink ?
question
daily
answer
D
question
weekly
answer
W
question
monthy
answer
M
question
quarterly
answer
Q
question
semiannually
answer
S
question
annually
answer
A
question
check/situational requirement (this means check is done because something is happening like getting underway or recieving parts/tools)
answer
R
question
changes how often you do it
answer
The # in front tells you what ?
question
Every second week
answer
2W
question
Every 12 months
answer
12M
question
Every month NOT every 2 months (ONLY when letter is before #)
answer
M-2
question
7
answer
How many periodicity letters are there ?
question
used to verify MRC to MIP
answer
Syscom Control number
question
first digit 7- July second digit 4- 2014 updated at least every 10 years
answer
74 4ABF N
question
January- Sept.
answer
1-9
question
Oct.-Dec.
answer
a-c
question
The 4 middle digits are the alphanumeric code to identify each MRC
answer
4ABF
question
Last part of syscom control #, is for parts. N- NO replacement parts
answer
N
question
Unscheduled check
answer
U
question
YES there is replacement parts
answer
Y
question
Located in procedure block of MRC
answer
What is location of Warning, Caution, Notes on MRC ?
question
indicates death or injury
answer
Warning
question
indicates damage to equipment
answer
Caution
question
provides amplifying information
answer
Note
question
where maintenance person finds their maintenance checks
answer
13 week accountability log
question
Signs and dates when they finish
answer
What does the maintenance person do when done with their maintenance ?
question
The WCS, the LCPO, and the DIVO
answer
Who initials in the 13 week report at the beginning of the week and signs it at the end of the week after they review it ?
question
6
answer
How many annotations are on 13 week report ?
question
fully accomplished
answer
X
question
Delete mark (line)
answer
--------------
question
Rescheduled (circle with arrow)
answer
0 WITH ARROW
question
Convenience Related Maintenance
answer
( )
question
Mandatory Related Maintenance
answer
#
question
Authorizing Officer
answer
Who do you contact in case of issues with tagout, such as tags lying on deck or if you find tags that are ripped ?
question
caution "special temporary instructions"
answer
yellow
question
danger used to prohibit equipment operation, prevent personnel injury or damage to equipment from starting from all locations (ie push buttons )
answer
red
question
3 steps (2 a's first and c last) 1. authorizing officer signs 2. person attaching/ hanging tags signs 3. person checking tags signs
answer
tag out procedure order
question
Test equip. that meets or exceeds standards WHICH ALSO includes common hand tools and basic housekeeping items
answer
Things we can substitute
question
inactive equipment maintenance (this is for when equipment won't be used such as a yard period.
answer
IEM
question
Status 1 and Status 2
answer
2 types of IEM
question
the equipment won't be operated for 7 days or longer and IS NOT schedules for Corrective maintenance, overhaul, or, removal
answer
Status 1
question
the equipment won't be operated for 7 days or longer and IS directly subject to corrective maintenance, overhaul, or, removal
answer
Status 2
question
safetyy aboard ship
answer
OPNAVINST 5100.19E
question
basic safety
answer
Chapter 1 E
question
electrical tag out
answer
Chapter 9 E
question
machinery
answer
Chapter 13 E
question
hazmat
answer
Chapter 23 E
question
Hazardous material user's guide for using hazmat aboard the ship (670)
answer
NSTM 670
question
the ship's maintenance manual (8C)
answer
NAVSEAINST 4790.8C
question
Feedback report- used when something with your PMS documents are incorrect, 3 TYPES
answer
FBR
question
(non-technical) small changes like updating LOEP
answer
Category A of FBR
question
(techincal) inhibits PMS performance such as incorrect steps on MRC
answer
Category B OF FBR
question
dealing with personnel safety, damage to ship or equipment
answer
Urgent
question
4 digit code that groups test equipment
answer
SCAT
question
location guide list that shows where equipment is located
answer
LGL
question
Nomenclature, Serial Number, Location
answer
things you must verify on LGL ;
question
current ships maintenance project
answer
CSMP
question
standard PMS item name- this number in the brackets used to identify different tools, parts, and materials, on the MRC
answer
SPIN
question
standard pms material identification guide- this will list all the info for different parts including SPIN, nomenclature, and the NIIN.
answer
SPMIG
question
Maintenance action form, same thing as writing a job
answer
4790/2K
question
Supplemental form used to provide drawings/amplifying info when submitting a job
answer
4790/2L
question
configuration change form- used to report completion of alterations or maintenance that resulted in a configuration change
answer
4790/CK
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New