question
B
answer
1. Systems development typically starts with a ____. a. feasibility study, followed by a systems request, which includes a preliminary investigation b. systems request, followed by a preliminary investigation, which includes a feasibility study c. preliminary investigation, followed by a feasibility study, which includes a systems request d. feasibility study, followed by a preliminary investigation, which includes a systems request
question
C
answer
2. ____ planning is the process of identifying long-term organizational goals, strategies, and resources. a. Opportunity c. Strategic b. Preliminary d. Vertical
question
D
answer
3. During strategic planning, top managers ask a series of questions that is called a ____ analysis because it examines a company's strengths, weaknesses, opportunities, and threats. a. CRM c. JIT b. TCO d. SWOT
question
D
answer
4. Strategic planning starts with a ____ that reflects the firm's vision, purpose, and values.. a. Relationship Diagram b. Feasibility Study c. Performance Assessment d. Mission Statement
question
D
answer
5. ____ limitations result when a system that was designed for a specific hardware configuration becomes obsolete when new hardware is introduced. a. Mission b. Relationship c. Feasibility d. Performance
question
D
answer
6. Hardware-based security controls include ____. a. passwords b. various levels of user access c. coding data d. none of the above
question
B
answer
7. ____ components can provide automated response to sales inquiries, Web-based order processing, and online inventory tracking. a. Mission statement b. Customer relationship management (CRM) c. Feasibility study d. Total cost of ownership (TCO)
question
C
answer
8. Electronic data interchange (EDI) enables ____ inventory systems, which rely on computer-to-computer data exchange to minimize unnecessary inventory. a. CRM c. JIT b. TCO d. RFID
question
A
answer
9. Many companies implement ____ systems that integrate all customer-related events and transactions. a. CRM c. JIT b. TCO d. RFID
question
A
answer
10. A systems request form should ____. a. have clear instructions b. be difficult to understand c. not include enough space for all required information d. not indicate what supporting documents are needed
question
D
answer
11. IT Departments today ____ . a. only consult users if they want input b. handle all aspects of systems development c. are not closely linked to management d. are more team-oriented
question
B
answer
12. When evaluating systems requests, which of the following is an advantage of a systems review committee ____. a. action on requests must wait until the committee meets b. one person's bias is less likely to affect the decisions c. members might favor projects requested by their own departments d. internal political differences could delay important decisions
question
A
answer
13. A feasibility study includes tests for ____ feasibility, which means that a proposed system will be used effectively after it has been developed. a. operational c. schedule b. technical d. economic
question
B
answer
14. A feasibility study includes tests for ____ feasibility, which refers to the practical resources needed to develop, purchase, install, or operate the system. a. operational c. schedule b. technical d. economic
question
B
answer
15. The estimated costs of a proposed system usually are considered the ____, which includes ongoing support and maintenance costs, as well as acquisition costs. a. CRM c. JIT b. TCO d. RFID
question
A
answer
16. A feasibility study includes tests for ____ feasibility, which means that the projected benefits of the proposed system outweigh the estimated costs. a. economic c. operational b. schedule d. technical
question
A
answer
17. A(n) ____ is an example of an intangible benefit. a. user-friendly system that improves employee job satisfaction b. new scheduling system that reduces overtime c. online package tracking system that decreases the need for clerical staff d. sophisticated inventory control system that cuts excess inventory
question
D
answer
18. An example of a tangible benefit includes a(n) ____. a. user-friendly system that improves employee job satisfaction b. sales tracking system that supplies better information for marketing decisions c. new Web site that enhances the company's image d. online package tracking system that decreases the need for clerical staff
question
D
answer
19. When setting priorities for systems requests, the highest priority goes to projects that provide the ____. a. least benefit, at the highest cost, in the longest period of time b. least benefit, at the lowest cost, in the longest period of time c. greatest benefit, at the highest cost, in the shortest period of time d. greatest benefit, at the lowest cost, in the shortest period of time
question
D
answer
20. Of the measures of feasibility in the accompanying figure, ____ considers questions such as "Does management support the project?" and "Will the new system require training for users?" a. schedule feasibility b. technical feasibility c. economic feasibility d. operational feasibility
question
B
answer
21. Of the measures of feasibility in the accompanying figure, ____ considers points such as "Does the proposed platform have sufficient capacity for future needs?" and "Will the hardware and software environment be reliable?" a. schedule feasibility b. technical feasibility c. economic feasibility d. operational feasibility
question
C
answer
22. Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs. a. schedule feasibility b. technical feasibility c. economic feasibility d. operational feasibility
question
A
answer
23. Of the measures of feasibility in the accompanying figure, issues that relate to ____ include "Has management established a firm timetable for the project?" and "Will a project manager be appointed?" a. schedule feasibility b. technical feasibility c. economic feasibility d. operational feasibility
question
D
answer
24. When assessing priorities for systems requests, a systems analyst should look for a high score in which of the following ____. a. Will the proposed system diminish customer service? b. Will the proposed system increase costs? c. Will the proposed system result in less information for the organization? d. Will the proposed system increase revenue for the company?
question
A
answer
25. ____ is an example of a discretionary project. a. Creating a new report for a user b. Adding a report required by a new federal law c. Including annual updates to payroll and tax percentages d. Including quarterly changes in insurance reporting required by law
question
A
answer
26. Projects where management has a choice in implementing them are called ____ projects. a. discretionary b. nondiscretionary c. appended d. concatenated
question
B
answer
27. Projects where management has no choice in implementing them are called ____ projects. a. discretionary b. nondiscretionary c. appended d. concatenated
question
A
answer
28. A systems analyst conducts a(n) ____ investigation to study the systems request and recommend specific action. a. preliminary b. appendix c. systems d. transitional
question
B
answer
29. A popular technique for investigating causes and effects is called a ____ diagram, which is an analysis tool that represents the possible causes of a problem as a graphical outline. a. wishbone c. jawbone b. fishbone d. crossbones
question
B
answer
30. When using a ____ diagram to investigate causes of a problem, an analyst first states the problem and then draws a main bone with sub-bones that represent possible causes of the problem. a. wishbone c. jawbone b. fishbone d. crossbones
question
C
answer
31. To avoid the problem of project creep, ____. a. define project scope as vaguely as possible b. leave project scope undefined c. define project scope as clearly as possible d. expand the focus beyond the problem at hand
question
C
answer
32. Determining the project ____ means to define the boundaries, or extent, of a project — being as specific as possible. a. index c. scope b. matrix d. estimation
question
B
answer
33. Projects with very general scope definitions are at risk of expanding gradually, without specific authorization, in a process called project ____. a. dilation c. expansion b. creep d. drift
question
B
answer
34. A(n) ____ is a requirement or condition that a system must satisfy or an outcome that a system must achieve. a. condition c. impediment b. constraint d. obstacle
question
B
answer
35. The primary method of obtaining information during the preliminary investigation is to ____. a. analyze organization charts b. conduct interviews c. review documentation d. observe operations
question
A
answer
36. In sequence, the interviewing process involves a series of steps: ____, conduct the interview, document the interview, and evaluate the interview. a. determine the people to interview, establish objectives for the interview, develop interview questions, prepare for the interview b. establish objectives for the interview, develop interview questions, prepare for the interview, determine the people to interview c. develop interview questions, prepare for the interview, determine the people to interview, establish objectives for the interview d. prepare for the interview, determine the people to interview, establish objectives for the interview, develop interview questions
question
C
answer
37. A survey is ____, generally takes less time, and can involve a broad cross-section of people. a. more flexible than a series of interviews, and it is less expensive b. more flexible than a series of interviews, but it is more expensive c. not as flexible as a series of interviews, but it is less expensive d. not as flexible as a series of interviews, and it is more expensive
question
D
answer
38. A(n) _____, sometimes called a(n) _____, is another problem-solving tool often used by an analyst to look for a correlation between two variables.. a. Gantt chart, work breakdown structure b. Fishbone diagram, Ishikawa diagram c. Pareto chart, vertical bar graph d. XY chart, scatter diagram
question
A
answer
39. In a preliminary investigation report, the ____ contain(s) a brief description of the system, the name of the person or group performing the investigation, and the name of the person or group who initiated the investigation. a. introduction b. systems request summary c. expected benefits d. time and costs estimates
question
D
answer
40. In the preliminary investigation report, the ____ section contains the results of the preliminary investigation, including a description of the project's scope, constraints, and feasibility. a. appendix c. case for action b. introduction d. findings