question
Wheeled Coach obtains competitive advantage through MRP in part because of their excellent record integrity and insistence on record accuracy.
answer
True (Global company profile)
question
MRP is generally practiced on items with dependent demand.
answer
True (Dependent demand)
question
Reduced inventory levels and faster response to market changes are both benefits of MRP.
answer
True (Introduction)
question
A dependent demand item is so called because its demand is dependent on customer preferences.
answer
False (Dependent demand)
question
The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.
answer
True (Dependent demand)
question
Since MRP is quite detailed in nature, it has no influence on the longer-range, less detailed aggregate planning.
answer
False (Dependent inventory model requirements)
question
The master production schedule is a forecast of demand for families of products.
answer
False (Dependent inventory model requirements)
question
Lead times, inventory availability, and purchase orders outstanding are among the five things operations managers must know for effective use of MRP.
answer
True (Dependent inventory model requirements)
question
A bill of material lists all components, ingredients, and materials needed to produce one unit of an end item.
answer
True (Dependent inventory model requirements)
question
"Phantom bills" are bills of material for subassemblies that do not exist in reality.
answer
False (Dependent inventory model requirements)
question
Planning bills of material are bills of material for "kits" of inexpensive items such as washers, nuts, and bolts.
answer
True (Dependent inventory model requirements)
question
The Aggregate Plan, derived from the Master Production Schedule, specifies in more detail how much of which products is to be made at what times.
answer
False (Dependent inventory model requirements)
question
The time phased product structure, unlike the bill of material, adds the concept of lead times.
answer
True (Dependent inventory model requirements)
question
If X consists of one A and one B, and each A consists of one F and two Gs, then A is the "parent" component of G.
answer
True (Dependent inventory model requirements)
question
If 100 units of Q are needed and 10 are already in stock, then the gross requirement is 100 and the net requirement is 90.
answer
True (MRP structure)
question
Gross material requirements do not take into account the amount of inventory on hand.
answer
True (MRP structure)
question
In MRP, a "bucket" refers to a fixed order quantity, such as an EOQ.
answer
False (MRP structure)
question
Time fences divide that segment of the MPS that can be revised from that section that is "frozen."
answer
True (MRP management)
question
MRP is an excellent tool for scheduling products with variable lead times.
answer
False (MRP management)
question
Finite capacity scheduling, unlike MRP, recognizes the capacity limitations of departments and machines when building schedules.
answer
True (MRP management)
question
If parts and subassemblies common to a variety of products are managed through the supermarket concept, formal order releases for such parts are not necessary.
answer
True (MRP management)
question
The lot-for-lot lot-sizing technique is particularly appropriate when demand is not very smooth and set up cost is small compared to holding cost.
answer
True (Lot-sizing techniques)
question
In general, the lot-for-lot approach should be used whenever economical.
answer
True (Lot-sizing techniques)
question
The economic part period is a fraction of a time bucket.
answer
False (Lot-sizing techniques)
question
The Wagner-Whitin algorithm is the most widely used MRP lot-sizing technique.
answer
False (Lot-sizing techniques)
question
MRP can be effective only if very accurate lot sizes are calculated in advance.
answer
False (Lot-sizing techniques)
question
Smoothing a resource requirements profile to stay within capacity limits may increase setup costs.
answer
True (Extensions of MRP)
question
Closed-loop MRP systems allow production planners to move work between time periods to smooth the load or to at least bring it within capacity.
answer
True (Extensions of MRP)
question
Operations splitting sends pieces to the next operation before the entire lot is completed on the previous operation.
answer
False (Extensions of MRP)
question
When safety stock is deemed absolutely necessary, the usual policy is to build it into the projected on-hand inventory of the MRP logic.
answer
True (MRP structure)
question
By convention, the top level in a bill of material is designated level 1.
answer
False (MRP structure)
question
DRP is a time-phased stock-replenishment plan for all levels of a distribution network.
answer
True (MRP in services)
question
While ERP may provide a strategic advantage over competitors, it is so complex that many companies cannot adjust to it.
answer
True (Enterprise resource planning (ERP)
question
Firms may discover that, rather than adapting ERP to the way they do business, they have to adapt the way they do business to accommodate the ERP software.
answer
True (Enterprise resource planning (ERP)
question
The supply chain systems that result from using ERP in the grocery industry are called efficient consumer response (ECR) systems.
answer
True (Enterprise resource planning (ERP)
question
Which of the following statements regarding Wheeled Coach is false? a. Wheeled Coach has found competitive advantage through MRP. b. Wheeled Coach builds ambulances in a repetitive process. c. Wheeled Coach's MRP system allowed the company to meet tight schedules, but caused inventory to rise. d. Wheeled Coach's MRP system maintains excellent record integrity. e. Low inventory and high quality are two positive outcomes of Wheeled Coach's use of MRP.
answer
c. Wheeled Coach's MRP system allowed the company to meet tight schedules, but caused inventory to rise.
question
Demand for a given item is said to be dependent if a. it originates from the external customer b. there is a deep bill of material c. the finished products are mostly services (rather than goods) d. there is a clearly identifiable parent e. the item has several children
answer
d. there is a clearly identifiable parent
question
The phrase "demand related to the demand for other products" describes a. a dependent variable b. dependent demand c. recursive demand d. regression analysis e. independent demand
answer
d. regression analysis
question
Dependent demand and independent demand items differ in that a. for any product, all components are dependent-demand items b. the need for independent-demand items is forecast c. the need for dependent-demand items is calculated d. All of the above are true. e. None of the above is true.
answer
d. All of the above are true.
question
A master production schedule specifies a. the raw materials required to complete the product b. what component is to be made, and when c. what product is to be made, and when d. the labor hours required for production e. the financial resources required for production
answer
c. what product is to be made, and when
question
The ______ is (are) the MRP input detailing which end items are to be produced, when they are needed, and in what quantities. a. master production schedule b. gross requirements c. inventory records d. assembly time chart e. bill of material
answer
a. master production schedule
question
A master production schedule contains information about a. quantities and required delivery dates of all subassemblies b. quantities and required delivery dates of final products c. inventory on hand for each subassembly d. inventory on hand for each final product e. scheduled receipts for each final product
answer
b. quantities and required delivery dates of final products
question
The aggregate plan gets input or feedback from which of the following areas? a. engineering b. finance, marketing, and human resources c. the master production schedule d. procurement, production, and general management e. all of the above
answer
e. all of the above
question
In continuous (make-to-stock) operations, the master production schedule is usually expressed in terms of a. end items b. modules c. kits d. customer orders e. warehouse orders
answer
a. end items
question
In job shop (make-to-order) operations, the master production schedule is usually expressed in a. end items b. modules c. kits d. customer orders e. warehouse orders
answer
d. customer orders
question
The following table is an example of a(n) Week 1 Week 2 Week 3 Week 4 Week 5 Clothes Washer 200 100 Clothes Dryer 300 100 100 100 Upright Freezer 200 500 a. aggregate plan b. load report c. master production schedule d. capacity plan e. inventory record
answer
c. master production schedule
question
A document calls for the production of 50 small garden tractors in week 1; 50 small garden tractors and 100 riding mowers in week 2; 100 riding mowers and 200 garden utility carts in week 3; and 100 riding mowers in week 4. This document is most likely a(n) a. net requirements document b. resource requirements profile c. aggregate plan d. master production schedule e. Wagner-Whitin finite capacity document
answer
d. master production schedule
question
The ______ is the input to material requirements planning which lists the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product. a. bill of material b. master production schedule c. inventory records d. assembly time chart e. net requirements chart
answer
a. bill of material
question
A bill of material lists the a. times needed to perform all phases of production b. production schedules for all products c. components, ingredients, and materials required to produce an item d. operations required to produce an item e. components, ingredients, materials, and assembly operations required to produce an item
answer
c. components, ingredients, and materials required to produce an item
question
Firms making many different final products use __________ to facilitate production scheduling. a. planning bills b. modular bills c. phantom bills d. overdue bills e. none of the above
answer
b. modular bills
question
A bill of material must be updated with the corrected dimensions of a part. The document that details this change is a(n) a. modular bill b. engineering change notice c. resource requirements profile d. lead time-offset product structure document e. planning bill
answer
b. engineering change notice
question
The bill of material contains information necessary to a. place an order to replenish the item b. calculate quantities on hand and on order c. convert net requirements into higher level gross requirements d. convert gross requirements into net requirements e. convert (explode) net requirements at one level into gross requirements at the next level
answer
e. convert (explode) net requirements at one level into gross requirements at the next level
question
Which of the following statements best compares modular bills and phantom bills? a. Both pertain to assemblies that are not inventoried. b. There is no difference between the two. c. Both pertain to assemblies that are inventoried. d. Modular bills are used for assemblies that are not inventoried, unlike phantom bills. e. Modular bills represent subassemblies that actually exist and are inventoried, while phantom bills represent subassemblies that exist only temporarily and are not inventoried.
answer
e. Modular bills represent subassemblies that actually exist and are inventoried, while phantom bills represent subassemblies that exist only temporarily and are not inventoried.
question
The minimum record accuracy required for successful MRP is approximately a. lower than 90% b. 90% c. 95% d. 97% e. 99%
answer
e. 99%
question
Given the following bill of material If the demand for product A is 50 units, what will be the gross requirement for component E? A B(2) C(3) D(1) C(1) D(1) D(1) E(2) F(1) G(2) a. 4 b. 100 c. 200 d. 250 e. 300
answer
e. 300
question
Given the following bill of material If the demand for product A is 50 units, what will be the gross requirement for component E? A B(1) | C(1) D(2) E(1) F(2) D(1) F(1) a. 50 b. 100 c. 150 d. 200 e. 300
answer
a. 50
question
When safety stock is deemed absolutely necessary, the usual policy is to build it into which category of the MRP logic? a. Gross Requirements b. Scheduled Receipts c. Projected On Hand d. Net Requirements e. Planned Order Receipts c (MRP structure, moderate)
answer
c. Projected On Hand
question
Given the following bill of material If the demand for product A is 30 units, and there are 10 units of B on hand and none of C, how many units of part D will be needed? A B(1) | C(1) D(2) E(1) F(2) D(1) F(1) a. 3 b. 40 c. 70 d. 90 e. 110
answer
c. 70
question
Low level coding means that a. a final item has only a few levels in the BOM structure b. it is the code for the lowest level in the BOM structure c. a component item is coded at the lowest level at which it appears in the BOM structure d. the top level of the BOM is below level zero and that BOMs are not organized around the finished product e. none of the above
answer
c. a component item is coded at the lowest level at which it appears in the BOM structure
question
Each X requires 2 of component Y; each Y requires 4 of part Z. The lead time for assembly of X is 1 week. The lead time for the manufacture of Y is 1 week. The lead time for the procurement of Z is 6 weeks. The cumulative lead time for X is _____ weeks. a. 6 b. 7 c. 8 d. 10 e. cannot be determined
answer
c. 8
question
A material requirements plan contains information with regard to all of the following except a. quantities and required delivery dates of all subassemblies b. quantities and required delivery dates of final products c. the capacity needed to provide the projected output rate d. inventory on hand for each final product e. inventory on hand for each subassembly
answer
c. the capacity needed to provide the projected output rate
question
Each R requires 2 of component S and 1 of part T. The lead time for assembly of R is 3 days. The lead time for the manufacture of S is 5 days. The lead time for the manufacture of T is 10 days. The cumulative lead time for R is _____ days. a. 6 b. 9 c. 13 d. 17 e. cannot be determined
answer
c. 13
question
Each R requires 4 of component S; each S requires 3 of part T. The lead time for assembly of R is 1 week. The lead time for the manufacture of S is 2 weeks. The lead time for the procurement of T is 6 weeks. The cumulative lead time for R is ______ weeks. a. 6 b. 9 c. 12 d. 18 e. 28
answer
b. 9
question
Which of the following best describes a gross material requirements plan? a. a schedule that shows total demand for an item, and when it must be ordered from a supplier or when production must be started b. an intermediate range plan for the scheduling of families of products c. a chart illustrating whether capacity has been exceeded d. a table that corrects scheduled quantities for inventory on hand e. a schedule showing which products are to be manufactured and in what quantities
answer
a. a schedule that shows total demand for an item, and when it must be ordered from a supplier or when production must be started
question
Which of the following statements regarding the gross material requirements plan is true? a. It shows total demand for an item. b. It shows when an item must be ordered from a supplier or when production must be started. c. It combines a master production schedule with the time-phased schedule. d. It requires several inputs, including an accurate bill of material. e. All of the above are true.
answer
e. All of the above are true.
question
The MPS calls for 110 units of Product M. There are currently 30 of Product M on hand. Each M requires 4 of Component N. There are 20 units of N on hand. The net requirements for N are a. 150 b. 170 c. 300 d. 320 e. 440
answer
e. 440
question
The MPS calls for 50 units of Product A and 60 of B. There are currently 25 of Product B on hand. Each A requires 2 of Part C; each B requires 5 of C. There are 160 units of C available. The net requirements for C are a. 115 b. 175 c. 240 d. 690 e. 700
answer
a. 115
question
The MPS calls for 110 units of Product A. There are currently 60 of Product A on hand. Each A requires 4 of Part B. There are 20 units of B available. The net requirements for B are a. 20 b. 120 c. 180 d. 240 e. 440
answer
c. 180
question
In MRP record calculations, the appearance of a negative value for the gross requirements of an end item in a specific time bucket a. signals the need to purchase that end item in that period b. implies that value was scheduled by the MPS c. signals the need for a negative planned order receipt in that period d. is impossible e. All of the above are true.
answer
d. is impossible
question
The number of units projected to be available at the end of each time period refers to a. net requirements b. scheduled receipts c. the projected usage of the item d. the amount projected to be on hand e. the amount necessary to cover a shortage
answer
d. the amount projected to be on hand
question
Linking a part requirement with the parent component that caused the requirement is referred to as a. net requirements planning b. a time fence c. pegging d. kanban e. leveling
answer
c. pegging
question
In MRP, system nervousness is caused by a. management's attempt to continually respond to minor changes in production requirements b. the use of the lot-for-lot approach c. management's marking part of the master production schedule as "not to be rescheduled" d. the use of phantom bills of material e. management's attempt to evaluate alternative plans before making a decision
answer
a. management's attempt to continually respond to minor changes in production requirements
question
One of the tools that is particularly useful in reducing the system nervousness in the MRP system is (are) a. modular bills b. time phasing c. time fences d. lot sizing e. closed loop system
answer
c. time fences
question
Distortion in MRP systems can be minimized when safety stock is held at the a. purchased component or raw material level b. work-in-process level c. finished goods level d. a and b e. a and c
answer
e. a and c
question
Material requirements plans specify a. the quantities of the product families that need to be produced b. the quantity and timing of planned order releases c. the capacity needed to provide the projected output rate d. the costs associated with alternative plans e. whether one should use phantom bills of material or not
answer
b. the quantity and timing of planned order releases
question
Which of the following best differentiates material requirements planning (MRP) from finite capacity scheduling (FCS)? a. FCS recognizes the finite nature of capacity while MRP does not. b. FCS works in services while MRP does not. c. MRP requires time buckets while FCS does not. d. FCS is an input into traditional MRP systems. e. FCS uses the Wagner-Whitin algorithm while MRP uses lot-for-lot and EOQ.
answer
a. FCS recognizes the finite nature of capacity while MRP does not.
question
Which of the following lot-sizing techniques results in the lowest holding costs? a. lot-for-lot b. EOQ c. part-period balancing d. Wagner-Whitin algorithm e. the quantity discount model
answer
a. lot-for-lot
question
Which of the following statements is true about the MRP plan when using lot-for-lot ordering? a. The quantity of gross requirements for a child item is always equal to the quantity of planned order releases for its parent. b. The quantity of gross requirements for a child item is equal to the quantity of planned order release(s) multiplied by the number of child items used in the parent assembly. c. The quantity of gross requirements for a child item is always equal to the quantity of gross requirements for its parent. d. The quantity and gross requirements for a child item is always equal to the quantity of net requirements for its parent. e. All of the above are true.
answer
b. The quantity of gross requirements for a child item is equal to the quantity of planned order release(s) multiplied by the number of child items used in the parent assembly.
question
What lot-sizing technique is generally preferred when inventory holding costs are extremely high? a. lot-for-lot b. EOQ c. part-period balancing d. the Wagner-Whitin algorithm e. All of the above are appropriate for the situation.
answer
a. lot-for-lot
question
For the lot-sizing technique known as lot-for-lot to be appropriate a. future demand should be known for several weeks b. setup cost should be relatively small c. annual volume should be rather low d. item unit cost should be relatively small e. the independent demand rate should be very stable
answer
b. setup cost should be relatively small
question
An item's holding cost is 60 cents per week. Each setup costs $120. Lead time is 2 weeks. EPP is a. .005 b. 60 c. 72 d. 100 e. 200
answer
e. 200
question
Which of the following statements regarding lot-sizing is true? a. EOQ principles should be followed whenever economical. b. Too much concern with lot-sizing results in false accuracy. c. Lot-for-lot cannot be modified for scrap allowance or process constraints. d. The Wagner-Whitin algorithm simplifies lot size calculations. e. All of the above are true.
answer
b. Too much concern with lot-sizing results in false accuracy.
question
3. A firm makes numerous models of mowers, garden tractors, and gasoline powered utility vehicles. Some assemblies and parts are common to many end items. To relieve the MPS of performing order releases on these common parts, the firm might choose to use the __________ technique. a. Wagner-Whitin b. economic part period c. supermarket d. gross material requirements e. resource requirements profile
answer
c. supermarket
question
Capacity planning in closed-loop MRP a. utilizes feedback about workload from each work center b. may make use of resource requirements profiles (load reports) c. may smooth work center loads with such tactics as overlapping and lot splitting d. does not add capacity, but rather seeks effective use of existing capacity e. All of the above are true.
answer
e. All of the above are true.
question
If a load report (resource requirements profile) shows a work center scheduled beyond capacity a. the company must add capacity by enlarging the facility b. the company must add capacity by such tactics as overtime and subcontracting c. the work center's load may be smoothed by such tactics as operations splitting or lot splitting d. the aggregate plan must be revised e. the Wagner-Whitin algorithm should be used to rebalance the load
answer
c. the work center's load may be smoothed by such tactics as operations splitting or lot splitting
question
MRP II is accurately described as a. MRP software designed for services b. MRP with a new set of computer programs that execute on microcomputers c. MRP augmented by other resource variables d. an enhancement of MRP that plans for all levels of the supply chain e. a new generation of MRP software that extends MRP to planning and scheduling functions
answer
c. MRP augmented by other resource variables
question
The extension of MRP which extends to resources such as labor hours and machine hours, as well as to order entry, purchasing, and direct interface with customers and suppliers is a. MRP II b. enterprise resource planning c. the master production schedule d. closed-loop MRP e. not yet technically possible
answer
b. enterprise resource planning
question
Which of the following statements regarding MRP in services is true? a. MRP is for manufacturing only, and is not applicable to services. b. MRP can be used in services, but only those that offer very limited customization. c. MRP does not work in services because there is no dependent demand. d. Services such as restaurant meals illustrate dependent demand, and require product structure trees, bills-of-material, and scheduling. e. None of the above is true.
answer
d. Services such as restaurant meals illustrate dependent demand, and require product structure trees, bills-of-material, and scheduling.
question
Distribution resource planning (DRP) is a. a transportation plan to ship materials to warehouses b. a time-phased stock replenishment plan for all levels of a distribution network c. a shipping plan from a central warehouse to retail warehouses d. material requirements planning with feedback loop from distribution centers e. a material requirements planning package used exclusively by warehouses
answer
b. a time-phased stock replenishment plan for all levels of a distribution network
question
By convention, the top level in a bill of material is a. level 0 b. level 1 c. level T d. level 10 e. level 100
answer
a. level 0
question
Enterprise resource planning (ERP) a. seldom requires software upgrade or enhancement b. does not integrate well with functional areas other than operations c. is inexpensive to implement d. automates and integrates the majority of business processes e. all of the above
answer
d. automates and integrates the majority of business processes
question
Enterprise resource planning (ERP) a. has been made possible because of advances in hardware and software b. uses client/server networks c. creates commonality of databases d. uses business application-programming interfaces (BAPI) to access their database e. All of the above are true of ERP.
answer
e. All of the above are true of ERP.
question
Which of the following is false concerning enterprise resource planning (ERP)? a. It attempts to automate and integrate the majority of business processes. b. It shares common data and practices across the enterprise. c. It is inexpensive to implement. d. It provides and accesses information in a real-time environment. e. All of the above are true.
answer
c. It is inexpensive to implement.
question
Which of the following regarding enterprise resource planning (ERP) is true? a. It involves an ongoing process for implementation. b. It can incorporate improved, reengineered "best processes." c. It has a software database that is off-the-shelf coding. d. ERP systems usually include MRP, financial and human resource information. e. All of the above are true.
answer
e. All of the above are true.
question
All of the following are advantages of enterprise resource planning (ERP) except it a. creates commonality of databases b. increases communications and collaboration worldwide c. helps integrate multiple sites and business units d. requires major changes in the company and its processes to implement e. can provide a strategic advantage over competitors
answer
d. requires major changes in the company and its processes to implement
question
TPS stands for Toyota Production System.
answer
True
question
TPS stands for Total Production Streamlining.
answer
False
question
Product storage is an example of waste, in the sense that no value is added.
answer
True
question
In a JIT system, product inspection adds value by identifying defective items.
answer
False
question
Customer demand will always remain an unknown, so it is not considered a source of variation.
answer
False
question
Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.
answer
True
question
A push system means providing the next station with exactly what is needed when it is needed.
answer
False
question
Waste is anything that does not add value, such as storage or inspection of items; waste also includes any activity that does not add value from the consumer's perspective.
answer
True
question
Increasing inventory exposes variability in production processes.
answer
False
question
JIT brings about competitive advantage by faster response to the customer regardless of cost.
answer
False
question
One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.
answer
True
question
Many suppliers feel that having a variety of customers is better than being tied to long-term contracts with one customer.
answer
True
question
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.
answer
True
question
Reducing distance is a common JIT goal.
answer
True
question
Cross-training is a common JIT tactic to improve flexibility.
answer
True
question
JIT systems carry inventory just in case something goes wrong.
answer
False
question
Hidden problems are generally uncovered during the process of reducing inventory.
answer
True
question
Lower average inventory is feasible only if setup times are short.
answer
True
question
If setup times and costs can be reduced enough, the JIT ideal of "Lot Size = 1" can be achieved.
answer
True
question
A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.
answer
True
question
The first step in reducing setup times is the separation of setup into preparation activities and actual setup, so that as much work as possible can be done while the machine or process is operating.
answer
True
question
Level scheduling means producing at a constant rate, regardless of customer demands.
answer
False
question
With level schedules, a few large batches, rather than frequent small batches, are processed.
answer
False
question
The number of kanbans decreases as safety stock is increased.
answer
False
question
A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.
answer
True
question
Inventory has only one positive aspect, which is availability; inventory has several negatives, including increased material handling, obsolescence, and damage.
answer
True
question
The quality management tool called poka-yoke is not relevant to JIT systems.
answer
False
question
Employee empowerment is unnecessary in the Toyota Production System, because automation and powerful information systems reduce the need for employee creativity and decision making.
answer
False
question
The Toyota Production System requires that activities have built-in, automatic tests so that gaps between expectations and actuality are immediately evident.
answer
True
question
The 5S's—sort/segregate, simplify/straighten, shine/sweep, standardize, and sustain/self discipline—are important to lean production because they act as a means to reduce waste.
answer
True
question
When implemented as a comprehensive manufacturing strategy, JIT, TPS, and lean systems sustain competitive advantage and result in increased overall returns.
answer
True
question
Because most services cannot be inventoried, there is little place for JIT to help service organizations achieve competitive advantage.
answer
False
question
What does TPS stand for? a. Total Production Streamlining b. Toyota Production System c. Taguchi's Production S's d. Total Process Simplification e. None of the above
answer
b. Toyota Production System
question
Which of the following is generally found in most JIT environments? a. a push or pull system, depending upon the rate of demand b. a push system for high margin items and a pull system for low margin items c. a push system for purchased parts and a pull system for manufactured parts d. push systems e. pull systems
answer
e. pull systems
question
Which one of the following is not a benefit of the implementation of JIT? a. cost reduction b. variability increase c. rapid throughput d. quality improvement e. rework reduction
answer
b. variability increase
question
Which of the following is not a reason for variability? a. Employees, machines, and suppliers produce units late. b. Customer demand is unknown. c. Employees, machines, and suppliers produce units that conform to standards. d. Engineering drawings are inaccurate. e. Drawings or specifications are incomplete.
answer
c. Employees, machines, and suppliers produce units that conform to standards.
question
Which of the following is specifically characterized by a focus on continuous improvement, respect for people, and standard work practices? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban
answer
b. Toyota Production System (TPS)
question
Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban
answer
a. Just-in-time (JIT)
question
Which of the following statements regarding a pull system is )#$%? a. Large lots are pulled from upstream stations. b. Work is pulled to the downstream stations before it is actually needed. c. Manufacturing cycle time is increased. d. Problems become more obvious. e. None of the above is true of a pull system.
answer
d. Problems become more obvious.
question
Manufacturing cycle time is best defined as the a. length of the work shift, expressed in minutes per day b. time it takes a unit to move from one workstation to the next c. time between the start of one unit and the start of the next unit d. sum of all the task times to make one unit of a product e. time from raw materials receipt to finished product exit
answer
e. time from raw materials receipt to finished product exit
question
If the goals of JIT partnerships are met, which of the following is a result? a. For incoming goods, receiving activity and inspection are outsourced. b. In-transit inventory falls as suppliers are located closer to facilities. c. The number of suppliers increases. d. In-plant inventory replaces in-transit inventory. e. All of the above are consequences of meeting the JIT partnership goals.
answer
b. In-transit inventory falls as suppliers are located closer to facilities.
question
Which one of the following is a characteristic of a JIT partnership? a. large number of suppliers b. maximal product specifications imposed on supplier c. active pursuit of vertical integration d. removal of incoming inspection e. frequent deliveries in large lot quantities
answer
d. removal of incoming inspection
question
Which of the following is specifically characterized by the elimination of waste through a focus on exactly what the customer wants? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban
answer
c. Lean operations
question
Characteristics of JIT partnerships with respect to suppliers include a. competitive bidding encouraged b. buyer plant pursues vertical integration to reduce the number of suppliers c. support suppliers so they become or remain price competitive d. most suppliers at considerable distance from purchasing organization e. All of the above are characteristics of JIT partnerships.
answer
c. support suppliers so they become or remain price competitive
question
Characteristics of just-in-time partnerships do ,0) include a. removal of in-transit inventory b. large lot sizes to save on setup costs and to gain quantity discounts c. long-term contracts d. few suppliers e. buyer helps supplier to meet the quality requirements
answer
b. large lot sizes to save on setup costs and to gain quantity discounts
question
What is the time required to move orders through the production process, from receipt to delivery? a. throughput b. manufacturing cycle time c. pull time d. push time e. queuing time
answer
a. throughput
question
Which of the following is ,0) a goal of JIT partnerships? a. removal of unnecessary activities b. removal of in-plant inventory c. removal of in-transit inventory d. removal of engineering changes e. All of the above are goals of JIT partnerships.
answer
d. removal of engineering changes
question
A characteristic of JIT partnerships with respect to quality is to a. help suppliers meet quality requirement b. inspect all incoming parts c. maintain a steady output rate d. impose maximum product specifications on the supplier e. draw up strict contracts ensuring that all defectives will be immediately replaced
answer
a. help suppliers meet quality requirement
question
Which of the following is not a goal of JIT partnerships? a. removal of unnecessary activities b. removal of in-plant inventory c. removal of in-transit inventory d. obtain improved quality and reliability e. All of the above are goals of JIT partnerships.
answer
e. All of the above are goals of JIT partnerships.
question
Which one of the following is a concern expressed by suppliers? a. elimination of in-plant inventory b. delivery to the point of use c. production with zero defects d. large lot sizes e. customers' infrequent engineering changes
answer
c. production with zero defects
question
Reduction of in-transit inventory can be encouraged through use of a. supplier location near plants b. low setup costs c. low carrying costs d. use of trains, not trucks e. low-cost, global suppliers
answer
a. supplier location near plants
question
In JIT partnerships, suppliers have several concerns. Which of the following is ,0)!such a concern? a. desire for diversification b. poor customer scheduling c. small lot sizes d. producing high enough quality levels e. customers' infrequent engineering changes
answer
e. customers' infrequent engineering changes
question
Which of the following is ,0)!a concern of suppliers as they prepare to enter into JIT partnerships? a. Suppliers feel that they would be less at risk if they contracted with more than one customer. b. Suppliers are concerned that customers will present frequent engineering changes with inadequate lead time to deal with them. c. Suppliers feel that their processes are suited for larger lot sizes than the customer wants. d. Suppliers are concerned that frequent delivery of small quantities is economically prohibitive. e. All of the above represent JIT supplier concerns.
answer
e. All of the above represent JIT supplier concerns.
question
Just-in-time systems make demands on layouts, including a. distance reduction b. increased flexibility c. reduced space and inventory d. cross-trained, flexible employees e. All of the above are JIT influences on layout.
answer
e. All of the above are JIT influences on layout.
question
Which one of the following is not a layout tactic in a JIT environment? a. work cells for families of products b. fixed equipment c. minimizing distance d. little space for inventory e. poka-yoke devices
answer
b. fixed equipment
question
Which of the following is the author of the phrase "Inventory is evil"? a. Poka Yoke b. Pat "Keiretsu" Morita c. Kanban Polka d. Shigeo Shingo e. none of the above
answer
d. Shigeo Shingo
question
Which one of the following statements is true regarding JIT inventory? a. It exists just in case something goes wrong. b. It is the minimum inventory necessary to keep a perfect system running. c. It hides variability. d. It is minimized with large lot production. e. It increases if setup costs decrease.
answer
b. It is the minimum inventory necessary to keep a perfect system running.
question
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: 60 Annual demand: 40,000 Holding cost: $20 per unit per year Daily production rate: 320 Work days per year: 250 a. $0.45 b. $4.50 c. $45 d. $450 e. $500
answer
a. $0.45
question
A product has annual demand of 100,000 units. The plant manager wants production to follow a four-hour cycle. Based on the following data, what setup cost will enable the desired production cycle? d=400 per day (250 days per year), p=4000 units per day, H=$40 per unit per year, and Q=200 (demand for four hours, half a day). a. $2.00 b. $7.20 c. $18.00 d. $64.00 e. $1,036.80
answer
b. $7.20
question
Throughput measures the time a. that it takes to process one unit at a station b. between the arrival of raw materials and the shipping of finished products c. to produce one whole product through an empty system (i.e., with no waiting) d. required to move orders through the production process, from receipt to delivery e. none of the above
answer
d. required to move orders through the production process, from receipt to delivery
question
Which of the following is true regarding the steps to reducing setup times? a. The first step involves performing as much setup preparation as possible while the process/machine is operating. b. The cycle of steps is repeated until setup time is reduced to under a minute. c. Standardize tooling and standardize training are included in the same step. d. Improved material handling and move material closer are done before operator training. e. All of the above are true.
answer
e. All of the above are true.
question
Factory X is trying to use level use scheduling. If their first target were to cut the current lot size in half, by what proportion must setup cost change? a. Setup cost must be cut to one fourth its current value. b. Setup cost must also be cut in half from its current value. c. Setup cost must double from its current value. d. cannot be determined e. none of the above
answer
a. Setup cost must be cut to one fourth its current value.
question
The technique known as level schedules a. requires that schedules be met without variation b. processes many small batches rather than one large one c. is known as "jelly bean" scheduling d. is based on meeting one day's demand with that day's production e. All of the above are true regarding level scheduling.
answer
e. All of the above are true regarding level scheduling.
question
Which one of the following statements is true about the kanban system? a. The quantities in the containers are usually large to reduce setup costs. b. It is associated with a push system. c. It is useful to smooth operations when numerous quality problems occur. d. The supplier workstation signals the customer workstation as soon as a batch is completed. e. The customer workstation signals to the supplier workstation when production is needed.
answer
e. The customer workstation signals to the supplier workstation when production is needed.
question
Kanban is associated with all of the following except a. small lot sizes b. signals, such as cards, lights, or flags c. moving inventory only as needed d. increased material handling e. reductions in inventory
answer
d. increased material handling
question
The word "kanban" means a. low inventory b. employee empowerment c. card d. continuous improvement e. lot size of one
answer
c. card
question
Which one of the following scenarios represents the use of a kanban to reduce inventories? a. A supervisor tells the operators to stay busy and start producing parts for next month. b. A "supplier" work center signals the downstream workstation that a batch has been completed. c. A supervisor signals to several work centers that the production rate should be changed. d. A "customer" work center signals to the "supplier" workstation that more parts are needed. e. An operator asks the next station's operator to help him fix his machine.
answer
d. A "customer" work center signals to the "supplier" workstation that more parts are needed.
question
If a casual-dining restaurant is attempting to practice JIT and lean operations, which of the following would ,0) be present? a. close relationship with the restaurant's suppliers of food, utensils, and equipment b. food preparation in large batches c. a kitchen set up to minimize wasteful movements d. lean inventories of food e. All of the above should be present.
answer
b. food preparation in large batches
question
The number of kanbans is a. one b. the ratio of the reorder point to container size c. the same as EOQ d. one full day's production e. none of the above
answer
b. the ratio of the reorder point to container size
question
Which of the following is false regarding the links between JIT and quality? a. Inventory hides bad quality; JIT immediately exposes it. b. JIT reduces the number of potential sources of error by shrinking queues and lead times. c. As quality improves, fewer inventory buffers are needed; in turn, JIT performs better. d. If consistent quality exists, JIT allows firms to reduce all costs associated with inventory. e. All of the above are true.
answer
e. All of the above are true.
question
Which of the following is an illustration of employee empowerment? a. UPS drivers are trained to perform several motions smoothly and efficiently. b. Unionization of the work place brings better morale and therefore better quality. c. "No one knows the job better than those who do it." d. all of the above e. none of the above
answer
c. "No one knows the job better than those who do it."
question
Which of the following is ,0) an attribute of lean operators? a. eliminating almost all inventory through just-in-time techniques b. minimizing space requirements by reducing the distance a part travels c. pushing responsibility to the highest level possible through centralized decision making d. educating suppliers to accept responsibility for helping meet customer needs e. All of the above are attributes of lean producers.
answer
c. pushing responsibility to the highest level possible through centralized decision making
question
The 5S's a. have the "flavor" of a housekeeping list b. are a checklist for lean operations c. have become a list of seven items in American practice d. can be used to assist with necessary changes in organizational culture e. All of these are true.
answer
e. All of these are true.
question
The list of 5S's, although it looks like a housekeeping directive, supports lean production by a. identifying non-value items and removing them, in the "sort/segregate" item b. reducing inventory, in the "standardize" item c. increasing variability through standardized procedures, in the "standardize" item d. eliminating wasted motion through ergonomic studies, in the "support" item e. building good safety practices, in the "shine/sweep" item
answer
a. identifying non-value items and removing them, in the "sort/segregate" item
question
In the quest for competitive advantage, which of the following is a JIT requirement? a. small number of job classifications b. reduced number of vendors c. reduced space for inventory d. quality by suppliers e. All of the above are JIT requirements.
answer
e. All of the above are JIT requirements.
question
Which one of the following does not exemplify JIT used for competitive advantage? a. Acme Foods decides to decrease the number of its suppliers to just a few. b. Ajax, Inc. is proud to announce that incoming goods are delivered directly to the point of use. c. Ardoyne Builders has a scheduled preventive maintenance program. d. Cheramie Trucking trains workers to specialize and become very efficient in one job. e. Cajun Contractors has reduced the amount of space for inventory.
answer
d. Cheramie Trucking trains workers to specialize and become very efficient in one job.
question
Which one of the following is ,0) a requirement of JIT systems? a. quality deliveries on time b. low setup time c. training support d. strong job specialization e. employee empowerment
answer
d. strong job specialization
question
Great Lakes Barge and Baggage Company makes, among other things, battery-operated bilge pumps. Which of the following activities is ,0) part of JIT? They a. communicate their schedules to suppliers b. produce in long production runs to reduce the impact of setup costs c. use a pull system to move inventory d. continuously work on reducing setup time e. produce in small lots
answer
b. produce in long production runs to reduce the impact of setup costs
question
Which one of the following is an example of JIT being used for competitive advantage? a. Jones Company has decreased the number of job classifications to just a few. b. Lafourche Metals increases the number of its suppliers to be less dependent on just a few. c. Houma Fabricators is proud to announce that incoming goods are inspected. d. Acme Company tells its maintenance department to intervene only if a machine breaks down. e. Caro Specialty Metals, Inc. has built a new, huge warehouse to store inventory.
answer
a. Jones Company has decreased the number of job classifications to just a few.
question
A manufacturer took the following actions to reduce inventory. Which of these is generally not accepted as a JIT action? a. It used a pull system to move inventory. b. It produced in ever smaller lots. c. It required deliveries directly to the point of use. d. It picked the supplier that offered the lowest price based on quantity discounts. e. It worked to reduce the company's in-transit inventory.
answer
d. It picked the supplier that offered the lowest price based on quantity discounts.
question
Which of the following is not one of the Seven Wastes? a. overproduction b. transportation c. assignment d. defective product e. motion
answer
c. assignment
question
Concerning relationships with suppliers, which of the following combinations is critical to the success of JIT? a. close relationships with trust b. close relationships with skepticism c. distant relationships with trust d. distant relationships with skepticism e. none of the above
answer
a. close relationships with trust
question
Which of the following statements regarding JIT in services is true? a. Restaurants do not use JIT layouts because they interfere with creation of a good servicescape. b. Excess customer demand in services such as air travel is met by dipping into safety stocks. c. All of the JIT techniques for dealing with suppliers, layout, inventory, and scheduling are used in services. d. Scheduling is not relevant to effective use of JIT in services. e. All of the above are false.
answer
c. All of the JIT techniques for dealing with suppliers, layout, inventory, and scheduling are used in services.