Capacity can be defined as the ability to hold, receive, store, or accommodate.
answer
True
question
When evaluating capacity, managers need to consider both resource inputs and product outputs.
answer
True
question
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
answer
True
question
The capacity utilization rate is found by dividing best operating level by capacity used
answer
False
question
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
answer
False
question
Best operating level is the volume of output at which average unit cost is minimized.
answer
True
question
At some point, the size of a growing plant can become too large and diseconomies of scale become a capacity planning problem.
answer
True
question
Long-range capacity planning requires top management participation.
answer
True
question
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
answer
False
question
Capacity planning is generally viewed in three time durations: Immediate, Intermediate and Indeterminate.
answer
False
question
A production facility works best when it focuses on a fairly limited set of production objectives.
answer
True
question
The ultimate in plant flexibility is a one-hour-changeover time plant.
answer
False, zero-hour-changeover
question
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
answer
True
question
Outsourcing is a common source of external capacity.
answer
True
question
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
answer
False
question
Low rates of capacity utilization in service organizations are never appropriate.
answer
False
question
The smaller the capacity cushion the better.
answer
False
question
Because services cannot be stored for later use, service managers consider time as one of their supplies or resources.
answer
True
question
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as: Economies of shipping Economies of scope Economies of scale Economies of shape Economies of size
answer
Economies of scope
question
Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons? Short range Upcoming Long range Current Intermediate range
answer
Intermediate Range
question
Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons? Short-range Upcoming Current Long-range Intermediate-range
answer
Long-range
question
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity utilization rate? 300 1.33 0.75 1.00 2.33
answer
0.75
question
If the actual output of a piece of equipment during an hour is 500 units and it's best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate? 1.33 100 1.25 0.75 1.00
answer
1.25
question
When deciding to add capacity to a factory which of the following need not be considered? Use of external capacity Maintaining system balance Immediate product demand Availability of raw materials The frequency of capacity additions
answer
Immediate product demand
question
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations? Demand volatility Time Utilization impacts service All of the above Location
answer
All of the above
question
Resource Planning is a top management planning activity owned by top management. It is typically prepared for them by others in the organization but reviewed and approved by top management.
answer
True
question
RCCP (Rough Cut Capacity Planning) is a top management planning process.
answer
False
question
Detailed Capacity Planning and CRP (Capacity Requirements Planning) are basically the same process.
answer
True
question
The levels of Capacity Planning as they line up with the ERP business model (top to bottom) are: Strategic Planning, Rough Cut Capacity Planning, Resource Planning, CRP Strategic Planning, Resource Planning, Rough Cut Capacity Planning, CRP Strategic Planning, Rough Cut Capacity Planning, Detailed Capacity Planning Rough Cut Capacity Planning, Capacity Requirements Planning, Resource Planning, Detailed Capacity Planning
answer
Strategic Planning, Resource Planning, Rough Cut Capacity Planning, CRP