question
when the bottlenecks need work
answer
Work should be released into the system:
question
setup time
answer
The time required to change a machine from making one product or service to the next is called:
question
A TOC analyst would not be concerned with setup times on non-bottleneck machines
answer
Which of the following statements regarding setups is TRUE?
question
Utilization and activation of a resource are not the same
answer
Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology?
question
Do not balance capacity, balance the flow
answer
Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology?
question
Identify system constraints
answer
Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints?
question
Net profit
answer
According to the theory of constraints which of the following is a financial measurement that can be used to measure the firm's ability to make money?
question
An employee
answer
According to the theory of constraints which of the following can be a CCR?
question
Keep a buffer inventory in front of it to insure that it always has something to work on
answer
Which of the following is an approach to dealing with a bottleneck?
question
Bottleneck or CCR
answer
What is a word indicating a resource whose capacity is less than the demand placed on it?
question
Throughput
answer
What is the rate at which money is generated by the system through sales called?
question
Cash flow
answer
According to the theory of constraints, which of the following is a financial measure that can be used to measure the firm's ability to make money?
question
Throughput
answer
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?
question
Inventory
answer
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?
question
An employee
answer
According to the theory of constraints, which of the following can be a CCR?
question
Idle time
answer
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?
question
Process time
answer
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?
question
File
answer
Which of the following is not an important concept in TOC?
question
Research and development
answer
A useful measure of inventory performance is called "dollar days." In which of the following areas are dollar days measurements not useful?
question
JIT does not allow very much flexibility in the products produced
answer
Which of the following is a negative aspect of JIT compared to synchronous manufacturing?
question
All managers should understand the basic principles that guide the design of transformation processes
answer
A reason for studying operations management (OSM) is which of the following?
question
Pure goods, core goods, core services, pure services
answer
The Goods-Services Continuum consists of which set of the following categories?
question
Data storage systems
answer
Which of the following are defined as core goods?
question
Increasing global servitization networks
answer
Current issues in OSM do not include:
question
Hospital administrator
answer
Which of the following are not listed in the text as jobs in OSM?
question
Service jobs are unskilled
answer
Which of the following is not a characteristic that distinguishes services from goods?
question
Selecting
answer
Which of the following is not a way that operations and supply processes are categorized?
question
Facilitating goods
answer
One of the package of features that make up a service are:
question
Sustainability
answer
The ability to maintain balance in a system is referred to as:
question
Operations
answer
Processes that are used to transform the resources into products are called:
question
Efficiency
answer
Doing something at the lowest possible cost is called:
question
Quality; price paid
answer
Value is the ratio of ____ to ____
question
Supply network
answer
A pipeline through which material and information flows is a conception of a:
question
Variance
answer
In time series data depicting demand which of the following is not considered a component of demand variation?
question
Force field analysis
answer
Which of the following is not one of the basic types of forecasting?
question
Past demand
answer
In most cases, demand for products or services can be broken into several components. Which of the following is not considered a component of demand?
question
Cyclical elements
answer
In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
question
Autocorrelation
answer
In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
question
Market research
answer
Which of the following forecasting methodologies is considered a qualitative forecasting technique?
question
Simple moving average
answer
Which of the following forecasting methodologies is considered a time series forecasting technique?
question
Weighted moving average
answer
Which of the following forecasting methodologies is considered a time series forecasting technique?
question
Liner regression
answer
Which of the following forecasting methodologies is considered a causal forecasting technique?
question
Panel consensus
answer
Which of the following forecasting methods uses executive judgement as its primary component for forecasting?
question
Delphi method
answer
Which of the following forecasting methods is very dependent on selection of the right individuals who will judgmentally be used to actually generate the forecast?
question
Less than three months
answer
In business forecasting, what is usually considered a short-term time period?
question
Three months to two years
answer
In business forecasting, what is usually considered a medium-term time period?
question
Two years or longer
answer
In business forecasting, what is usually considered a long-term time period?
question
Short-term forecasts
answer
In general, which forecasting time frame compensates most effectively for random variation and short term changes?
question
Medium term forecasts
answer
In general, which forecasting time frame best identifies seasonal effects?
question
Long range forecasts
answer
In general, which forecasting time frame is best to detect general trends?
question
Simple exponential smoothing
answer
Which of the following forecasting methods can be used for short-term forecasting?
question
Product
answer
Which of the following considerations is not usually a factor in deciding which forecasting model a firm should choose?
question
142.5
answer
A company wants to forecast demand using the simple moving average. If the company uses four prior yearly sales values (i.e., year 2007 = 100, year 2008 = 120, year 2009 = 140,and year 2010 = 210), which of the following is the simple moving average forecast for year 2011?
question
133.3
answer
A company wants to forecast demand using the simple moving average. If the company uses three prior yearly sales values (i.e., year 2008 = 130, year 2009 = 110, and year 2010=160), which of the following is the simple moving average forecast for year 2011?
question
128
answer
A company wants to forecast demand using the weighted moving average. If the company uses two prior yearly sales values (i.e., year 2009 = 110 and year 2010 = 130), and we want to weight year 2009 at 10% and year 2010 at 90%, which of the following is the weighted moving average forecast for year 2011?
question
158
answer
A company wants to forecast demand using the weighted moving average. If the company uses three prior yearly sales values (i.e., year 2008 = 160, year 2009 = 140 and year 2010 =170), and we want to weight year 2008 at 30%, year 2009 at 30% and year 2010 at 40%,which of the following is the weighted moving average forecast for year 2011?
question
Accuracy
answer
Which of the following is the major reason that exponential smoothing has become well accepted as a forecasting technique?
question
The most recent forecast
answer
The exponential smoothing method requires which of the following data to forecast the future?
question
232
answer
Given a prior forecast demand value of 230, a related actual demand value of 250, and a smoothing constant alpha of 0.1, what is the exponential smoothing forecast value for the following period?
question
5% to 10%
answer
If a firm produced a standard item with relatively stable demand, the smoothing constant alpha used in an exponential smoothing forecasting model would tend to be in which of the following ranges?
question
The more rapid the growth, the higher the percentage
answer
If a firm produced a product that is experiencing growth in demand, the smoothing constant alpha used in an exponential smoothing forecasting model would tend to be which of the following?
question
1,030
answer
Given a prior forecast demand value of 1,100, a related actual demand value of 1,000, anda smoothing constant alpha of 0.3, what is the exponential smoothing forecast value?
question
111
answer
A company wants to generate a forecast for unit demand for year 2011 using exponential smoothing. The actual demand in year 2010 was 120. The forecast demand in year 2010 was 110. Using this data and a smoothing constant alpha of 0.1, which of the following is the resulting year 2011 forecast value?
question
897
answer
As a consultant you have been asked to generate a unit demand forecast for a product for year 2011 using exponential smoothing. The actual demand in year 2010 was 750. Theforecast demand in year 2010 was 960. Using this data and a smoothing constant alpha of 0.3,which of the following is the resulting year 2008 forecast value?
question
Failing to include the right values
answer
Which of the following is a possible source of bias error in forecasting?
question
Mean absolute deviation
answer
Which of the following is used to describe the degree of error?
question
5
answer
A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from this data?
question
20
answer
A company has actual unit demand for four consecutive years of 100, 105, 135, and 150.The respective forecasts were 120 for all four years. Which of the following is the resulting MAD value that can be computed from this data?
question
0.2
answer
If you were selecting a forecasting model based on MAD, which of the following MAD values reflects the most accurate model?
question
About 14.3
answer
A company has calculated its running sum of forecast errors to be 500 and its mean absolute deviation is exactly 35. Which of the following is the company's tracking signal?
question
The forecasting model is operating acceptably
answer
A company has a MAD of 10. It wants to have a 99.7 percent control limits on its forecasting system. Its most recent tracking signal value is 31. What can the company conclude from this information?
question
The forecasting model is out of control and needs to be corrected
answer
You are hired as a consultant to advise a small firm on forecasting methodology. Based on your research you find the company has a MAD of 3. It wants to have a 99.7 percent control limits on its forecasting system. Its most recent tracking signal value is 15. What should be your report to the company?
question
98.334 percent
answer
Which of the following is the portion of observations you would expect to see lying within a plus or minus 3 MAD range?
question
88.946
answer
Which of the following is the portion of observations you would expect to see lying within a plus or minus 2 MAD range?
question
1,640
answer
If the intercept value of a linear regression model is 40, the slope value is 40, and the value of X is 40, which of the following is the resulting forecast value using this model?
question
700
answer
A company hires you to develop a linear regression forecasting model. Based on the company's historical sales information, you determine the intercept value of the model to be 1,200. You also find the slope value is -50. If after developing the model you are given a value of X = 10, which of the following is the resulting forecast value using this model?
question
A causal relationship
answer
Heavy sales of umbrellas during a rain storm is an example of which of the following?
question
85
answer
You are using an exponential smoothing model for forecasting. The running sum of the forecast error statistics (RSFE) are calculated each time a forecast is generated. You find the last RSFE to be 34. Originally the forecasting model used was selected because it's relatively low MAD of 0.4. To determine when it is time to re-evaluate the usefulness of the exponential smoothing model you compute tracking signals. Which of the following is the resulting tracking system?
question
Work package
answer
A project can be subdivided into which of the following?
question
A statement of work
answer
A project starts out as which of the following?
question
A definition of the hierarchy of project tasks, subtasks, and work packages
answer
What is a work breakdown structure?
question
Projects are a way to promote effective leadership
answer
Which of the following is a reason that project management is important?
question
Time
answer
In a Gantt chart the horizontal axis is usually which of the following?
question
Cost and performance tracking schedule
answer
Which of the following is a graphic project report used in project management?
question
Lines of communication are shortened
answer
An advantage of a pure project where self-contained teams work full time on a project is which of the following?
question
A tean member can work on several projects
answer
Some of the advantages of a functional project where the project is housed in a functional division include which of the the following?
question
Matrix project
answer
A series of projects that are organized in such a way that each project utilized people from different functional areas is using which of the following organizational structures?
question
EVM chart
answer
You are looking at a chart that has the terms BCWS, BCWP and AC indicating lines on the chart. What kind of chart are you looking at?
question
Program Evaluation and Review Technique
answer
PERT is an abbreviation for which of the following methodologies?
question
Matrix project
answer
You have just been assigned to oversee a series of projects. Functional areas will loan you personnel for each project and separate project managers will be responsible for separate projects. These project managers will report to you. Which project management structure is being used?
question
Pure project
answer
You have been placed in charge of a large project. Shortened communication lines are required to insure quick resolution of problems as they arise. You recognize that the project is going to take a lot of time and require a lot of team pride, motivation, and commitment by all members. Which project management structure should you use in this situation?
question
A, B, D, E
answer
A simple project listening of five activities and their respective time estimates are presented below --> Using CPM, which actives make up the critical path?
question
12 days
answer
A simple project listening of five activities, their predecessors and their respective time estimates are presented below --> Using CPM, what is the Latest Finish Time for the last activity in this project (i.e., the total time to complete the project)?
question
C
answer
A simple project listing of five activities, their predecessors and their respective time estimates are presented below --> Using the CPM, which activities have slack in this project?
question
A, B, D, F, G
answer
A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented below --> Using CPM, which activities make up their critical path?
question
11 days
answer
A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented below --> Using CPM, what is the Latest Finish Time for the last activity in this project (i.e., the total time to complete the project)?
question
C, E
answer
A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented below --> Using CPM, which activities have slack in this project?
question
The slack for this activity is 2
answer
For an activity in a CPM analysis, the Early Finish time is 8 and the Late Finish time is 10. Which of the following statements is true?
question
The activity is on the critical path
answer
For an activity in a CPM analysis the Early Finish time is 20 and the Late Finish time is 20. Which of the following statements is true?
question
It specifies the relationships in the CPM network of activities
answer
A listing of immediate predecessor activities is important information in a CPM analysis for which of the following reasons?
question
You have multiple critical paths
answer
You have just performed a CPM analysis and have found that more than one path through the project network has zero slack values. What can you conclude?
question
A = $200, B = $300, C = $400
answer
You have the following time and cost information below for use in a Time-Cost CPM Scheduling model --> What are the three costs permit of time to expedite each activity?
question
Total time is 12 days, total cost is $1700
answer
Below are the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the costs include both direct and indirect costs --> What are the total time of this project and total normal cost?
question
Total time is 11 days, total cost is $1850
answer
Below are the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the costs include both direct and indirect costs --> If you crash this project to reduce the total time by one day what is the total time of the project and total cost?
question
Total time is 8 days, total cost is $2750
answer
Below are the data for a Time-Cost CPM Scheduling analysis. The time is in days and the costs include both direct and indirect costs --> If you crash this project to reduce the total time by four days, what is the total time of the project and total cost?
question
$2150
answer
You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project "direct costs" are given below --> The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200,and 13 days they will be $100. If you crash this project by one day what is the total (i.e., direct and indirect) project cost?
question
15 days
answer
You have collected the data for a Time-Cost CPM Scheduling model analysis. The time is in days and the project "direct costs" are given below --> The indirect costs for the project are determined on a daily duration basis. If the project lasts 16 days the total indirect costs are $400, 15 days they will be $250, 14 days they will be $200,and 13 days they will be $100. At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs)?
question
You have reached the minimum total cost
answer
You know when you have arrived at the optimal solution in using the Time-Cost CPM Scheduling model analysis when what happens?
question
Negatively related
answer
In CPM analysis it is generally expected that the relationship between activity direct costs and project indirect costs will be which of the following?
question
Activities' sequential relationships can be specified and networked
answer
Which of the following is an assumption made in using CPM analysis?
question
Projects can change over time and networks can be inaccurate
answer
Which of the following is a criticism made about CPM analysis?
question
Complex projects can change over time and networks become inaccurate
answer
An assumption of CPM analysis is that project activities can be identified and have a clear beginning and ending point. Which of the following is a valid criticism of this assumption?
question
Economies of scope
answer
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:
question
Intermediate range
answer
Capacity planning involving hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planninghorizons?
question
Long-range
answer
Capacity planning involving acquisition or disposal of fixed assets such as buildings,equipment or facilities is considered as which one of the following planning horizons?
question
0.75
answer
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity utilization rate?
question
1.25
answer
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?
question
33 percent
answer
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?
question
Plants within plants (PWP)
answer
The capacity focus concept can be put into practice through a mechanism called which of the following?
question
Provide a broader range of training
answer
The way to build in greater flexibility in your workers is to do which of the following?
question
Immediate product demand
answer
When deciding to add capacity to a factory which of the following need not be considered?
question
Forecasting raw material usage
answer
Which of the following is not a step used in determining production capacity requirements?
question
Decision trees
answer
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?
question
Demand can be smoothed by inventory policies
answer
Compared with a service operation, a manufacturing operation's capacity is which of the following?
question
Machine C
answer
At a decision point in a decision tree, which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%; the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?
question
All of the above
answer
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?
question
Short-range
answer
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?
question
Quality is free
answer
The philosophical leaders of the quality movement, Philip Crosby, W. Edwards Deming,and Joseph M. Juran had the same general message about what it took to achieve outstanding quality. Which of the following was not part of that message?
question
Customer focus
answer
The philosophical leaders of the quality movement, Philip Crosby, W. Edwards Deming,and Joseph M. Juran had the same general message about what it took to achieve outstanding quality. Which of the following was part of that message?
question
Checksheets
answer
An analytical tool used in six-sigma quality improvement programs is which of the following?
question
Pass charts
answer
Which of the following is not an analytical tool used in six-sigma quality improvement programs?
question
Define
answer
A flow chart as part of a six-sigma quality improvement process might be found in which DMAIC category?
question
Analyze
answer
A fishbone diagram as part of a six-sigma quality improvement process might be found in which DMAIC category?
question
Improve
answer
An opportunity flow diagram as part of a six-sigma quality improvement process might be found in which DMAIC category?
question
Measure
answer
A Pareto chart as part of a six-sigma quality improvement process might be found in which DMAIC category?
question
Pareto charts
answer
Which of the following is an analytical tool used in six-sigma quality improvement programs?
question
Tendency analysis
answer
Which of the following is not an analytical tool used in six-sigma quality improvement programs?
question
Calculating a risky priority number for each possible failure
answer
Failure mode and effect analysis is used in six-sigma projects. It involves which of the following?
question
Determine the cause and effect relationships between process variables and output
answer
Design of experiments is a statistical methodology often used in six-sigma projects. It aims to accomplish which of the following?
question
Providing feedback to applicants by the examiners
answer
The Malcolm Baldrige award selection process helps improve quality and productivity bywhich of the following means?
question
Auditing firms
answer
Which of the following are eligible companies to be considered for the Baldrige award?
question
State highway patrol organizations
answer
Which of the following are not eligible to be considered for the Baldrige Award?
question
To improve competitiveness of American firms
answer
The primary purpose of the Malcolm Baldrige National Quality Award is which of the following?
question
Information and analysis
answer
The Grading Criteria of the Baldrige Award for total quality management includes which of the following?
question
Demonstrated outstanding quality in their products and processes
answer
The Malcolm Baldrige National Quality Award is given to organizations that have done which of the following?
question
Use of statistical quality control tools
answer
Which of the following is not a category reported in applying for the Baldrige Award?
question
Aesthetics
answer
The dimension of design quality that concerns the sensory characteristics of the product is which of the following?
question
Reliability
answer
The dimension of design quality that concerns the consistency of performance over time or the probability of failing is which of the following?
question
Features
answer
The dimension of design quality that concerns secondary characteristics is which of the following?
question
Features
answer
Which of the following is a dimension of design quality?
question
Aesthetics
answer
Which of the following is a dimension of design quality?
question
Failures are caused
answer
Which of the following is a basic assumptions that justify an analysis of the costs of quality?
question
Prevention costs
answer
A cost of quality classification is which of the following?
question
Internal failure costs
answer
Which of the following is the cost of quality classification for costs such as scrap, rework, or repair?
question
Appraisal costs
answer
Which of the following is the cost of quality classification for costs such as inspection, testing, and other tasks to ensure that the product or process is acceptable?
question
External failure costs
answer
Which of the following is the cost of quality classification for costs such as defects that pass through the system, such as customer warranty replacements, loss of customer or goodwill, handling complaints, and product repair?
question
Process flow diagram
answer
Which of the following tools uses a graphical representation of the production process to suggest potential sources of process variation?
question
Difference between the highest and lowest value in a sample
answer
In monitoring process quality we might use which of the following statistics?
question
The mean of the production process has shifted to the left of the design limits
answer
You have just used the capability index (Cpk) formulas to compute the two values "min [2,2.5]." Which of the following is the proper interpretation of these numbers?
question
The mean has not shifted at all
answer
You have just used the capability index (Cpk) formulas to compute the two values "min [1,1]." Which of the following is the proper interpretation of these numbers?
question
The mean of the productive process has shifted to the right of the design limits
answer
You have just used the capability index (Cpk) formulas to compute the two values "min[1.5, 1]." Which of the following is the interpretation of these numbers?
question
A change in a raw materials or operations
answer
Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is not a reason that the process being monitored with the chart should be investigated?
question
A single plot falls above or below the control limits
answer
Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is a reason that the process being monitored with the chart should be investigated?
question
1.2
answer
If there are 120 total defects from 10 samples, each sample consisting of 10 individual items in a production process, which of the following is the fraction defective that can be usedin a "p" chart for quality control purposes?
question
2.5
answer
If there are 400 total defects from 8 samples, each sample consisting of 20 individual items in a production process, which of the following is the fraction defective that can be usedin a "p" chart for quality control purposes?
question
0.08
answer
You want to determine the upper control line for a "p" chart for quality control purposes. You take several samples of a size of 100 items in your production process. From the samples you determine the fraction defective is 0.05 and the standard deviation is 0.01. If the desired confidence level is 99.7 percent, which of the following is the resulting UCL value for theline?
question
0.003
answer
You want to determine the lower control line for a "p" chart for quality control purposes.You take several samples of a size of 50 items in your production process. From the samples you determine the fraction defective is 0.006 and the standard deviation is 0.001. If the desired confidence level is 99.7 percent, which of the following is the resulting LCL value for the line?
question
2.58
answer
You want to determine the control lines for a "p" chart for quality control purposes. If the desired confidence level is 99 percent, which of the following values for "z" would you use incomputing the UCL and LCL?
question
0.0707
answer
You want to determine the control lines for a "p" chart for quality control purposes. If the total number of defects from all samples is 2,500, the number of samples is 100, and the sample size is 50, which of the following would be the standard deviation used in developing the control lines?
question
0.0335
answer
You want to determine the control lines for a "p" chart for quality control purposes. If the total number of defects from all samples is 560, the number of samples is 70, and the sample size is 80, which of the following would be the standard deviation used in developing the control lines?
question
Defective electrical switches
answer
For which of the following should we use a "p" chart to monitor process quality?
question
grades in a freshman "pass/fail" course
answer
For which of the following should we use a "p" chart to monitor process quality?
question
Tire pressures in an auto assembly plant
answer
With which of the following should we use an "X-bar" chart based on sample means to monitor process quality?
question
Tire pressures in an auto assembly plant
answer
Which of the following should we use an "R" chart to monitor process quality?
question
Students grades measure from 1 to 100
answer
Which of the following should we use an "R" chart to monitor process quality?
question
36
answer
You are developing an "X-bar" chart based on sample means. You know the standard deviation of the sample means is 4, the desired confidence level is 99.7 percent, and the average of the sample means is 24. Which of the following is your UCL?
question
9.68
answer
You are developing an "X-bar" chart based on sample means. You know the standard deviation of the sample means is 4, the desired confidence level is 99 percent, and the averageof the sample means is 20. Which of the following is your LCL?
question
8.9
answer
You want to develop a three-sigma "R" chart. You know the average range is 5 based on several samples of size 10. Which of the following is the resulting UCL?
question
0.0
answer
You want to develop a three-sigma "R" chart. You know the average range is 12 based on several samples of size 6. Which of the following is the resulting LCL?
question
0.27
answer
If you are going to develop an "X-bar" chart based on range statistics and you are using a sample size of 12 for your charting purposes. Which of the following is the A2 factor for the"X-bar" chart?
question
0.18
answer
If you are going to develop an "R" chart based on range statistics and you are using a sample size of 9 for your charting purposes. Which of the following is the lower control limit D3 factor for the chart?
question
1.65
answer
If you are going to develop an "R" chart based on range statistics and you are using a sample size of 15 for your charting purposes. Which of the following is the upper control limit D4 factor for the chart?
question
Fabrication
answer
Which of the following is not considered a major process flow structure?
question
Both A & C
answer
A difference between project and continuous flow categories of process flow structures is which two of the following?
question
1,000 units
answer
Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break-even?
question
8,000 units
answer
Assume a fixed cost for a process of $120,000. The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50. Which of the following isthe number of units that has to be produced and sold to break-even?
question
The company's total margin will be less than its investment
answer
You are hired as a consultant to decide if your client should purchase a new, highly specialized, piece of equipment. The product to be produced by this equipment is forecast to have a total world wide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?
question
Batches of more than 20 units should be run on machine B
answer
In a workcenter machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit. The workcenter makes products in batches ranging from one unit to one hundred units. Assuming capacity is not a limitation on either machine, on which batches should machine B be used?
question
Workcenter
answer
Which of the following is a basic type of process structure?
question
Product-process matrix
answer
Which of the following is not a basic type of process structure?
question
Assembly line
answer
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?
question
Workcenter
answer
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?
question
Emergency exits
answer
The placement of which of the following is not determined by process structure decisions?
question
9.6
answer
Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 480 and the required output per day in units is 50?
question
0.72
answer
Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?
question
3
answer
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?
question
6
answer
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3 and 6 minutes, and the cycle time is 8 minutes?
question
0.833
answer
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?
question
0.750
answer
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the lineis 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?
question
Speed up the assembly line transfer mechanism
answer
When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?
question
Little's Law
answer
The long-term relationship between the inventory, throughput, and flow time of a production system in steady state is called which of the following?
question
Average time between completions of successive units
answer
Which of the following best describes the term cycle time?
question
Diamond
answer
A process flowchart uses which of the following symbols to represent a decision point in a flow diagram?
question
Starving
answer
Which following production process term best describes the situation when activities in a stage of production must stop because there is no work?
question
Rapid delivery of a standard product
answer
An advantage of a make-to-stock process is which of the following?
question
Throughput time
answer
Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?
question
Work-in-process/Throughput rate
answer
According to Little's Law, which of the following ratios is used to find throughput time?
question
Throughput rate times/Throughput time
answer
According to Little's Law, which of the following can be used to estimate work-in-process inventory?
question
Tasks to be performed
answer
When the textbook presented the topic of job design decisions, the "what" of these decisions concerned which of the following?
question
Automation of heavy manual work
answer
Job design decisions are being affected by which of the following trends?
question
Ease in learning the job
answer
Some of the advantages for labor to increasing specialization of labor in job design include which of the following?
question
Operations chart
answer
Which of the following work methods design aids might be used by a methods analyst in determining the best work methods to be used by a worker at a fixed workplace?
question
Time study
answer
Which of the following work methods design aids might be used by a methods analyst in determining the best work methods to be used by a worker at a fixed workplace? (2)
question
Equal to or greater than time spent working
answer
According the ideas of work physiology, if a job requires a caloric expenditure above 5 calories per minute, what rest period is necessary?
question
4.4 minutes
answer
If the normal time for a job is 4 minutes and the allowances for the job are 10 percent of normal time, which one of the following comes closest to the standard time for this job?
question
Worker illness
answer
Which of the following are not used as reasons to justify time allowances in a time study analysis?
question
To measure performance
answer
Which of the following is one of the primary reasons for work sampling?
question
How many observations are necessary
answer
In work sampling, which one of the following main issues must be decided before undertaking the study?
question
0.90
answer
A time study was made of a job to develop new time standards. A worker was observed for 30 minutes. During that time, 40 units were produced. The analyst rated the worker as performing at 120 percent performance rate. What is the normal time for this task?
question
1.00 minute
answer
A time study was made of a job to develop new time standards. A worker was observed for 30 minutes. During that time, 40 units were produced. The analyst rated the worker as performing at 120 percent performance rate. What is the standard time for this task?
question
$160,000
answer
A worker was producing a product for which the standard time was one minute per unit. During an eight hour workday, the worker produced 520 units. What would be the worker's pay for that day if the basic pay rate was $10.00 per hour and the piece rate bonus was $2.00 per unit above standard?
question
Shared integrated design databases
answer
Which of the following is an important element in the success of concurrent engineering?
question
The house of quality mix
answer
Which of the following is not an important element in the success of concurrent engineering?
question
Simplification of the product by reducing the number of separate parts
answer
Design for manufacturing and assembly delivers product improvements by emphasizing which of the following?
question
Virtual factory
answer
Which of the following is not considered a major process flow structure?
question
The stability of the product line
answer
The major difference between the job shop and batch shop categories of process flow structures is which of the following?
question
Assembly chart
answer
A chart used in process flow design depicting an exploded view of a product and its component parts is which of the following?
question
Number of projects completed
answer
Which of the following is a time-to-market performance measure used in judging product development performance?
question
Responsiveness to customer needs
answer
What dimension of competitiveness does time-to-market performance in product design and process selection impact?
question
1,000 units
answer
Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break-even?
question
As a series of standard modules
answer
Global products are often designed to reflect which of the following?
question
Batches of more than 20 units should be run on machine center B
answer
In a job shop Machine Center A has a ten minute set-up time per batch and a two minute per unit run time. Machine Center B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit. The job shop makes products in batches ranging from one unit to one hundred units. Assuming capacity is not a limitation on either machine, on which batches should Machine Center B be used?
question
Cost per square foot of alternative facilities
answer
Which of the following is not considered an input to the layout decision in facility layout analysis?
question
Cellular layout
answer
Which of the following is a basic type of production layout format?
question
Flow-shop layout
answer
Which of the following basic types of production layout formats is one which equipment or work processes are arranged according to the progressive steps by which the product is made?
question
Process layout
answer
Which of the following basic types of production layout formats is one which similar equipment or functions are grouped together?
question
A small team of workers who turn out complete units of work
answer
We would expect to see in a group technology layout which of the following?
question
Temperature
answer
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
question
Lighting
answer
In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?
question
Backtracking kept to a minimum
answer
Some of the suggestions for a good layout for manufacturing and back-office operations include which of the following?
question
The physical surroundings in which the service takes place
answer
The term "servicescape" refers to which of the following?
question
Machines which have randomly spaced service requirements
answer
Which of the following is an example of a finite population in a queuing system
question
Last in, first out
answer
Which of the following is not a queue discipline discussed in the textbook?
question
Multichannel, single phase
answer
Buying food at a large food store with multiple checkout counters features which type of queuing system line structure?
question
Single channel, single phase
answer
Getting an autograph from a famous person might involve standing in which type of queuing line structure?
question
Single channel, multiphase
answer
In a college registration process, several department heads have to approve an individual student's semester course load. What is the queuing system line structure?
question
0.5 hours
answer
Assume the service rate for a queue in a truck-loading operation is 2 trucks per hour. Using the infinite queuing notion for the models presented in the textbook which of the following is the average service time?
question
0.2 hours
answer
If the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals?
question
Self-service approach
answer
Which of the following is one of the three contrasting approaches to delivering on-site service?
question
Production line approach
answer
Which of the following is one of the three contrasting approaches to delivering on-site service?
question
McDonald's Corporation
answer
Which company pioneered the production line approach to delivering on-site service?
question
Self-service approach
answer
Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service?
question
Each element of service system consistent with the operating focus of the firm
answer
Which of the following is a characteristic of a well-designed service system?
question
Physician practice
answer
Which of the following is considered a high-contact service operation?
question
Task
answer
There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's used to classify poka-yokes?
question
Low production efficiency
answer
In the service-system design matrix, a face-to-face total customization service encounter is expected to have which of the following?
question
Low sales opportunity
answer
In the service-system design matrix, a mail contact service encounter is expected to have which of the following?
question
All of the above are inputs
answer
Which of the following would not be considered an input in the airline business?
question
Blocking
answer
________ is when the activities in the stage must stop because there is no place to deposit the item just completed.
question
Blocking and starving
answer
The most common things that can happen when two stages are directly linked are:
question
Single stage or multi stage, make to stock or make to order, paced or non paced
answer
Processes can be characterized as:
question
Make-to-stock processes can be controlled based on the actual or anticipated amount of finished goods inventory. and Make-to-stock process is used when demand is seasonal and the firm does not have enough capacity to keep up during the peak season.
answer
Which of the following is true about make-to-stock processes?
question
Utilization
answer
According to your text, the most common process metric is:
question
Cycle time
answer
The average time between completion of units is commonly known as:
question
Setup time
answer
In practice, often _______ time is not included in the utilization of the process.
question
Changing the sequence of activities
answer
Throughput time cannot be reduced in a process by:
question
Inputs, outputs, transformations
answer
A process consists of all the following except:
question
Utilization
answer
The ______________ is the ratio of the time that a resource is actually activated relative to the time that it is available for use.
question
Buffer
answer
An area between stages where output is stored prior to its use in a downstream stage is called:
question
Make to stock
answer
A _______________ process ends when the inventory of finished goods has been completed. Customer orders are then served from this inventory.
question
363.33 minutes
answer
A machine is designed to produce units at a rate of 30 per minute or one unit every two seconds. The setup time to configure the machine is 30 minutes. What is the operation time to make a batch of 10,000 units?
question
120 units entering a system and 120 units exiting
answer
Which of the following is an example of a steady rate assembly line?
question
All of the above are true
answer
A production process is often depicted as a funnel. If liquid is poured into the funnel at a rate greater than it can exit:
question
Flexibility improves
answer
An advantage of a touch-screen self-order kiosk in a fast food restaurant is:
question
Run time
answer
The time required to produce a batch of parts is called:
question
The value added time is the sum of all the activity
answer
If all activities included in a production process are value-added activities, which of the following is true?
question
All of the above
answer
The trends affecting job design decisions include:
question
A and B
answer
The advantage(s) of specialization of labor to management include:
question
Little difficulty in learning job
answer
Which of the following is an advantage of specialization of labor for labor?
question
Work physiology
answer
Which of the following is not a job design principle that individuals or work groups require as a logical integration of work activities?
question
A and B
answer
The reasons for work measurement standards include:
question
Observed performance time per unit x performance rating
answer
In a time study the normal time is equal to:
question
A, B, and C
answer
The primary applications of work sampling include:
question
Provides a complete breakdown of elements
answer
The advantage(s) of work sampling compared to time study include all the following EXCEPT:
question
Pierce rate
answer
The basic elements of a Scanlon Plan include all but:
question
Pierce rate
answer
The reward/incentive plan that allows management to target specific output goals is:
question
Project
answer
According to Hayes and Wheelwright, which of the following is not a major process flow structure?
question
Continous flow
answer
The type of processing structure that is used to produce gasoline, chemicals, and steel is:
question
Assembly line
answer
The type of processing structure that is used for producing discrete products at higher volume is:
question
Heavy equipment
answer
An example of a business/industry that uses batch flow process structure is:
question
Both A and B
answer
he major decision variables in equipment selection are:
question
Assembly line
answer
The best process flow structure to use for making automobiles is?
question
The point where cost is minimized
answer
A break even point indicates which of the following:
question
Linear layout
answer
Which of the following is not a basic type of production layout?
question
Pattern of workflow
answer
The basic difference between product and process layout pertains to:
question
Product layout
answer
A flow shop layout is often referred to as a:
question
0.6
answer
A company wants to produce 800 units during a day where the assembly line operates a full 8-hour shift. The required cycle time in minutes is:
question
4
answer
The total time to complete all of the tasks for the assembly line referred to in #4 is 2.3 minutes. The theoretical minimum number of stations needed is:
question
Slower tooling changes
answer
Which of the following is not a benefit of a group technology layout?
question
All of the above
answer
Important servicescape elements include:
question
A and C
answer
Generalizations that can be made pertaining to the nature of services include:
question
Field-based services
answer
Home repair services are an example of:
question
A, B, and D
answer
The service triangle includes:
question
Greater; greater
answer
The ______ the percentage of contact time between the service system and the customer, the ________ the degree of interaction between the two during the production process.
question
Accessibility
answer
The item "most" emphasized by the survey respondents of the 1997 survey conducted by Roth, Chase, and Voss was:
question
All of the above are identified
answer
Which of the following is not an alternative identified in the service-system design matrix?
question
Face-to-face total customization
answer
______________ refers to service encounters whose specifications must be developed through some interaction between the customer and the server.
question
A, B, and C
answer
Which of the following statements is not true about the strategic uses of the service-system design matrix?
question
Personal attention approach
answer
The approach to delivering on-site service made famous by Nordstrom department stores is:
question
Ensures the firm makes a profit
answer
Which of the following is not an element of a good service guarantee?
question
All of the above
answer
The major components of the queuing system are:
question
Length of the arrival
answer
In the queuing system, which of the following is not an arrival characteristic?
question
First come, first served
answer
The most common priority rule/queuing discipline is:
question
Multiple channel, multiple phase
answer
The admission of patients in a hospital is a typical example of:
question
Balking
answer
A customer who arrives, looks, and then leaves is:
question
Cost of goods sold/Average aggregate inventory value
answer
The inventory turnover ratio used in measuring supply-chain efficiency is found by the ratio of which of the following?
question
Average aggregate inventory value
answer
The total value of all items held in inventory for the firm at cost is which of the following?
question
234
answer
If the average aggregate inventory value is $45,000 and the cost of goods sold is $10,000,which of the following is weeks of supply?
question
104
answer
If the average aggregate inventory value is $1,200,000 and the cost of goods sold is $600,000, which of the following is weeks of supply?
question
0.5
answer
If the average aggregate inventory value is $1,200,000 and the cost of goods sold is $600,000, which of the following is inventory turnover?
question
4.5
answer
If the average aggregate inventory value is $100,000 and the cost of goods sold is $450,000, which of the following is inventory turnover?
question
Risk hedging
answer
n Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following?
question
Efficient
answer
In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with a stable supply process is called which of the following?
question
Agile
answer
In Hau Lee's uncertainty framework to classify supply chains, a supply chain for innovative products with an evolving supply process is called which of the following?
question
Responsive
answer
In Hau Lee's uncertainty framework to classify supply chains, a supply chain for innovative products with a stable supply process is called which of the following?
question
Bullwhip effect
answer
The effect of the lack of synchronization among supply-chain members is referred to as which of the following?
question
Activities involving shareholders
answer
In outsourcing which of the following internal activities and decision responsibilities cannot be transferred to outside contractors?
question
Improve effectiveness by focusing on what the firm does best
answer
Which of the following is an organizationally-driven reason for outsourcing?
question
Improve credibility and image by associating with superior providers
answer
Which of the following is not an organizationally-driven reason for outsourcing?
question
Shorten cycle time
answer
Which of the following is an improvement-driven reason for outsourcing?
question
Enhance effectiveness by focusing on what you do best
answer
Which of the following is not an improvement-driven reason for outsourcing?
question
Giving the outsourcing partner opportunities to become a strong competitor
answer
When considering outsourcing, what should firms be sure to avoid?
question
Agile supply chain
answer
Which is the most challenging kind of supply chain to manage according to Hau Lee?
question
Innovative products
answer
Which of the following of Fisher's product categories includes fashionable clothing, personal computers and other products that typically have a very brief life cycle?
question
Increase commitment in a non-core area
answer
Which of the following is not an improvement-driven reason to outsource?
question
Coordination
answer
Which of the following is one of the strategic characteristics to consider when deciding how supplier relationships should be structured on the continuum between vertical integration (do not outsource) to arm's length relationships (outsource)?
question
Confer with environmental groups
answer
The six-step process for green sourcing does not include which of the following?
question
Develop the sourcing strategy
answer
The six-step process for green sourcing includes which of the following?
question
Taxes
answer
Ownership costs are incurred after the initial purchase and are associated with the ongoing use of the product or material. Which of the following is not an ownership cost listed in thetext?
question
Quality costs
answer
Acquisition costs include which of the following costs?
question
Supply chain costs
answer
Ownership costs include which of the following costs?
question
The service facilities we wish to model are connected to each other
answer
We may prefer a simulation model to a queuing model when:
question
Historical cost
answer
Which of the following is not a criterion that influences manufacturing plant or warehouse facility location decisions?
question
Gross national product
answer
Which of the following is a not criterion that influences manufacturing plant or warehouse facility location decisions?
question
Immigration rules
answer
Which of the following is not a criterion that influences manufacturing plant or warehouse facility location decisions?
question
Proximity to customers
answer
Which of the following is a criterion that influences manufacturing plant or warehousefacility location decisions?
question
The willingness of local politicians to provide favorable treatment for a consideration
answer
An important issue in facility location analysis is business climate. An unfavorable business climate could be indicated by which of the following?
question
Historical costs
answer
One of the objectives of facility location analysis is to select a site with the lowest total cost. Which of the following costs should be excluded from the analysis?
question
Incidental costs
answer
One of the objectives of facility location analysis is to select a site with the lowest total cost. Which of the following costs should not be included in the analysis?
question
Becoming less responsive to the custoemr
answer
One of the objectives of facility location analysis is to select a site with the lowest total cost. Which of the following are hidden costs that should be included in the analysis?
question
Movement of preproduction material between locations
answer
One of the objectives in facility location analysis is to select a site with the lowest total cost. Which of the following costs are hidden costs that should be included in the analysis?
question
Adequate low cost labor
answer
Which of the following is not an infrastructure criteria used in facility location analysis?
question
About 260
answer
How many free trade zones are there in the United States?
question
North American Free Trade Agreement countries
answer
An example of a trading bloc is which of the following?
question
Centroid method
answer
Which of the following is a plant location methodology good for locating a single facility within a set of existing facilities based in distances and volumes of goods shipped?
question
To determine which corner of a street intersection to locate a retail service facility
answer
In which of the following situations should we not use the transportation method of linear programming?
question
Volume of goods to be shipped between existing points
answer
The centroid method for plant location uses which of the following data?
question
About 115
answer
Plant A is located at the (X, Y) coordinates of (100, 200) and has a volume of shipping of 500 units a day. Plant B is located at the (X, Y) coordinates of (150, 400) and has a volume of shipping of 200 units a day. Using the centroid method, which of the following is the X coordinate for the new plant location?
question
About 389
answer
Plant A is located at the (X, Y) coordinates of (200, 500) and has a volume of shipping of 400 units a day. Plant B is located at the (X, Y) coordinates of (300, 100) and has a volume of shipping of 300 units a day. Using the centroid method, which of the following is the X coordinate for the new plant location?
question
(88, 138)
answer
A company wants to determine where they should locate a new warehouse. They have two existing production plants (i.e., Plant A and Plant B) that will ship units of a product to this warehouse. Plant A is located at the (X, Y) coordinates of (50, 100) and will have volume of shipping of 250 units a day. Plant B is located at the (X, Y) coordinates of (150, 200) and will have a volume of shipping of 150 units a day. Using the centroid method, which of thefollowing are the X and Y coordinates for the new plant location?
question
Pipeline
answer
What transportation mode has very high initial investment costs but gives a very low cost per mile for products that are highly specialized and require no packaging?
question
Highway
answer
Very few products are moved without at least part of their journey being by which modeof transportation?
question
Customer contact
answer
Which of the following refers to the physical presence of the customer in a service system?
question
Mail
answer
Which of the following are alternative possible degrees of customer contact included in the Service-System Design Matrix?
question
Internet
answer
Which of the following is a degree of customer/server contact included in the service-system design matrix?
question
Low production efficiency
answer
In the service-system design matrix, a face-to-face loose specs service encounter is expected to have which of the following?
question
High production efficiency
answer
In the service-system design matrix, an internet and on-site technology service encounter is expected to have which of the following?
question
Segment the customers
answer
Which of the following is a suggestion for managing queues that is mentioned in the textbook?
question
Periodically close the service channel to temporarily disperse the line
answer
Which of the following is not a suggestion for managing queues presented in the textbook?
question
Determine an acceptable waiting time for your customers
answer
Which of the following is not a suggestion for managing queues presented in the textbook?
question
Train your servers to be friendly
answer
Which of the following is a suggestion for managing queues presented in the textbook?
question
The number of servers and the waiting line
answer
Which of the following are the two major components of a queuing system?
question
Machines which have randomly spaced service requirements
answer
Which of the following is an example of a finite population in a queuing system?
question
Soonest promise date
answer
Which of the following queue discipline is mentioned in the textbook?
question
Multichannel, single phase
answer
Buying a ticket for a college football game where there are multiple windows to buy theticket at features which type of queuing system line structure?
question
Single channel, single phase
answer
Standing in line to buy a ticket for a movie where there is only one window to buy ticketsis which type of queuing system Line Structure?
question
Single channel, single phase
answer
A roller coaster ride in an amusement park employs which type of queuing system line structure?
question
Single channel, single phase
answer
Machine breakdown and repair in a twelve machine factory having one repair mechanic would develop which type of queuing system line structure concerning machine breakdowns?
question
Multichannel, single phase
answer
Machine breakdown and repair in a twelve machine factory having three repair mechanics would develop which type of queuing system line structure concerning machine breakdowns?
question
12 minutes
answer
If the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals?
question
Can not be determined
answer
A company is concerned about the number of customers that have to wait for service in their customer service department. Assume the rate at which customers are serviced is 12 per hour. Using the infinite queuing notion for the models presented in the textbook which of the following is the mean time between arrivals?
question
An online dating service
answer
An example of a virtual service is which of the following?
question
A service encounter that conforms to specifications
answer
A service blueprint is not which of the following?
question
Tear-out cards in magazines
answer
Which of the following are not examples of poka-yokes described in the text?
question
Process planning
answer
In an overview of the major operations planning activities in a typical organization, which of the following activities precedes aggregate sales and operations planning?
question
Vehicle loading
answer
In an overview of the major operations planning activities in a typical logisticsorganization, which of the following activities follows aggregate sales and operations planning?
question
Workforce scheduling
answer
In an overview of the major operations planning activities in a typical service organization, which of the following activities follows aggregate sales and operations planning?
question
Vehicle capacity planning
answer
In an overview of the major operations planning activities in a typical logistics organization, which of the following activities immediately follows aggregate sales and operations planning?
question
Workforce levels and inventory on hand
answer
The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?
question
Raw material availability and competitor's behavior
answer
In conducting aggregate operations planning there are a number of required inputs. Which of the following are inputs considered external to the firm?
question
Competitors' behavior and economic conditions
answer
In conducting aggregate operations planning there are a number of required inputs. Which of the following are inputs considered external to the firm?
question
Current physical capacity and current workforce
answer
In conducting aggregate operations planning there are a number of required inputs. Which of the following are considered inputs internal to the firm?
question
Level
answer
Which of the following is a production planning strategy presented in the textbook?
question
Stable workforce, variable work hours
answer
Which of the following is considered a "pure" production planning strategy?
question
Chase
answer
Matching the production rate to the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies?
question
Level
answer
Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inventory levels, order backlogs and allowing lost salesis which of the following production planning strategies?
question
Backordering costs
answer
Which of the following costs are relevant to aggregate operations planning?
question
1,340
answer
Using the cut-and-try method for aggregate operations planning we can determine the production requirement in units of product. If the beginning inventory is 100 units, the demand forecast is 1,200, and the necessary safety stock is 20% of the demand forecast, which of the following is the production requirement?
question
600
answer
Using the cut-and-try method for aggregate operations planning we can determine the production requirement in units of product. If the beginning inventory is 500 units, the demand forecast is 1,000, and the necessary safety stock is 10% of the demand forecast, which of the following is the production requirement?
question
There is a smooth flow throughout the production system
answer
An advantage of the level strategy for aggregate operations planning is which of the following?
question
Purchased items from vendors can be delivered when and where needed
answer
An advantage of the level strategy for aggregate operations planning is which of the following?
question
Cut and try
answer
Which of the following methods requires generating several alternative aggregate plans?
question
Inventory is perishable
answer
From an operational perspective yield management is most effective under which of the following circumstances?
question
Demand is stable and close to capacity
answer
From an operational perspective yield management is least effective under which of the following circumstances?
question
The product can be kept to be sold when demand is stronger
answer
From an operational perspective yield management is least effective under which of the following circumstances?
question
Management acumen
answer
Which of the following is not a major strategic operational competitive dimension that forms a company's competitive position?
question
Cost or price
answer
A major competitive dimension that forms a company's strategic operational competitive position in their strategic planning is which of the following?
question
Technical liaison
answer
When developing an operations and supply strategy, which of the following is an important product-specific criterion to consider?
question
Supplier after-sale support
answer
In development of an operations and supply strategy, which of the following would be an important product-specific criteria to consider?
question
Straddling
answer
When a company seeks to match the benefits of a successful position while maintaining its existing position in offering customers a variety of differing services, what is this process called?
question
A network that shows how a company's strategy is delivered to customers
answer
An activity-based map is which of the following?
question
Earnings per share
answer
Which of the following is not a measure of operations and supply management efficiency used by Wall Street?
question
Receivable turnover
answer
Which of the following is a measure of operations and supply management efficiency used by Wall Street?
question
Output/Materials
answer
Which of the following is a partial measure of productivity?
question
Output/(Labor + Capital + Energy)
answer
Which of the following is a multifactor measure of productivity?
question
Output/Inputs
answer
Which of the following is a total measure of productivity?
question
Partial measure
answer
If all you knew about a production system was that total daily output was 400 units and the total labor necessary to produce the 400 units was 350 hours, what kind of productivity measure could you use to compute productivity?
question
Partial measure and multi factor measure
answer
If all you knew about a production system was that total daily output was 400 units and the total labor necessary to produce the 400 units was 350 hours, and the total materials used were 425 units, what kind of productivity measure could you use to compute productivity?
question
1,428
answer
The total output from a production system in one day is 500 units and the total labor necessary to produce the 500 units is 350 hours. Using the appropriate productivity measure, which of the following numbers represents the resulting productivity ratio?
question
1.000
answer
The total output from a production system in one day is 900 units and the total labor necessary to produce the 900 units is 900 hours. Using the appropriate productivity measure, what is the resulting productivity ratio?
question
8.97
answer
Larry's Auto Body Repair Shop had revenues that averaged $60,000 per week in April and $50,000 per week in May. During both months, the shop employed six full-time (40 hours/week) workers. In April the firm also had four part-time workers working 25 hours per week but in May there were only 2 part-time workers and they only worked 10 hours per week. What is the percentage change in labor productivity from April to May for Larry's Auto Body Repair?
question
2.88
answer
Various financial data for SunPath Manufacturing for 2010 & 2011 follow --> What is the percentage change in SunPath's total productivity measure between 2010 & 2011?
question
10.39
answer
Various financial data for SunPath Manufacturing for 2010 & 2011 follow --> What is the percentage change in the energy partial productivity measure for SunPath between 2010 & 2011?
question
2.33
answer
Various financial data for SunPath Manufacturing for 2010 & 2011 follow --> What is the percentage change in the labor partial productivity measure for SunPath between 2010 & 2011?
question
-0.53
answer
Various financial data for SunPath Manufacturing for 2010 & 2011 follow --> What is the percentage change in the multifactor labor and raw materials productivity measurefor SunPath between 2010 & 2011?
question
A philosophy of waste elimination
answer
Which of the following are related to lean production?
question
Overproduction
answer
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
question
Product defects
answer
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
question
Motion
answer
In the textbook Toyota's Fujio Cho identified which of the following types of waste to be eliminated?
question
Hidden inventory
answer
Which of the following is a key inventory reduction target under lean production?
question
Quality at the source
answer
Which of the following addresses elimination of waste under lean production?
question
Kanban production control system
answer
Which of the following is an element that addresses elimination of waste under lean production?
question
Reducing waiting time between process operations
answer
Group technology (GT) is credited with which of the following benefits?
question
In a paperless control system, containers can be used instead of cards
answer
Which of the following statements holds true for Kanban production control systems?
question
30
answer
In setting up a Kanban control system you need to determine the number of Kanban cardsets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what is the number of Kanban card sets needed?
question
120
answer
In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20% of the demand during lead time, the container size is 4. If the lead time to replenish an order is8 hours, what number of Kanban card sets is needed?
question
47
answer
You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25% of the demand during lead time. The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation?
question
6,300
answer
You have been called in as a consultant to set up a Kanban control system. The first thing you do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimatethe safety stock should be set at 5% of the demand during lead time. The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours. Which of the following is the number of Kanban card sets necessary to support this situation?
question
Design for work flow balance
answer
In designing a lean production facility layout a designer should do which of the following?
question
Level scheduling
answer
When implementing a lean production system a stabilized schedule is achieved using which of the following?
question
Reduce lot sizes
answer
To implement a Kanban pull system a firm would do which of the following?
question
Reduce lead times
answer
In implementing a lean production system you should work with suppliers to do which of the following?
question
Make frequent deliveries
answer
In implementing a lean production system you should work with suppliers to do which of the following?
question
Reduce setup/changeover time
answer
To implement a flow process in developing a lean system a firm might do which of the following?
question
Balance workstation capacities
answer
To implement a flow process in developing a lean system a firm might do which of the following?
question
Total costs will be lower for the Kanban/lean production operation
answer
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a Kanban/lean production approach. What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?
question
No extra inventory
answer
In a lean production system we expect to see which of the following?
question
Freeze windows
answer
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?
question
Backflush
answer
An activity where the parts that go into each unit of a product are periodically removedfrom inventory and accounted for based on the number of units produced is called which of the following?
question
Leveling the facility load
answer
Which of the following is a lean production technique that has been successfully applied in service firms?