Information Technology Project Management CH 5 6ed – Flashcards

Unlock all answers in this set

Unlock answers
question
analogy approach
answer
creating a WBS by using a similar project's WBS as a starting point
question
bottom-up approach
answer
creating a WBS by having team members identify as many specific tasks related to the project as possible and then grouping them into higher level categories
question
decomposition
answer
subdividing project deliverables into smaller pieces
question
deliverable
answer
a product, such as a report or segment of software code, produced as part of a project
question
Joint Application Design (JAD)
answer
using highly organized and intensive workshops to bring together project stakeholders the sponsor, users, business analysts, programmers, and so on to jointly define and design information systems
question
project scope management
answer
the processes involved in defining and controlling what work is or is not included in a project
question
project scope statement
answer
a document that includes, at a minimum, a description of the project, including its overall objectives and justification, detailed descriptions of all project deliverables, and the characteristics and requirements of products and services produced as part of the project
question
prototyping
answer
developing a working replica of the system or some aspect of the system to help define user requirements
question
requirement
answer
a condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document
question
requirements management plan
answer
a plan that describes how project requirements will be analyzed, documented, and managed
question
requirements traceability matrix (RTM)
answer
a table that lists requirements, various attributes of each requirement, and the status of the requirements to ensure that all requirements are addressed
question
scope
answer
all the work involved in creating the products of the project and the processes used to create them
question
scope baseline
answer
the approved project scope statement and its associated WBS and WBS dictionary
question
scope creep
answer
the tendency for project scope to keep getting bigger
question
top-down approach
answer
creating a WBS by starting with the largest items of the project and breaking them into their subordinate items
question
use case modeling
answer
— a process for identifying and modeling business events, who initiated them, and how the system should respond to them
question
variance
answer
the difference between planned and actual performance
question
WBS dictionary
answer
a document that describes detailed information about each WBS item
question
work breakdown structure (WBS)
answer
a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project
question
work package
answer
a task at the lowest level of the WBS
question
c. Scope
answer
1. ________________ refer(s) to all the work involved in creating the products of the project and the processes used to create them. a. Deliverables b. Milestones c. Scope d. Product development
question
a. interviews
answer
2. Which tool or technique for collecting requirements is often the most expensive and time consuming? a. interviews b. focus groups c. surveys d. observation
question
b. WBS
answer
3. A ___________ is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. a. scope statement b. WBS c. WBS dictionary d. work package
question
d. mind mapping
answer
4. What approach to developing a WBS involves writing down or drawing ideas in a nonlinear format? a. top-down b. bottom-up c. analogy d. mind mapping
question
c. 2
answer
5. Assume you have a project with major categories called planning, analysis, design, and test- ing. What level of the WBS would these items fall under? a. 0 b. 1 c. 2 d. 3
question
d. Dont involve too many users in scope management
answer
Which of the following is not a best practice that can help in avoiding scope problems on information technology projects? a. Keep the scope realistic b. Use off-the-shelf hardware and software whenever possible c. Follow good project management processes d. Dont involve too many users in scope management
question
c. McDonalds
answer
7. What major restaurant chain terminated a large project after spending $170 million on it, pri- marily because they realized the project scope was too much to handle? a. Burger King b. Pizza Hut c. McDonalds d. Taco Bell
question
a. verification
answer
8. Scope ____________ is often achieved by a customer inspection and then sign-off on key deliverables. a. verification b. validation c. completion d. close-out
question
d. Only have meetings as needed, not on a regular basis
answer
Which of the following is not a suggestion for improving user input? a. Develop a good project selection process for information technology projects b. Have users on the project team c. Co-locate users with developers d. Only have meetings as needed, not on a regular basis
question
c. WBS
answer
10. Project management software helps you develop a ___________, which serves as a basis for creating Gantt charts, assigning resources, and allocating costs. a. project plan b. schedule c. WBS d. deliverable