Construction Management JumpStart- Jackson – Flashcards

Unlock all answers in this set

Unlock answers
question
Base Isolators
answer
Large shock absorbers made of alternating layers of rubber and steel attached to a buildings foundation to allow movement of the structure without causing damage.
question
Brownfield Sites
answer
A property that is abandoned or underused because of historic environmental contamination.
question
Constructibility Review
answer
A design review process in which experienced contractors and construction managers work with designers to ensure that the details of the design actually can be built in an efficient and cost-effective manner. The process entails review of materials, application, installation techniques, field execution, and building systems.
question
Cofferdams
answer
Temporary watertight enclosures erected to prevent water from seeping into an area
question
Curtain Wall
answer
Nonload-bearing exterior wall used as a weather barrier but not for structural support
question
Infrastructure
answer
Basic roadways, bridges, and railroad networks that support a community or society.
question
Lean Principles
answer
Customer focus Culture and people Workplace organization and standardization Elimination of waste Continuous improvement and built-in quality
question
Architectural Program
answer
the research and decision making process, initiated by an owner, usually with help of an architect or other programming specialist, that identifies the basic needs of the client and the parameters of the project to be designed and ultimately built by a construction professional.
question
Project Delivery
answer
process by which all the procedures and components of designing and building a facility are organized and put together in an agreement that results in a completed project.
question
Self-Performed Work
answer
construction work that is performed with the general contractors own forces or labor. This work is not subcontracted
question
Slip Forms
answer
concrete forms that rise up the wall as construction progresses
question
Specifications
answer
detail the requirements/characteristics of a project
question
Review Questions: What is the name of the stone carvings dating back to the pyramids that contained the first written regulations pertaining to construction, the first building code?
answer
Code of Hammurabi
question
By what measurement is construction used as an economic indicator for the U.S. economy?
answer
housing starts
question
Five Primary Sectors of Construction Industry:
answer
Residential Commercial Heavy civil Industrial Environmental
question
Name of organization credited with promoting construction management as a legitimate area of study at a four year university:
answer
Associated Schools of Construction (ASC)
question
Role of Owner:
answer
driving force behind the industry. develop the programs define the scope create budget provide funding
question
Weekly Construction Magazine:
answer
ENR- Engineering News Record
question
Three Associations Affiliated with Construction Industry:
answer
1. Associated General Contractors 2. Associated Builders and Contractors 3.National Association of Home Builders
question
LEED
answer
Stands for: Leadership in energy and environmental design. Purpose: rating system that evaluates a building's environmental performance over its life cycle.
question
Construction Associations that offer voluntary certification programs for construction managers
answer
1. American Institute of Constructors 2. Construction Management Associated of America
question
Lean Construction
answer
Stems from manufacturing industry- Toyota Philosophy that focuses on adding value with less work and the elimination of waste in the building process
question
Six factors that must be controlled in order to ensure a successful project
answer
Cost: determined through estimate or budget, contract. Change orders, poor weather, unforeseen conditions are challenges. Goal is stay within or below estimates. Time: determined through schedule and contract. Goal is to complete tasks in timeframe set by schedule. Quality: determined through contract specifications, punch lists, inspections. Quality standards must be established early in the project. Safety: THE MOST IMPORTANT. Hazards are always present- fix them! Scope: determined by architectural program. The ultimate requirement of an owner- functional, well-built, well designed building. Function: determined by whether a project satisfies both short and long-term needs? Utilization Analysis: Efficiency of the process to be performed in the building.
question
ENR
answer
Engineering News Record
question
Agency CM
answer
Fee based service in which the construction manager is responsible exclusively to the owner and acts in the owner's best interests at every stage in the process. CM does not perform any of the actual construction
question
Architectural Programming
answer
Defining the owner's needs. The owners responsibility. What is needed to meet their needs? Who is responsible for what. Owner -; Architect ; General Contractor Engineers ; Subcontractors
question
At-Risk CM
answer
General contractor provides both pre-construction services and construction services. A project delivery method where the CM commits to deliver the project within a guaranteed maximum price. Benefits: CM is involved in the project early in the design process. Option for Value-Engineering input during the design process Constructability Review during the design process
question
Constructibility Reviews
answer
A design review process in which experienced contractors and construction managers work with designers to ensure that the details of the design actually can be built in an efficient and cost-effective manner. The process entails review of materials, application, installation techniques, field execution, and building systems.
question
Construction Management
answer
entails the planning, scheduling, evaluation, and controlling of construction tasks or activities to accomplish specific objectives by effectively allocating and utilizing appropriate labor, materials, and time resources in a manner that minimizes costs and maximizes custimer/owner satisfaction.
question
Design-Bid-Build
answer
The Traditional Method Owner hires the Architect to design the structure and produce contract documents Owner selects the General Contractor GC selects Subcontractors Characteristics Linear structure - no contractor involvement during design Owner warrants contract documents
question
Design-Build
answer
Owner contracts with the design/build entity, which is responsible for the design and construction of the project Advantages: Ability to fast-track Early contractor involvement Single point of contact
question
Fast Tracking
answer
a practice utilized to speed up a job by overlapping the design phase and the construction phase of a project. its often applied in design build or construction management project delivery.
question
Integrated Project Delivery
answer
an project delivery method that contractually engages the contractor responsible for constructing the project at the beginning of the design process. Both design-build and at risk cm are considered this method
question
Multiple Prime
answer
A contracting methodology in which the owner bypasses the use of a general contractor and enters into multiple separate contracts with trade or specialty contractors for the various sections of the work associated with the project, such as concrete, framing, mechanical, and electrical work. Each of the specialty contractors involved becomes a prime contractor on the project.
question
Scope of Work
answer
Generally defined in the Plans and Specs Sets the parameters of the project, and identifies what work needs to get done. Challenge: Ensure that the scope of the project is being delivered as intended A well defined scope sets the project in the right direction
question
Construction Management as a function: Construction Management as a project delivery method:
answer
As Function: tasks performed by contractor: estimating, scheduling, cost control, contract administration in order to monitor, manage, and control the work of the contract As Project Delivery: contractual arrangement where the construction manager is hired by the owner to provide services to the owner such as design review, overall scheduling, cost control, value engineering, constructivtbily reviews, and construction coordination
question
Three characteristics that make the construction project unique from other industry sector projects:
answer
1. One of a kind structure or facility 2. Different building site 3. building process takes place outside
question
Four Primary Project Values to be managed, monitered, controlled:
answer
1. time 2. cost 3. quality 4. safety
question
Why is the 'scope definition' so important?
answer
it describes the extent of work that is to be performed by contractor
question
Project Delivery:
answer
The overall structural or organizational framework used to put all aspects of designing and building a project together
question
Three Project Delivery Methods ; how they differ:
answer
1. Design-Bid-Build: owner has separate contracts with the designer and contractor 2. Design-Build: only one contract between owner and the design-build entity 3. Construction Management: owner holds three contracts: construction manager, designer, contractor
question
How is Agency CM different from At-Risk CM?
answer
Agency CM: construction manager has no liability for construction and acts only as an advisor to owner At-Risk: construction manager acts as an advisor to the owner during design phase and is liable for construction
question
Three ways a design-build entity may be configured:
answer
1. contractor and designer can create an informal partnership 2. full service design-build firm in which the designers and contractors work for the same company 3. or establish a legal joint venture for single project
question
Eight Functions of Construction Management:
answer
1. estimating 2. contract administration 3. managing jobsite and construction operations 4. planning ; scheduling 5. controlling performance 6. managing quality 7. managing safety 8. managing risks
question
CSI
answer
Construction Specification Institute founded in 1948 and serves all major disciplines involved in the design and construction industry. Developed CSI MasterFormat which is the standard format for construction specifications.
question
Addendum
answer
part of bidding documents
question
Change Order
answer
Errors or omissions in the contract documents results in them result in extra work and/or extra time, both of which result in extra cost to the owner. Change orders should be anticipated on any design-bid-build project.
question
Contract Documents
answer
Contract documents consist of two major components: Drawings (Plans) discuss the quantity of the work Project Manual (Specs) discuss the quality of the work In a traditional project delivery method, the contractor is typically not involved in the design or production of the contract documents.
question
GMP
answer
Guaranteed Maximum Price a variation of the cost-plus-fee contract, and is popular in design-build delivery. Owner pays cost-plus-fee, but only up to the GMP. Allows construction to start earlier since a price can be guaranteed before the plans are 100 % complete.
question
Perspective Drawings
answer
3D drawing showing height width length
question
Time and Materials
answer
Another name for cost + fee contract
question
Two components that make up contract documents:
answer
1. Drawings 2. Project Manual
question
When did artictects first begin to use drawings to communicate their design intent?
answer
the Renaissance
question
CAD
answer
Computer Aided Design
question
Order of Drawings in a Set of Plans:
answer
Civil Architectural Structural Mechanical Electrical
question
Plan View:
answer
horizontal cut through structure
question
Section View:
answer
vertical cut through structure
question
Detail
answer
Blown up picture of piece of buildinf
question
Order of importance:
answer
Specifications Details Sections Elevations Plan *specifications take precedence over all
question
Four Sections of a project manual:
answer
1. bidding documents 2. general conditions 3. supplemental conditions 4. technical specifications
question
CSI Masterformat 2004:
answer
Construction Specification Institute 48 Divisions
question
Building Insulation under which CSI division:
answer
Division 7: Thermal and Moisture Protection
question
Four Types of Construction Contracts
answer
1. Lump-Sum 2. Cost-Plus-Fee 3. Guaranteed Maximum Price (GMP) 4. Unit-Price
question
1. Lump-Sum:
answer
Most common type of contract. Contractor agrees to complete the work for a single, lump-sum fee. Contract assumes the plans and specs are accurate.
question
2. Cost-Plus-Fee:
answer
Referred to as a time ; materials contract the owner reimburses the contractor for the labor and material costs of the project plus a fixed fee or percentage of the cost. Often used when scope is hard to define. Significant risks to the owner while it guarantees the contractor a profit.
question
3. Guaranteed Maximum Price (GMP):
answer
is a variation of the cost-plus-fee contract, and is popular in design-build delivery. Owner pays cost-plus-fee, but only up to the GMP. Allows construction to start earlier since a price can be guaranteed before the plans are 100 % complete.
question
4. Unit-Price:
answer
Used when work to be performed cannot be accurately measured ahead of time. Heavy civil and highway type jobs Contractors apply a unit price to each bid item (e.g. a dollar amount per cubic yard of dirt excavation) and these unit prices are multiplied by the engineers estimate of the quantities. Engineers estimates are ballpark figures but can be very inaccurate.
question
If the actual cost is less that the guaranteed cost under a GMP contract:
answer
Owner receives the amount saved
question
Needed for estimating
answer
Point of reference
question
As-Built Drawings
answer
Completed drawings turned over to owner with changes included
question
Commissioning
answer
Process can be conducted by general contractor, subs under direction of GC, or the architect or engineers involved. Testing Training end users
question
Punch List
answer
a tool used to keep track of loose ends, minor repairs, adjustments, and missing items
question
Substantial Completion
answer
Punch list completed Architect determines facility can be utilized for intended purpose Marks the official end of project and establishes beginning of warranty period All payments due to contractor are released
question
Working Drawings
answer
final detailed drawings portion of contract document
question
Four Stages of Construction Management after design:
answer
1. Pre-Construction 2. Procurement 3. Construction 4. Post-Construction
question
Four Stages of the Design Process:
answer
1. Programming and Feasibility 2. Schematic or conceptual design 3. Design development 4. Contract documents
question
The quality of design drawings and their impact on the quality of construction:
answer
because the contractor has to build in accordance to the plans and change orders need to be submitted if there is an error. Owners would not be happy.
question
Due Diligence:
answer
Identifying any problems associated with the project early on so that those problems can be factored into decision making during pre-construction
question
Two procurement instruments used to buy out the construction job:
answer
1. Subcontracts: used to buy labor 2. Purchase Orders: used to buy materials and equipment
question
On Site Construction Management Team
answer
1. superintendent 2. assistant superintendent 3. field engineers
question
What marks the official end of a project?
answer
when the architect releases a certificate of substantial completion
question
Used to keep track of the completion of loose ends, minor repairs, adjustments, and missing items at the end of a project:
answer
a punchlist
question
Value Engineering ; its Purpose
answer
is the process of analyzing the design, products, and materials associated with the project to determine if proposed application, installation, execution is the best approach or solution purpose is to optimize resources to achieve greater value for money being spent
question
Why is it so important to have a clear distinction between the project punch out and the warranty period?
answer
the completion of punch out denotes substantial competition of project If items continually get added, it becomes difficult to mark the end of a project
question
Add-Ons
answer
Taxes, overhead, profit added into estimate after other costs have been calculated
question
Direct costs
answer
- Costs that actually go into building the facility such as materials, labor, equipment and subcontracts. "Hard"
question
Indirect costs
answer
- Expenses incurred in order to manage and deliver the materials, labor, equipment, and subcontracts employed on any job. Often referred to as overhead or general conditions and include supervision, job trailer expense, temporary utilities, testing and inspections, and job photographs, security, etc. "Soft"
question
Conceptual estimates
answer
- Used when there are no drawings at all or when you are in the idea or concept stage of a project. Often the owner does no know if they're project is feasible so they do not wish to start spending money on design.
question
Factors impacting cost
answer
Size Complexity Site location Time of construction Quality of work Market conditions Management factors: good management can minimize effect of bad estimate
question
Preliminary estimates
answer
- Used when you have a preliminary set of drawings with overall dimensions and it provides a somewhat higher level of accuracy to establish initial budgets and financing scenarios. However it should never be used to commit to a contract price.
question
Detailed estimates
answer
- Used whenever you have a complete set of plans and specs. Counts every brick and stick but as accuracy of plans/specs increases, so does the time and effort and skill that is required to complete the estimate.
question
Digitizer
answer
An electronic pen used with software to assist in quantity takeoff portion of estimating
question
Lead Time
answer
Amount of time it takes for products or equipment to be delivered to job site
question
Liquidated Damages
answer
amount of money per day the contractor is required to pay the owner if the project goes over schedule
question
Quantity Surveyors
answer
People who count up and calculate quantities of materials, labor, and equipment
question
Query List
answer
developed by estimator List of questions needing clarification
question
Scope Sheet
answer
identifies all items of work to be performed under a specific trade or category ex. masonry, siding
question
Takeoff
answer
Process of measuring plans to quantify materials, labor, equipment
question
WBS
answer
Work Breakdown Structure: establishes the basic building blocks of both the estimate and schedule. The purpose is to organize and identify the work of the project by breaking down each divisions of work into a separate work package.
question
Work Packages
answer
A work package is detailed items of work bundled together under a particular trade.
question
What is a construction estimate?
answer
summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project including taxes, overhead, profit
question
Four primary categories of cost in estimate:
answer
1. materials 2. labor 3. equipment 4. subcontracts
question
How are estimates organized?
answer
1995 CSI- 16 divisions 2004 CSI- 48 divisions
question
Type of estimate needed when meeting with a client for the first time and they wanted a rough idea about their project cost:
answer
Rough order of magnitude (ROM)
question
Four preparation steps taken to start the estimating process:
answer
1. review plans and specs 2. develop query list 3. attend prebid meeting 4. visit site
question
General Conditions:
answer
same thing as indirect costs represent expenses incurred in order to deliver and manage materials, labor, equipment, subcontracts employed on any job. supervision, cleanup, temp utilities, security fencing
question
Unit of measure used for pricing general conditions:
answer
unit of time: hour, week, or month
question
Four characteristics exhibited in a quality estimate:
answer
1. correct quantities 2. accurate labor hours 3. correct pricing 4. completeness 5. clear paper trail 6. proper overhead 7. proper profit 8. accurate calculations
question
When will you know the true accuracy of your estimate?
answer
when the project is complete and costs and expenses have been added up.
question
Backward Pass
answer
begins at project must finish date and tells you the latest an activity can start and end to finish on time late dates
question
Critical Path
answer
a continuous chain of activities with the longest (combined) overall duration in the network diagram. Critical to mangament because the critical path determines project duration and any delays along the way
question
Float/Slack
answer
the amount of time that an activities start can be delayed without impacting completion date
question
Forward Pass
answer
begins at start date and determines the earliest an activity can start or finish early dates
question
Gantt Chart
answer
Uses bars to show the length of each activity Advantages: Easy to understand and follow because it relates durations to calendar days Disadvantage: Doesn't show relationships between activities
question
Network Diagrams
answer
CPM (critical path method) Advantages: Shows activity relationships and durations Disadvantages: Don't provide the visual clarity that Gantt Charts provide
question
Network Logic
answer
you determine what activities must take place, what order they will take place this results in network logic
question
Precedence Diagramming
answer
AON Network Diagram
question
Short-Interval Schedules
answer
LOOK AHEAD SCHEDULES usually 3 weeks acts as a work plan for crew on site
question
Special Purpose Schedule
answer
Keep track of activities that support the work Delivery schedules Submittal schedules Inspection schedules
question
Most common types of schedules:
answer
1. Gantt Chart (bar) 2. Network Diagram
question
Techniques used to create network diagram:
answer
1. AOA- activity on arrow: Activity is on the Arrow and nodes show relationships Nodes between activity arrows show the start and end of the connected activities 2. AON- activity on node Activity is noted on the node and the arrows show relationships Most commonly used during sequencing stage
question
Another term for AON
answer
Activity on Node Diagram or Precedence diagram MOST COMMONLY USED
question
Lookahead Schedule
answer
developed by superintendents and trade foremen to coordinate the work and activities over a short period of time (two weeks to a month) often hand drawn distributed to specific trades
question
Three stages of network diagram development
answer
1. planning 2. sequencing 3. scheduling
question
Types of Activities included in schedule
answer
Production: installing siding Procurement: ordering windows Administrative: obtaining building permits
question
Three scheduling activities needed to create critical path and duration
answer
1. Forward Pass 2. Backward Pass 3. Total Float Calculations
question
Which activities are on critical path
answer
activities with no float are on the critical path
question
Cost Code
answer
reference number assigned to each work activity based on CSI division and type of cost
question
Cost Control
answer
Monitoring process used to track variances between actual and planned performance
question
Crashing the Schedule
answer
compressing the overall schedule by accelerating certain activities within it so that they finish sooner
question
Earned Value Analysis
answer
used to determine estimated value of work completed and make sure it is inline with the actual work completed
question
Escalation Clause
answer
a special time clause negotiated in contract when there is suspicion that some pricing component is in a high state (flux). This clause allows for adjustments to be made to the estimate upon current pricing.
question
Forecast
answer
periodic predictions of final costs and scheduling
question
Variance
answer
Different between actual projects and planned performance
question
Seven Steps in Project Control Cycle
answer
1. develop project plan 2. establish benchmarks 3. monitor performance 4. identify performance deviations 5. evaluate corrective options (working 2 shifts/longer hours) 6. make adjustments 7. document, report, evaluate results
question
Two essentials of project control system
answer
1. information 2. good reporting system
question
Three sources used to gather field information needed to develop project control
answer
1. material invoices 2. time cards 3. subcontractor billing statements
question
Two CM functions needed to receive accurate and complete information from job site
answer
1. field information 2. historical estimating databses
question
How is a cost code used
answer
used to track all items of work contributing to overall project costs
question
Three Factors that can impact project performance
answer
1. weather 2. quality of workforce 3. inadequate tools 4. defective models 5. overcrowded job sites
question
Riskiest element of project planning and control
answer
estimating productivity
question
What does it mean to forecast in construction- regarding project controls
answer
to predict the final costs and schedule outcomes on a project while work is still in progress. Construction managers forecast final cost and competition dated on regularly
question
BIM Model
answer
Building Information Modeling -a digital representation of the physical and functional characteristics of a building displayed as 3D model
question
Clash detention
answer
process for effectively identifying unintended material or system interferences in a 3D model
question
Central repository approach
answer
Ideal- not practical All project information can be loaded into one database to create single BIM model
question
Construction model
answer
Contains construction specific information: cost & scheduling data
question
Design-intent model
answer
Focuses on communication design information through 3D model
question
Distributed repository approach
answer
BIM model consists of a collection of separate databases maintained within distinct programs
question
Interoperability
answer
the biggest challenge in the industry. the capability of a system to interaction with other systems without limitations or restrictions
question
Virtual Construction
answer
process in which a builder simulates, analyses, and plans a building project in a computerized environment before and during the actual construction process to try to avoid problems and accurately predict detailed costs, schedules and physical outcomes.
question
Difference between 3D CAD and BIM
answer
A BIM Model is attached to a database that holds all pertinent information about the objects that make up a project. A 3D CAD model is not linked to any database.
question
4D BIM
answer
scheduling (time)
question
5D BIM
answer
estimating (cost)
question
Ways contractors use BIM (10)
answer
1. design visualization 2. design assistance & constructibilyt review 3. operations and maintenance 4. site planning & utilization 5. 4D scheduling 6. 5D estimating 7. integration of subcontractor and supplier data 8. systems coordination 9. layout and fieldwork 10. prefabrication
question
Stereoscopic Projection
answer
3D video display of a computer-generated virtual reality environment