chapter 12 final – Flashcards

Unlock all answers in this set

Unlock answers
question
Which of the following most closely describes dependent demand? A. demand generated by suppliers B. estimates of demand using regression analysis of independent variables C. derived demand D. demands placed on suppliers by their customers E. net material requirements
answer
derived demand
question
ERP implementation probably won't require: A. cross functional teams B. just a few weeks to install C. intensive training D. high funding for both initial cost and maintenance E. frequent upgrades after installation
answer
just a few weeks to install
question
A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is: A. computer aided manufacturing (CAM) B. computer integrated manufacturing (CIM) C. economic order quantity (EOQ) D. material requirements planning (MRP) E. economic run size (ERS)
answer
material requirement planning
question
The development and application of MRP depended upon two developments: (1) the recognition of the difference between independent and dependent demand, and (2): A. computers B. development of the EOQ model C. inventory control systems D. blanket purchase orders E. the internet
answer
computers
question
The output of MRP is: A. gross requirements B. net requirements C. a schedule of requirements for all parts and end items D. inventory reorder points E. economic order quantities and reorder points
answer
a schedule of requirements for all parts and end items
question
Which one of the following is not an input in an MRP system? A. planned-order schedules B. bill of materials C. master production schedule D. inventory records E. All are inputs.
answer
planned order schedules
question
The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the: A. master schedule B. bill-of-materials C. inventory-records D. assembly-time chart E. net-requirements chart
answer
master schedule
question
. In an MRP master schedule, the planning horizon is often separated into a series of times periods called: A. pegging B. lead times C. stacked lead times D. time buckets E. firm, fixed and frozen
answer
time buckets
question
The MRP input listing the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product is the: A. master production schedule B. bill-of-materials C. inventory-records D. assembly-time chart E. net-requirements chart
answer
bill of materials
question
A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n): A. assembly time chart B. product structure tree C. MRP II D. pegging E. Gantt chart
answer
product structure tree
question
The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the: A. master production schedule B. bill-of-materials C. inventory-records D. assembly-time chart E. net-requirements chart
answer
inventory records
question
Which one of the following most closely describes net material requirements? A. gross requirements - amount on-hand - scheduled receipts B. gross requirements - planned receipts C. gross requirements - order releases + amount on-hand D. gross requirements - planned order releases E. gross requirements - amount on-hand + planned order releases
answer
gross requirements- amount on hand- scheduled receipts
question
In MRP, "scheduled receipts" are: A. identical to "planned-order receipts" B. identical to "planned-order releases" C. open orders (that is, ordered before the first time bucket, but not delivered yet) D. "net requirements" E. available to promise inventory
answer
open orders(that is, ordered before the first time bucket)
question
In MRP, under lot-for-lot ordering, "planned-order receipts" are: A. identical to "scheduled receipts" B. identical to "planned-order releases" C. open orders (that is, ordered before the first time bucket, but not delivered yet) D. "gross requirements" E. available to promise inventory
answer
identical to planned order release
question
Under lot-for-lot, order sizes for component parts are essentially determined directly from which one of the following? A. gross requirements B. net requirements C. economic order quantity D. gross requirements - net requirements E. net requirements - amount on-hand
answer
net requirements
question
In MRP, the gross requirements of a given component part are calculated from: A. net requirements + amount on-hand. B. gross requirements of the immediate parent. C. planned orders of the end item. D. net requirements of end item. E. planned orders of the immediate parent.
answer
panned orders of the immediate parent
question
The identification of parent items is called: A. Paternity B. Pegging C. Requirement I.D. D. Relationship tracking E. Master Scheduling
answer
pegging
question
Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called: A. pegging B. planned order release C. net change D. regenerative E. exception report
answer
regenerative
question
An MRP system whose records are updated continuously is referred to as a(n): A. regenerative system B. batch-type system C. Plossl-Wright system D. net-change system E. gross-change system
answer
net-change system
question
Which is true of a net-change system? A. It is a batch-type system which is updated periodically. B. It is usually run at the beginning of each month. C. The basic production plan is modified to reflect changes as they occur. D. It is used to authorize the execution of planned orders. E. It indicates the amount and timing of future changes.
answer
the basic production plan is modified to reflect changes as they occur
question
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time? A. pegging B. safety stock C. increased order sizes D. safety time E. low-level coding
answer
safety time
question
Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs? A. economic order quantity B. economic run size C. lot-for-lot D. part-period E. all of the above
answer
lot for lot
question
When MRP II systems include feedback, they are known as: A. MRPIII B. Enterprise resource planning C. Circular MRP D. Feasible MRP E. Closed Loop MRP
answer
closed loop MRP
question
The multiplication process used by MRP to determine lower level requirements is called: A. time-phasing B. pegging C. netting D. projecting E. exploding
answer
exploding
question
_______ is choosing how many to order or make. A. Quantity determination B. Package sizing C. Lot sizing D. Grouping E. Aggregation
answer
Lot sizing
question
Which of the following is not usually necessary in order to have an effective MRP system? A. a computer and software B. an accurate bill of materials C. lot-for-lot ordering D. an up-to-date master schedule E. integrity of file data
answer
lot for lot ordering
question
The _________ of ERP makes it valuable as a strategic planning tool. A. Internet base B. Rapid Batch capability C. Employee focus D. Real-time aspect E. Database structure
answer
real time aspect
question
A recent effort to expand the scope of production resource planning by involving other functional areas in the planning process has been: A. material requirements planning B. capacity requirements planning C. manufacturing resources planning D. Just-In-Time planning E. multifunctional relationships planning
answer
manufacturing respouces planning
question
Which statement concerning MRP II is false? A. It is basically a computerized system. B. It can handle complex planning and scheduling quickly. C. It involves other functional areas in the production planning process. D. It involves capacity planning. E. It produces a production plan which includes all resources required.
answer
it produces a production plan which includes all resources required
question
Which of these items would be most likely to have dependent demand? A. Xbox batteries B. toy trains C. flowers D. chocolate chip cookies E. wrist watches
answer
xbox batteries
question
Which of these products would be most likely to have dependent demand? A. refrigerators B. automobile engines C. televisions D. brownies E. automobiles
answer
automobile engines
question
If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed? A. 8 B. 16 C. 136 D. 204 E. 272
answer
272
question
If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed? A. 48 B. 144 C. 192 D. 212 E. 272
answer
192
question
If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed? A. 340 B. 350 C. 380 D. 400 E. 590
answer
350
question
Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Selzer is included for those who overindulge. 81. What is the net requirement for Dark Chocolate Truffles to fill this order? A. 100 B. 140 C. 150 D. 180 E. 200
answer
150
question
When should an order for Carved Chocolate Eggs be released? A. at the start of week 2 B. at the start of week 3 C. at the start of week 4 D. at the start of week 5 E. at the start of week 6
answer
at the start of week 2
question
How many Dark Chocolate Eggs should be ordered? A. 310 B. 450 C. 500 D. 550 E. 600
answer
310
question
f the firm is using a fixed period lot size of two periods, what is the order size for the first order? A. 120 B. 200 C. 280 D. 160 E. 150
answer
200
question
Which of the following represents an attempt to balance the benefits of stability against the benefits of responding to new information? A. safety stock B. safety time C. bills of material D. time fences E. fixed-period lot sizing
answer
time fences
question
Comparing known and expected capacity requirements with projected capacity availability is the job of _______. A. planned releases B. load reports C. lot sizing D. work loading E. time fencing
answer
load reports
question
ERP's primary value comes from applications ________. A. deployment B. development C. interfaces D. integration E. networking
answer
integration
question
Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5. If a fixed-period, two-period lot-sizing method is used, what will be the quantity of the first planned receipt? A. 60 units B. 120 units C. 180 units D. Cannot be determined E. None of the above
answer
none of the above
question
Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5. If a fixed-period, three-period lot-sizing method is used, what will be the quantity of the first planned receipt? A. 60 B. 100 C. 160 D. Cannot be determined E. None of the above
answer
100
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New