ch2-c – Flashcard

Unlock all answers in this set

Unlock answers
question
​Given a project schedule with all tasks connected via one way arrows and with task durations. The critical path is ______.
answer
the longest path through the network
question
The P in the FURPS acronym stands for
answer
performance requirements
question
Sometimes a narrative description is the best form to use for recording information.​
answer
true
question
Which of the following equations is correct for calculating early start time?
answer
ESn + 1 = ESn + duration + lagtime
question
_______ is an important part of the follow-up after an interview.​
answer
building models
question
Which of the following is also referred to as the breakeven point?
answer
payback period
question
Which of the following statements is correct about questionnaires?​
answer
Questionnaires have a limited and specific use in information gathering
question
The first and most important step in preparing for an interview is to determine who should be involved.​
answer
False
question
The group that provides direction for the configuration of the new system in the existing computing environment are called _______.​
answer
Technical stakeholders
question
What does the Acronym UML stand for?​
answer
unified modeling language
question
One important reason for prioritizing requirements is to _______.​
answer
avoid scope creep
question
Setting up a change control log to keep track of new system requirements is part of what PMBOK area?
answer
scope management
question
​The earliest time that a task can start on a project schedule is called its
answer
early start time
question
Good Project Communication Management requires techniques in three important areas: (1) gathering information (2) disseminating information and (3) ________ .
answer
managing internal communications
question
Use case diagrams, class diagrams, sequence diagrams are all examples of standard modeling method?​
answer
UML
question
What do we call the person or group who provides funding for the development of the new system?​
answer
client
question
One of the dangers in researching vendor solutions is that users and analysts _______.​
answer
many want to buy one of these solutions prematurely
question
_______ requirements are based on the procedures and rules that the organization uses to run its business.​
answer
Functional
question
A split screen in Microsoft Project is an effective way to ______ .
answer
view both summary information and detailed task information
question
Clients play what role in the development of the new system?​
answer
fund the project
question
---- requirements describe constraints such as programming languages, tools, and communication protocols for distributed portions of the system.​
answer
implementation
question
A series of formulas that describe technical aspects of a system is a(n)_____ model.​
answer
mathematical
question
A representation of some aspect of the system being built is a _______.​
answer
model
question
In Microsoft Project a task that indicates the completion of a deliverable or some other completion item is called a --- task.
answer
milestone
question
Which of the following equations represents the present value (PV) of a discounted future amount (FA) at a discount rate (i) for multiple periods (n)?
answer
PV = FA(1+i)n
question
​In Microsoft Project calculating and assigning the duration time to a summary task is usually fairly complex.
answer
false
question
​In Microsoft Project a PERT/CPM chart view is called a
answer
network
question
Questionnaires can be used to ask questions that _______.​
answer
determine user options
question
The objective of ____ is to determine a specific value based on a predetermined discount rate.
answer
net present value (NPV)
question
Payback period is usually calculated for the same time period as the discount rate is applied.
answer
false
question
Core Process 3 involves defining in great detail what the information system needs to accomplish in order to provide the organization with the desired benefits.​
answer
true
question
​A project manager has purchased some training classes for JAVA programming for new members of his team. This would be considered to be part of which PM management area?
answer
human resource management
question
It is a good idea to observe user processes so that the analyst will know exactly how to build the functions into the new system.​
answer
false
question
The annual percentage rate that an amount of money is discounted to bring to a present value is called the
answer
discount rate
question
​The most common way to determine the discount rate for NPV calculations is by _____.
answer
using company policy
question
One way to show multiple, independent alternative paths within an activity diagram is with a _______.​
answer
decision diamond
question
​In a PERT/CPM chart when several tasks are in sequence to form a path segment but are not on the critical path the total slack time is _____?
answer
the same for each one
question
Questions that encourage discussion are called ---- questions
answer
open-ended
question
---- requirements describe operational characteristics related to measures of workload such as throughput and response time.​
answer
performance
question
If the analysts understand the major business processes, it is not usually necessary to create a comprehensive list of all business processes.​
answer
false
question
What type of stakeholders are those that do not use the system on day to day tasks, but use information, such as reports, from the system.​
answer
executive stakeholders
question
During a fact-finding interview, an important guideline is ____.​
answer
to probe to get sufficient details
question
To determine a percentage return on an initial investment, which of the following techniques should be used?
answer
return on investment
question
​The three techniques used for Scope Management are Defining the scope, _______ , and Controlling the scope.
answer
verifying the scope
question
A good way to remember the details of an interview is to use a tape recorder.​
answer
false
question
In a PERT/CPM chart the lag time represents _____.
answer
a dead time between tasks
question
Which two of the following are activities of Core Process 3?
answer
gather detailed information, develop user-interface dialogs
question
Workflows can be documented using _______.​
answer
activity diagrams
question
Reviewing existing documentation is a good idea for analysts because it is a dependable source of accurate policies and procedures.​
answer
false
question
Diagrams and schematic representations of some aspect of a system are examples of a ______ model.​
answer
graphical
question
​The amount of time a task or sequence of tasks can be delayed without impacting the project is called the
answer
slack time
question
The first step in NPV calculations is to determine the discount rate.
answer
true
question
A synchronization bar in an activity diagram allows multiple agents or actors to participate in a workflow in separate rows.​
answer
false
question
The term "I'll know it when I see it" applies to one valid way to get requirements definition.​
answer
true
question
One way to show concurrent paths within an activity diagram is with a
answer
synchronization bar
question
In the RMO CSMS project, customers are not considered stakeholders because it is not feasible to interview them or use them in the project activities.​
answer
false
question
Questionnaires can be useful in information gathering when users _____.​
answer
are widely distributed geographically
question
​In Microsoft Project a PERT/CPM chart view is called a ---- diagram
answer
network
question
When observing business processes, it is not necessary to observe all the processes at the same level of detail.
answer
true
question
Persons within an organization who have a significant interest in its operation are ----- stakeholders
answer
internal
question
---- equirements describe the dependability of a system such as service outages and incorrect processing.​
answer
Reliability
question
​In Microsoft Project a Tracking Gantt chart is useful to keep track of the resources on a project.
answer
false
question
The strength of closed-ended questions is that they ____.​
answer
limit answers to a set of choices
question
The "+" in FURPS+ includes which of the following types of requirements?
answer
supportability requirements, design constraints
question
Which of the following items is NOT a part of the application architecture?​
answer
virtual private networks
question
Every successful interview requires ____.​
answer
preparation
question
Which of the following equations represents the present value (PV) of a discounted future amount (FA) at a discount rate (i) for multiple periods (n)?
answer
PV = FA /(1+i)n
question
Which of the following equations represents the present value (PV) of a discounted future amount (FA) at a discount rate (i) for multiple periods (n)?
answer
PV = FA / (1+i)n
question
Beginning analysts often underestimate how much there is to learn about the work the users perform.​
answer
true
question
---- requirements describe how access to the software application will be controlled and data will be protected.​
answer
security
question
Persons outside an organization's control who interact with the system or who have an interest in its operation are called ---- stakeholders
answer
external
question
Core Process 3 is called "Discover and understand details." Another term that is used to describe these activities is ---- activities
answer
analysis
question
Looping in an activity diagram is best represented using what?​
answer
synchronization bars
question
​The annual percentage rate that an amount of money is discounted to bring to a present value is called the -----
answer
discount rate
question
Systems analysis involves the creation of logical models.​
answer
true
question
A decision point within an activity diagram may be shown with an activity symbol.​
answer
true
question
Two benefits of researching vendor solutions include _______ and ______.
answer
helping analysts discover state of the art solutions, helping users generate new ideas for business functions
question
Which of the following is normally the most time-consuming and resource-expensive operation?​
answer
interview stakeholders
question
---- requirements describe how a system is configured, monitored, maintained, and updated.​
answer
supportability
question
The most important step in preparing for an interview is to _______.​
answer
establish an objective
question
Asking about error conditions usually is done in later interviews after the analyst understands and documents the basic processing requirements.​
answer
false
question
​The accumulation of yearly discounts based on a discount rate is called the ----
answer
discount factor
question
​Which of the following equations is correct for calculating early start time?
answer
ESn+1 = ESn + duration + lagtime
question
It is a good idea to observe user processes so that the analyst will know exactly how to build the functions into the new system.​
answer
false
question
The U in the FURPS acronym stands for ----
answer
usability
question
The S in the FURPS acronym stands for _______.​
answer
security requirements
question
The most important and first step in preparing for an interview with a user is to establish the ----- of the interview
answer
objective
question
What are the two primary benefits of reviewing the documentation of existing inputs, outputs, and procedures
answer
Obtain a preliminary understanding, serve as visual aids in interview discussions
question
As part of the interview process, any unresolved issues should be _______.​
answer
put on an open-items list
question
____ is an important part of each interview.​
answer
follow-up
question
In order to show all the activities of a single agent or organizational unit together, a activity diagram contains what construct?​
answer
swimlane
question
​The three techniques used for Scope Management are Defining the scope, _______ , and Controlling the scope.
answer
verifying the scope
question
The term "I'll know it when I see it" refers to what method of requirements definition.​
answer
collecting active user comments
question
FURPS and FURPS+ are synonymous.​
answer
false
question
Before gathering detailed information, and analyst identifies every type of stakeholder.​
answer
true
question
Persons who regularly interact with the system as part of their jobs are called _______.​
answer
operational
question
----- requirements describe operational characteristics related to measures of workload such as throughput and response time.​
answer
Performance
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New