SDSU MIS 302 CH. 3 Project Management – Flashcards

Unlock all answers in this set

Unlock answers
question
The Management of Projects involves 3 phases
answer
1. Planning: This phase includes goal setting, defining the project, and team organization 2. Scheduling: this phase relates people, money, and supplies to specific activities and relates activities to each other 3. Controlling: Here the firm monitors resources, costs, quality, and budgets. It also revises or changes plans and shifts resources to met time and cost demands.
question
The Management of Projects involves 3 phases
answer
Planning, Scheduling, Controlling
question
Planning
answer
This phase includes goal setting, defining the project, and team organization
question
Scheduling
answer
this phase relates people, money, and supplies to specific activities and relates activities to each other
question
Controlling
answer
Here the firm monitors resources, costs, quality, and budgets. It also revises or changes plans and shifts resources to met time and cost demands.
question
Project Organization
answer
An organization formed to ensure that programs (projects) receive the proper management and attention
question
Projects can be defined as
answer
a series of related tasks directed toward a major output
question
The Project organization may be most helpful when:
answer
1. Work tasks can be defined with a specific goal and deadline 2. The job is unique or somewhat unfamiliar to the existing organization 3. The work contains complex interrelated tasks requiring specialized skills 4. The project is temporarily but critical to the organization 5. The project cuts across organizational lines.
question
Planning the project (before project)
answer
Set the goals (time, cost, performance), define the project, develop work breakdown structure, identify team resources
question
Scheduling the Project
answer
sequence activities, assign people, schedule deliverables, schedule resources
question
Controlling the Project (during project)
answer
monitor resources, costs, quality; revise and change plans; shift resources
question
Project managers are responsible for
answer
1) making sure all necessary activities are finished in proper sequence and on time 2)making sure the project comes in within budget 3)making sure the project meets its quality goals 4)making sure the people assigned to the project receive the motivation, direction, and information needed to do their jobs Project managers should be good coaches and communicators, and be able to organize activities from a variety of disciplines
question
Ethical issues Project Managers deal with
answer
1) offers of gifts from contractors 2) pressure to alter status reports to mask the reality of delays 3) false reports for charges of time and expenses 4) pressures to compromise quality to meet bonuses or avoid penalties related to schedules
question
Work Breakdown Structure (WBS)
answer
a hierarchal description of a project into more and more detailed components
question
Work breakdown levels
answer
1) project 2) Major tasks in the project 3) Subtasks in major tasks 4) Activities (or "work packages") to be completed
question
Gantt Charts
answer
one popular project scheduling approach is this. they are planning charts used to schedule resources and allocate time. they help managers make sure that (1) activities are planned, (2) order of performance is documented, (3) activity time estimates are recorded, and (4) overall project time is developed
question
Gantt charts do not adequately illustrate the interrelationships between the activities and the resources
answer
yeah
question
PERT and CPM, the two widely used network techniques, do have the ability to consider precedence relationships and interdependency of activities
answer
yeah
question
PERT and CPM have and edge over the simpler Gantt charts
answer
yep
question
Project scheduling serves several purposes
answer
1) it shows the relationship of each activity to others and to the whole project 2) it identifies the precedence relationships among activities 3) it encourages the setting of realistic time and cost estimates for each activity 4) it helps make better use of people, money, and material resources by identifying critical bottlenecks in the project
question
PERT/CPM programs like HP Project, Microsoft Project, etc produce a broad variety of reports including
answer
1 detailed cost breakdowns 2 total program labor curves 3 cost distribution tables 4 functional cost and hour summaries 5 raw material and expenditure forecasts 6 variance reports 7 time analysis reports 8 work status reports
question
PERT stands for
answer
Program evaluation and review technique
question
Program evaluation and technique (PERT)
answer
a project management technique that employs three time estimates for each activity
question
CPM stands for
answer
Critical Path Method
question
Critical Path Method (CPM)
answer
A project management technique that uses only one time factor per activity
question
both PERT and CPM were developed in 1950's. CPM arrived first, and PERT developed in 1958 for US Navy
answer
yeah
question
PERT AND CPM both follow 6 BASIC STEPS
answer
1 - define the project and prepare the work breakdown structure 2 - develop the relationships among the activities. decide which activities must precede and which must follow others 3 - draw the network connecting all the activities 4 - assign time and/or cost estimates to each activity 5 - compute the LONGEST time path through the network. this is called the CRITICAL PATH 6 - use the network to help plan, schedule, monitor, and control the project
question
Critical Path
answer
the computed LONGEST time path(s) through a network. tasks on this path must be completed on time. no slack allowed.
question
The major difference between PERT and CPM is that PERT employes 3 time estimates for each activity
answer
yeah
question
PERT AND CPM differ in terminology and in the construction of the network, but their objectives are the SAME
answer
yea pretty much
question
PERT AND CPM can help answer these questions
answer
1 - when will the entire project be completed? 2 - what are the critical activities or tasks in the project-that is, which activities will delay the entire project if they are late? 3 - Which are the noncritical activities - the ones that can run late without delaying the whole project's completion 4 - what is the probability that the project will be completed by a specific date? 5 - at any particular date, is the project on schedule, behind schedule, or ahead of schedule? 6 - on any given date, is the money spent equal to, less than, or greater than the budgeted amount? 7 - are there enough resources available to finish the project on time? 8 - if the project is to be finished in a shorter amount of time, what is the best way to accomplish this goal at the least cost?
question
Activity-on-node (AON)
answer
A network diagram in which nodes designate activities
question
Activity-on-arrow (AOA)
answer
A network diagram in which arrows designate activities
question
The basic difference between AON and AOA is that the nodes in an AON diagram represent activities. In an AOA network, the nodes represent the starting and finishing times of an activity and are also called EVENTS. So nodes in AOA consume neither time nor resources.
answer
yea
question
Critical Path Analysis
answer
a process that helps determine a project schedule
question
Earliest Start (ES)
answer
earliest time at chichi an activity can start, assuming all predecessor have been completed
question
Earliest Finish (EF)
answer
earliest time at which any activity can be finished
question
Latest Start (LS)
answer
latest time at which an activity can start so as to not delay the completion time of the entire project
question
Latest Finish (LF)
answer
latest time by which an activity has to finish so as to not delay the completion time of the entire project
question
ES and EF are determined during the forward pass and the LS and LF are determined during the backward pass
answer
yeah
question
Forward Pass
answer
a process that identifies all the early times
question
Before any activity can start, ALL its immediate processors must be finished
answer
duh
question
If an activity has only a single immediate predecessor, its ES equals the EF of the predecessor
answer
yeah
question
If an activity has multiple immediate predecessors, its ES is the maximum of all EF values of its predecessors. That is: ES = Max (EF of all immediate predecessors)
answer
yeah
question
Earliest Finish Time Rule: the earliest finish time EF of an activity is the sum of its earliest start time (ES) and its activity time. That is: EF = ES + Activity time
answer
Yep
question
Backward Pass
answer
An activity that finds all the late start and late finish times
question
Latest Finish Time Rule
answer
- If an activity is an immediate predecessor for just a single activity, its LF equals the LS of the activity that immediately follow it - If an activity is an immediate predecessor to more than one activity, its LF is the minimum of all LS values of all activities that immediately follow it. That is: LF = Min(LS of all immediate following activities)
question
Latest Start Time Rule
answer
The latest start time (LS) of an activity is the difference of its latest finish time (LF) and its activity time. That is: LS = LF - Activity time
question
Slack Time
answer
Free time for an activity. Also referred to as free float or free slack
question
Slack Equation
answer
LS - ES or LF - EF
question
The activities with zero slack are called
answer
CRITICAL ACTIVITIES
question
The critical path is a continuous path through the project network that:
answer
starts at the first activity in the project terminates at the last activity in the project includes only critical activities (with no slack time)
question
When two or more noncritical activities appear successively in a path, they share total slack
answer
yea, true
question
The 3 time estimates in PERT
answer
Optimistic Time (a) Pessimistic Time (b) Most Likely Time (m)
question
Optimistic Time (a)
answer
time an activity will take if everything goes as planned. In estimating this value, there should be only a small probability (say, 1/100) that the activity will be < a
question
Pessimistic Time (b)
answer
time an activity will take assuming very unfavorable conditions. In estimating this value, there should also be only a small probability (also 1/100) that the activity time will be > b
question
Most Likely Time (m)
answer
most realistic estimate of the time required to complete an activity
question
To find the expected activity time, t, the beta distribution weights the three time estimates as follows:
answer
t = (a + 4m + b)/6
question
To compute the dispersion or variance of activity completion time, we use the formula
answer
Variance = [ (b - a) / 6 ] squared
question
PERT makes two assumptions
answer
1) total project completion times follow a normal probability distribution and 2) activity times are strategically independent
question
Crashing
answer
Shortening activity time in a network to reduce time on the critical path so total completion time is reduced.
question
We can shorten an activity by adding extra resources (equipment, people) to it. Hence, it is logical for the crash cost of an activity to be higher than its normal cost.
answer
yea, true
question
When choosing which activities to crash, and by how much, we need to ensure the following:
answer
- The amount by which an activity is crashed is, in fact, permissible - taken together, the shortened activity durations will enable us to finish the project by the due date - the total cost of crashing is as small as possible
question
Crashing a project involves 4 steps
answer
Step 1: compute the crash cost per week (or other time period) for each activity in the network. If crash costs are linear over time, the following formula can be used crash cost per period = (crash cost - normal cost / normal time - crash time) Step 2: using the current activity times, find the critical paths in the project network. Identify the critical activities Step 3: If there is only one critical path, then select the activity on this critical path that (a) can still be crashed and (b) has the smallest crash cost per period. Crash this activity by one period. If there is one critical path, then select one activity from each critical path such that (a) each selected activity can still be crashed and (b) the total crash cost per period of all selected activities is the smallest. Crash each activity by one period. Note that the same activity may be common to more than one critical path. Step 4: Update all activities. If the desired due date has been reached, stop. If not, return to step 2.
question
Advantages of PERT
answer
1. especially useful when scheduling and controlling large projects. 2. straightforward concept and not mathematically complex 3. graphical networks help highlight relationships among project activities 4. critical path and slack time analyses help pinpoint activities that need to be closely watched. 5. project documentation and graphs point out who is responsible for various activities. 6. applicable to a wide variety of projects 7. useful in monitoring not only schedules but costs as well.
question
Limitations of PERT
answer
1. project activities have to be clearly defined, independent, and stable in their relationships. 2. Precedence relationships must be specified and networked together 3. time estimates tend to be subjective and are subject to fudging by managers who fear the dangers of being overly optimistic or not pessimistic enough 4. there is the inherent danger of placing too much emphasis on the longest, or critical, path. Near-critical paths need to be monitored closely as well.
question
Perhaps the biggest advantage of using software to manage projects is that it can track the profess of the project.
answer
yep
question
Project organization
answer
an organization formed to ensure that programs (projects) receive the proper management and attention
question
(WBS) Work breakdown structure
answer
Defines a project by dividing it into more and more detailed components
question
Project scheduling serves several purposes:
answer
1) is shows the relationship of each activity to others and to the whole project 2) it identifies the precedence relationships among activities 3) It encourages the setting of realistic time and cost estimates for each activity 4) it helps make better use of people, money, and material resources by identifying critical bottlenecks in the project
question
Computerized programs produce a broad variety of PERT/CPM reports, including:
answer
1) detailed cost breakdowns for each task, 2) total program labor curves, 3) cost distribution tables, 4) functional cost and hour summaries, 5) raw material and expenditure forecasts, 6) variance reports, 7) time analysis reports, and 8) work status reports
question
PERT and CPM both follow 6 basic steps
answer
yea, true
question
The activities on the critical path will delay the entire project if they are not completed on time
answer
yea, true
question
Activity on node AON
answer
network diagram - nodes designate activities
question
Activity on arrow AOA
answer
network diagram - arrows designate activities
question
In an AOA network, the nodes represent the starting and finishing times of an activity and are also called EVENTS
answer
yep
question
Dummy Activity
answer
an activity having no time that is inserted into a network to maintain the logic of the network
question
A Dummy ending activity can be added to the end of an AON diagram for a project that has multiple ending activities
answer
yep
question
Critical Path Analysis
answer
a process that helps determine a project schedule.
question
To calculate the critical path, we calculate two district starting and ending times for each activity:
answer
Earliest Start (ES) - earliest time at which an activity can start, assuming all predecessors have been completed Earliest finish (EF) - earliest time at which an activity can be finished Latest start (LS) - latest time at which an activity can start, without delaying the completion time of the entire project Latest finish (LF) - latest time by which an activity has to finish so as to not delay the completion time of the entire project
question
Forward Pass
answer
a process that identifies all the early start and early finish times ES = Max {EF of all immediate predecessors} EF = ES + Activity Time
question
backward pass
answer
a process that identifies all the late start and late finish times LF = Min {LS of all immediate following activities} LS = LF - Activity Time
question
Free time for an activity
answer
Slack Time
question
LS - ES or LF - EF
answer
Slack Time equation
question
the activities with zero slack time are called _______ ______ and are said to be on the critical path
answer
critical activities
question
a continuous path through the project network that starts at the first activity in the project, terminates at the last activity in the project, and includes only critical activities
answer
critical path
question
(a)
answer
Optimistic Time
question
Optimistic Time (a)
answer
the "best" activity completion time that could be obtained in a PERT network
question
Pessimistic time (b)
answer
the "worst" activity time that could be expected in a PERT network
question
Most likely time (m)
answer
the most probable time to complete an activity in a PERT network
question
Expected activity time (t)
answer
t = (a +4m +b)/6
question
Shortening activity time in a network to reduce time on the critical path so total completion time is reduced
answer
crash cost per period = Crash cost - normal cost ------------------------------- Normal time - crash time