3D072 CDC – Flashcard

Unlock all answers in this set

Unlock answers
question
Which deployment planning process develops predetermined responses to potential crises, determines forces required to achieve objectives, prepares deployment plans, and continually evaluates selected courses of action? (COA)
answer
Deliberate Planning
question
Which War and mobilization plan (WMP) volume provides a consolidated reference source for general policies and guidance for mobilization planning and the support of combat forces in time of war?
answer
Volume 1
question
Who initiates the requirements for deployment sourcing process?
answer
AFPC, AEF
question
Which type of joint expeditionary tasking (JET) tasking is a service providing a force or capability in place of another service's core mission?
answer
Joint force/capability
question
Which is not an area measured and reported by Status of Resources and Training System (SORTS)
answer
Facility condition
question
Which of the following is not a readiness category measured by Air and Space Expeditionary Force Reporting Tool? (ART)
answer
Home station mission
question
The governing guidance for Air and Space Expeditionary Force Reporting Tool (ART)
answer
10-244
question
Which document provides detailed information and instructions on Designated Operational Capability (DOC) statements?
answer
AFI-10-201
question
Who develops logistics details (LOGDETS) to allow for 30 days of sustainment for unit type codes?
answer
Pilot Units
question
Which is not an initial capability of the open the airbase force module?
answer
Explosive Ordinance Disposal (EOD)
question
The key capabilities for establishing control of the command and control module are
answer
secure communications and intelligence
question
Which force module facilitates integration of open the airbase and command and control force module capabilities to enable the airfield to generate air support to accomplish its assigned mission?
answer
Establish the airbase
question
Within how many days after open the airbase does the operate the airbase force module arrive, and when is delivery estimated to be complete?
answer
2 days, 14 days
question
Which force module contains support forces that would generally not arrive until 30 days after the deployed location is established
answer
Robust the airbase
question
The contingency response wing headquarters is located at
answer
Joint base McGuire-Dix
question
What is the typical pay grade of the deployed Contingency Response Group commander
answer
O-6
question
Which force module supported by TDC is established within 48 hours and supports 50 to 150 users in a cafe environment?
answer
Command and control
question
In the operate the air base module what is the maximum distance an extended site can be located from the base Network Control Center Deployed?
answer
16 km
question
Which is not a division of the air and space operations center?
answer
Combat support
question
which of the following is categorized as a small unmanned aerial system?
answer
RQ-11B Raven
question
Which of the following is not a career field assigned to engineering installation units?
answer
3D0X3, Cyber Surety
question
Which Engineering Installation unit has the only flight assigned that supports a 72 hour rapid response force during crisis providing specialized engineering support in telecommunications and electromagnetic spectrum field analysis?
answer
85 engineering installation squardon 9EIS)
question
All armed forces broadcasting affiliates merged under the American Forces Network (AFN) in
answer
1988
question
What methods and procedures technical order (MPTO) defines project management as the application of knowledge, skills, tools, and techniques to project activities to meet project objectives?
answer
MPTO 00-33A-1001
question
The five phases of project management are initiate
answer
plan, execute, close, and control
question
What does the project manager provide in the initiate phase?
answer
Answers, guidance, and education
question
What are the source documents that define a needed cyberspace infrastructure capability called?
answer
Requirements
question
Which of these items is contained in the Project Plan
answer
Cost management plan
question
The desired outcome, product, or service of a project is referred to as
answer
a deliverable
question
Which of the following is a type of change request used to correct a portion of the project not meeting requirement specifications?
answer
Defect repairs
question
What document marks the end of a project and validates the successful installation of a communications system?
answer
AFTO Form 737
question
Exceptions that could prevent a system from meeting specified operational requirements are termed
answer
major
question
What is critical to controlling and ensuring the overall project progresses accordingly, regardless of the phase?
answer
follow up
question
Changes are requested during a project using
answer
AF form 1146
question
Who implements a technical solution for a base?
answer
implementing organization
question
What title is given to anyone assigned to assist the program manager in fulfilling program management duties?
answer
Program action officer
question
The five key stages of the Information Technology Infrastructure Library (ITIL) service life cycle are service strategy,
answer
service design, service transition, service operation, and continual service improvement
question
In what ITIL stage do you determine the underlying principles used for developing the policies , objectives, guidelines, and processes required throughout the Service Life Cycle?
answer
service strategy
question
in what ITIL stage do you create the framework to ensure the designed service is effectively implemented in the live environment?
answer
service transition
question
Engineering support for MAJCOMs is provided by Cyberspace Systems Integrator Tier?
answer
2
question
Which guidance directs the use of cyberspace infrastructure planning system (CIPS)
answer
AFI 33-150
question
Which CIPS functional area supports enhancements to current capabilities funded and accomplished at the base level generally in less than 30 days in the form of a maintenance task order?
answer
work orders
question
Which of the following funding options does the local communications squadron implementing using base level support and resources?
answer
Self-Help
question
Where can you find a list of lead commands or system program offices (SPOs) for each major program?
answer
TO-00-33D-3003
question
As a minimum which of the following is not required to review and validate technical solutions?
answer
Base Civil engineer
question
Which of the following is not a cause for requirements to be considered special?
answer
Requires additional funding
question
In which type of plan do writers fully develop the mission, situation and concept of operations for accomplishing assigned mission in the event of future situation, but only summarize the mobility and logistic requirements?
answer
Concept plan
question
When tasked by the supported combatant commander which type of plan is prepared in support of the contingency plans?
answer
Supporting Plan
question
If instructions are not detailed enough to warrant a separate annex, information on base functional area support is placed in the
answer
Operations Plan (OPLAN) major paragraph
question
What area of the Annex K is sued to detail wartime procedures for maintaining the communications systems under contract during peacetime?
answer
Logistics
question
Which type of planning meeting identifies civil engineering projects including new construction, renovations, or demolitions of facilities, and relocations of organizations?
answer
Facilities utilization board
question
The AF form 1067 is used for defining, validating, and approving requirements for
answer
all temporary and permanent modificiations
question
Which modification type evaluates, demonstrates or exercises the technical performance, operational effectiveness, and/or the operational suitability of development and/or test material (hardware,firmware and software capabilities)
answer
T-2 temporary modification
question
Which of the following is not a step required in the modification proposal process?
answer
work center manager certification and approval
question
Support agreements are documented on
answer
DD form 1144
question
As a minimum, a support agreement must be reviewed how soon after its effective date?
answer
3 years
question
Which of the following is not an exception to the "full and open competition" stipulation of the Competition and Contracting Act?
answer
Unit commander's invest
question
Within how many days of the delivery date must a fully researched, completed requirement for a fixed price and cost reimbursement contract with a monetary value of $100,000 be submitted to the Base contracting office?
answer
35 calendar days
question
Which type of contract acquires supplies or services based on direct labor hours at specified fixed hourly rates?
answer
time and material
question
Which type of contract should only be used when it is impossible to accurately estimate the extent or duration of the work or anticipate costs with any reasonable degree of accuracy?
answer
Time and material
question
Which type of contract is permissible when there is only one viable option to satisfy the requirement for supplies or services?
answer
Sole Source
question
Which of the following is a simplified method of filling anticipated repetitive needs for supplies by establishing "charge accounts" with qualified sources of supply?
answer
Blanket purchase aggrement
question
Who is responsible for establishing and maintaining the installation's contract Quality Assurance Program?
answer
Contracting offfice
question
Who is responsible for assigning competent and capable functional experts as primary and alternate contract officer representatives
answer
Functional Director/ Commander
question
Who acts as the unit focal point to provide design support to and/or obtain base civil engineering support?
answer
Unit plans, planning, and agreement section
question
What must base CE prepare and forward to MAJCOM for review and approval if major or minor construction is required?
answer
DD Form 1391
question
Who is responsible for providing training to QA personnel and functional directors/commander?
answer
QA program coordinator
question
Sec of Defense and House and Senate Armed Services Committees authorization and appropriation are required for what type of construction projects?
answer
All military construction
question
The cost threshold for a minor construction project not using operation and maintenance funds is
answer
1.5 million
question
Who is responsible for inspecting all "real property" on installation to ensure it meets applicable standards
answer
Base CE
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New