Control is focused on ________ elements of a project
answer
Performance, cost, and time
question
When performing control, project managers need to be attentive to ________.
answer
Regulation and conservation equally
question
Physical asset control requires control of the ________ and is concerned with asset maintenance, whether preventative or corrective.
answer
The use of physical assets
question
The stewardship of human resources requires ________ the growth and development of people.
answer
Controlling and maintaining
question
Identify the item that is not one of the three types of control processes described by the authors.
answer
Robotic control
question
The key feature of cybernetic control systems is ________.
answer
Automatic operation
question
In a cybernetic control system using a negative feedback loop, the speed or force with which the control operates is, in general, ________ to the size of the deviation from standard.
answer
Proportional
question
The following statement is a major disadvantage of third-order cybernetic control systems.
answer
Their human elements lack predictability and reliability
question
In essence, the law of ________ dictates that a controller must be able to take a counteraction for every action the system can take in order to achieve total control over the system.
answer
Requisite variety
question
Most control systems used in project management today fall into this category of control system.
answer
Go/no-go control
question
Go/no-go controls operate ________.
answer
Only when and if the controller uses them
question
Because project milestones do not occur at periodic intervals, go/no-go controls should be linked to ________; not simply to the calendar.
answer
The actual plans and to the occurrence of real events
question
In order to gain user acceptance, the control system should appear to be ________
answer
Sensible
question
In addition to being easy to maintain, a good control system will ________ if it goes out of order.
answer
Signal the overall controller
question
The critical ratio control chart uses a ratio made up of two parts -- the ratio of actual progress to scheduled progress, and the ________.
answer
Ratio of budgeted cost to actual cost
question
________ controls work to conserve the organization's assets by insisting that certain conditions be met before capital can be expended. Those same conditions usually regulate the use of capital to achieve the organization's goal of a high return on investments.
answer
capital investment
question
With respect to financial controls, courts will require the practice of ________ regarding financial controls, practices, and record-keeping.
answer
due diligence
question
The most common type of control system is the ________, or steering, control.
answer
cybernetic
question
The cybernetic control system that acts to reduce deviations from standard is called a ________.
answer
negative feedback loop
question
A ________ device serves as an example of a simple, first-order cybernetic control system.
answer
goal-seeking
question
The addition of a clock to the thermostat to allow it to maintain different standards during day and night makes the thermostat a ________ cybernetic controller.
answer
second-order
question
The ________ is a type of cybernetic control system that can change its goals without specific preprogramming.
answer
third-order control system
question
A third-order cybernetic control system is said to have ________ consciousness and, thus, must contain humans.
answer
reflective
question
The preprogramming in second-order cybernetic control systems enables them to ________ and to react in specific ways.
answer
recognize patterns
question
The ________ controls take the form of testing to see if some specific precondition has been met.
answer
go/no-go
question
The Prime Law of Life on any project is ________.
answer
Never let the boss be surprised!
question
Post project reviews are an example of ________.
answer
postcontrols
question
________ are directed towards improving chances for future projects to meet their goals.
answer
postcontrols
question
Because the critical ratio is the product of the two separate ratios for ________, this way of combining the two underlying ratios weights them equally. It allows a bad ratio for one part to be offset by an equally good ratio in the other.
answer
CPI and SPI
question
Human response to steering controls tends to be positive because they are usually viewed as ________.
answer
helpful rather than a source of unwelcome pressure
question
Many people perceive ________ to be equivalent to report cards
answer
postcontrols
question
Investment in control systems is subject to ________, so it is important to balance the need for control with the cost of control.
answer
sharply diminishing returns
question
A balanced control system is directed toward ________ rather than toward punishment.
answer
correction of error
question
Configuration management activities are often part of an organization's ________ process.
answer
change control
question
An ________ is a monitoring system that forewarns the project manager if trouble arises.
answer
early warning system