System Analysis and Design Midterm Test – Flashcards

Unlock all answers in this set

Unlock answers
question
In launching a new information system, the greatest risk occurs when a company ____
answer
tries to decide how the system will be implemented before determining what the system is supposed to do
question
Examples of company-wide applications, called ____, include order processing systems, payroll systems, and company communications networks
answer
enterprise applications
question
When planning an information system, a company must consider how a new system will interface with older systems, which are called ____
answer
legacy systems
question
Systems analysts use a process called ____ to represent a company's operations and information needs
answer
business process modeling
question
____ enabled computer-to-computer transfer of data between companies, usually over private telecommunications networks
answer
EDI
question
Knowledge management systems are called expert systems because they ____
answer
simulate human reasoning by combining a knowledge base and inference rules that determine how the knowledge is applied
question
In a typical company organizational model, top managers ____
answer
develop long-range plans, called strategic plans, which define the company's overall mission and goals
question
Structured analysis is a traditional systems development technique that uses a series of phases, called the ____, to plan, analyze, design, implement, and support an information system
answer
SDLC
question
Systems development typically starts with a ____
answer
systems request, followed by a preliminary investigation, which includes a feasibility study
question
Strategic planning looks beyond day-to-day activities and focuses on a horizon that is ____ years in the future
answer
three, five, ten, or more years in the future
question
Hardware-based security controls include ____
answer
biometric devices
question
Many companies implement ____ systems that integrate all customer-related events and transactions
answer
CRM (customer relationship management)
question
A systems request form should not ____
answer
have complex instructions
question
Of the measures of feasibility in the accompanying figure, ____ considers questions such as "Does management support the project?" and "Will the new system require training for users?"
answer
operational feasibility
question
Of the measures of feasibility in the accompanying figure, ____ considers points such as "Does the proposed platform have sufficient capacity for future needs?" and "Will the hardware and software environment be reliable?"
answer
technical feasibility
question
Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs
answer
economic feasibility
question
Of the measures of feasibility in the accompanying figure, issues that relate to ____ include "Has management established a firm timetable for the project?" and "Will a project manager be appointed?"
answer
schedule feasibility
question
Examples of tangible benefits include all of the following except a(n) ____
answer
user-friendly system that improves employee job satisfaction
question
When assessing priorities for systems requests, a systems analyst should look for high scores in all of the following except ____
answer
Will the proposed system decrease revenue for the company?
question
Projects where management has a choice in implementing them are called ____ projects
answer
discretionary
question
All of the following are metrics of a successful project EXCEPT ____
answer
completion with the same personnel as were on the team at the outset
question
In addition to tasks, every project has ____, which are reference points used to monitor progress and manage the project
answer
milestones
question
The first step in creating a WBS is to ____
answer
identify all tasks
question
All of the following affect project time requirements EXCEPT ____
answer
work breakdown structure
question
In developing time and cost estimates, project managers must consider _____
answer
all of the above
question
Gantt Charts can simplify a complex project by combining several activities into a task ____, that contains subsidiary tasks
answer
group
question
A project manager must balance ____ to achieve a workable schedule; graphical planning aids can help in the process
answer
all of the above
question
PERT/CPM is called a(n) ____ technique, because it analyzes a large, complex project as a series of individual tasks
answer
bottom-up
question
A _____ cannot be started until one or more other tasks are completed
answer
dependent task
question
Two or more concurrent tasks often depend on a single prior task, which is called a(n) ____ task
answer
predecessor
question
A ____ path includes all tasks that are vital to the project schedule
answer
critical
question
A(n) ____ chart displays complex task patterns and relationships
answer
PERT/CPM
question
A risk ____ plan is a proactive effort to anticipate a risk and describe an action plan to deal with it
answer
response
question
One of the main activities in the systems analysis phase is ____ modeling, which involves fact-finding to describe the current system and identification requirements for the new system
answer
requirements
question
Greater user involvement in the system development process usually results in ____
answer
more satisfied users
question
RAD relies heavily on ____
answer
both a and b
question
Using a(n) ____, an analyst can show business functions and break them down into lower-level functions and processes
answer
FDD
question
All of the following are categories of system requirements EXCEPT ____
answer
dynamics
question
____ is a typical example of a system requirement for the performance category
answer
The student records system must produce class lists within five hours after the end of registration
question
In addition to direct costs, systems developers must identify and document indirect expenses that contribute to the ____
answer
TCO
question
In an interview, ____ encourage spontaneous and unstructured responses
answer
open-ended questions
question
DFD symbols are referenced by using all ____ letters for the symbol name
answer
capital
question
A black hole process is a process that has ____
answer
no output
question
If processes must be performed in a specific sequence, you document the information in the ____
answer
process descriptions
question
Leveling ____
answer
uses a series of increasingly detailed DFDs to describe an information system
question
Balancing ____
answer
ensures that the input and output data flows of the parent DFD are maintained on the child DFD
question
A data ____ is a central storehouse of information about a system's data
answer
repository
question
In a data dictionary, a(n) ____ is the smallest piece of data that has meaning within an information system
answer
field
question
In a data dictionary, ____ is the maximum number of characters for an alphabetic or character data element or the maximum number of digits and number of decimal positions for a numeric data element
answer
length
question
____ is based on combinations of the three logical structures, or control structures (one of which is shown in the accompanying figure), which serve as building blocks for the process
answer
Modular design
question
In the accompanying figure, the sequence structure is the completion of ____
answer
steps in a chronological order, one after another
question
The iteration structure is the completion of ____
answer
a process step that is repeated until a specific condition changes
question
An object has certain ____, which are characteristics that describe the object
answer
attributes
question
An object's ____ are the tasks or functions the object performs
answer
methods
question
Your car performs a(n) ____ called OPERATE WIPERS when you send a message by moving the proper control
answer
method
question
____ are characteristics that describe the object
answer
Attributes
question
A(n) ____ is a group of similar objects
answer
class
question
Your red Mustang is a(n) ____ of the CAR class
answer
instance
question
In an object-oriented system, objects can ____ certain attributes from other objects
answer
inherit
question
A(n) ____ defines specific tasks that an object can perform
answer
method
question
Objects within a class can be grouped into ____, which are more specific categories within a class
answer
subclasses
question
Traditionally, a company either developed its own information systems, called in-house applications, or purchased systems called software packages from outside vendors
answer
True
question
In an information system, data is information that has been transformed into output that is valuable to users
answer
False
question
Most large companies require systems that combine transaction processing, business support, knowledge management, and user productivity features
answer
True
question
Many companies find that a trend called empowerment, which gives employees more responsibility and accountability, improves employee motivation and increases customer satisfaction
answer
True
question
CASE tools provide an overall framework for systems development and support a wide variety of design methodologies, including structured analysis and object-oriented analysis
answer
True
question
In the systems planning phase, a key part of the preliminary investigation is a feasibility study that reviews anticipated costs and benefits and recommends a course of action based on operational, technical, economic, and time factors
answer
True
question
In the systems analysis phase, the first step is requirements modeling, where business processes are investigated and what the new system must do is documented
answer
True
question
A scalable design can expand to meet new business requirements and volumes
answer
True
question
Systems requests seldom are aimed at improving service to customers or users within a company
answer
False
question
Internal and external factors affect every business decision that a company makes, and IT systems are no exception
answer
True
question
Information systems that interact with customers usually receive low priority
answer
False
question
Most large companies rely on one person to evaluate systems requests instead of a committee
answer
False
question
Using a WBS allows you to manage a project as one large task
answer
False
question
In most systems analysis tasks, time and people are interchangeable
answer
False
question
When tasks must be completed one after another, they are called concurrent tasks
answer
False
question
If any task along the critical path falls behind schedule, the entire project is delayed
answer
True
question
Each activity within the systems analysis phase has an end product and one or more milestones
answer
True
question
IT professionals recognize that successful systems must be user-oriented, and users need to be involved, formally or informally, at every stage of systems development
answer
True
question
The main objective of all RAD approaches is to extend development time and expense by excluding users from every phase of systems development
answer
False
question
System requirements serve as benchmarks to measure the overall acceptability of a finished system
answer
True
question
When fact-finding, asking what is being done is the same as asking what could or should be done
answer
False
question
Creating a standard list of interview questions helps a systems analyst to keep on track and avoid unnecessary tangents
answer
True
question
When conducting an interview, after asking a question, allow the person enough time to think about the question and arrive at an answer
answer
True
question
In a DFD, a process symbol can have only one outgoing data flow
answer
False
question
Systems analysts call an entity that receives data from the system a source
answer
False
question
What makes one system more complex than another is the number of components, the number of levels, and the degree of interaction among its processes, entities, data stores, and data flows
answer
True
question
When documenting a process, the documentation includes a description of the process's characteristics and, for functional primitives, a process description, which is a model that documents the processing steps and business logic
answer
True
question
During the systems design phase, a physical model of the new information system is created that follows from the logical model and involves operational tasks and techniques
answer
True
question
An object treats data and processes separately
answer
False
question
Customer objects can perform specific tasks, such as placing an order or paying a bill
answer
True
question
Some objects might have a few attributes; others might have dozens
answer
True
question
System analysts define an object's attributes during the systems design process
answer
True
question
A gas pump is an example of a black box
answer
True
question
A major advantage of O-O designs is that systems analysts can save time and avoid errors by using modular objects
answer
True
question
After you identify the objects, classes, and relationships, you are ready to prepare an object relationship diagram that will provide an overview of the system
answer
True
question
When you create an object relationship diagram, it will serve as a guide as you continue to develop additional diagrams and documentation
answer
True
question
When you identify use cases, it is important to keep all related transactions separate
answer
False
question
In a sequence diagram, a message is identified by a narrow vertical shape that covers the lifeline
answer
False
question
In a state transition diagram, the states appear as rounded rectangles with the state names inside
answer
True
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New