Supply Chain Management Test 3 – Flashcards

Unlock all answers in this set

Unlock answers
question
Customer management
answer
the design and execution of the processes that provide customers with products and services they desire
question
Customer service
answer
a supplier's ability to provide product availability, led time performance, and service reliability. Involves specifying the firms commitment to availability, operational performance, and reliability
question
Product availability
answer
the capacity to have inventory present when and where it is desired by a customer
question
Unit Fill rate
answer
% of ordered units delivered
question
Order fill rate
answer
% orders shipped complete
question
Lead time
answer
the time that passes between the beginning and ending of a set of activities Design, order, procurement, production, delivery, to calculate you multiply all of these together Different market orientations have different elements of Order to deliver lead time
question
Service reliability
answer
a firms ability to perform all order related activities order free
question
Perfect order
answer
delivery without failure in any order attribute: complete, on time, damage free, and documentation correct
question
Customer satisfaction
answer
meeting or exceeding customers expectations including reliability, responsiveness, access, communication, credibility, security, courtesy, competence, tangibles, and knowing the customer
question
Satisfaction gaps
answer
• Knowledge- understanding of customer needs • Standards- internal performance and customer expectations • Performance- standard and actual performance • Communication- actual performance and communications about actual performance • Perception-customers view of performance and actual performance • Satisfaction- customers perceptions and expectations of performance
question
Customer success
answer
requires suppliers to have long term relationship focus, comprehensive knowledge of customer needs, considerations of customer's customers, adapt product production and distribution
question
Customer relationship management
answer
technology enabled data gathering about customers to develop strategic relationships (graph on back)
question
stockout
answer
situation when a firm has depleted inventory that is supposed to be in stock
question
fill rate
answer
a measure of the impact of stockouts over time or over multiple orders from customers
question
unit fill rate
answer
total units delivered/ total units ordered
question
line fill rate
answer
number of order lines delivered complete/ total order lines
question
order fill rate
answer
a measure of the percentage of orders that are shipped complete with all items ordered by a customer
question
order fill rate
answer
total complete orders delivered/ total orders
question
order to delivery
answer
OTD
question
order to delivery lead time
answer
the time that passes from the instant the customer places an order until the instant that the customer receives the product
question
engineer to order
answer
ETO
question
Make to order
answer
MTO
question
Assemble to order
answer
ATO
question
MTS
answer
Make to stock
question
bad
answer
bad
question
bad
answer
bad
question
bad
answer
bad
question
bad
answer
bad
question
bad
answer
bad
question
bad
answer
bad
question
Customer relationship management
answer
CRM
question
Supply management
answer
the identification, acquisition, and management of inputs and supplier relationships that a firm needs to attain its strategic objectives, also called purchasing or procurement
question
Purchase price
answer
amount paid to supplier
question
Acquisition costs
answer
bringing it to customers location
question
Usage costs
answer
warranty training, downtime, and maintenance
question
End of life costs
answer
disposal, clean up, obsolesce
question
In sourcing
answer
inputs from within the firm
question
Outsourcing
answer
inputs form outside the firm
question
Make or buy decision
answer
choosing between in sourcing or outsourcing
question
Breakeven analysis
answer
total cost curves are assume to be linear and can be created using the basic formula y= a +bx
question
y
answer
total cost
question
a
answer
fixed cost per unit
question
b
answer
variable cost per unit
question
Supply base optimization
answer
number of suppliers to use, to few increases shortages and price risks, to many and makes supply management difficult
question
Ad-versial
answer
characterized by distrust and limited communications
question
Arms length
answer
limited to simple purchasing transactions
question
Acceptance of mutual goals
answer
lacks the commitment of a full partnership
question
Full partnership
answer
have close working prelateships, trust, mutual respect, and highly integrated operations
question
Competitive bidding
answer
price is most important factor, specifications clear, high value, and several qualified sources
question
Request for proposal
answer
RFP
question
Request for quote
answer
RFQ
question
RFP or RFQ
answer
describes what customer wants, describes the purchase requirements as specifically as possible
question
Weighted point model
answer
establishes performance categories that are weighted by importance
question
Online reverse auctions
answer
suppliers bid in real time for buyers business, suppliers can make multiple bids and is usually price focused
question
Negotiation
answer
bargaining process of planning, reviewing, analyzing, and compromise to reach an agreement
question
Information sharing
answer
buyers and suppliers need to hare data about demand, supply, and delivery
question
Electronic data interchange
answer
EDI
question
EDI
answer
structured secure mode of transmitting data
question
Supplier scorecard
answer
track and report supplier performance in key areas
question
Supplier certification
answer
assessment of supplier's ability to meet buyer's needs
question
Supplier relationship management
answer
SRM
question
SRM
answer
technology enabled data gathering about suppliers to mange strategic relationships
question
Institute of supply management
answer
ISM
question
supply risk
answer
the probability of an unplanned event that negatively affects a firms ability to serve its customers
question
Total cost of ownership
answer
TCO
question
TCO
answer
all of the costs incurred before, during, and after a purchase
question
social responsibility
answer
a framework of measurable corporate policies and behaviors designed to benefit related communities
question
fixed costs per contract
answer
costs incurred at the start of production or the beginning of a new contract
question
fixed costs per order
answer
costs incurred each time an order is placed, regardless of the size of the order
question
variable costs
answer
costs that change in proportion to the quantity of units produced or service delivered
question
spend analysis
answer
a process that identifies what purchases are being made in an organization
question
purchase requisition
answer
a document that communicated needs between the user and supply management
question
supply base optimization
answer
the determination of the number of suppliers to use
question
weighted point model
answer
establishes performance categories that are weighted according to importance
question
CPFR
answer
supply chain members collaborate to meet customer demand while reducing supply chain inventory and costs
question
Vendor managed inventory
answer
VMI
question
VMI
answer
the supplier manages its customer's inventory
question
supplier certification
answer
an assessment that verifies effective procedures related to the buyers requirements
question
Independent demand
answer
demand that is beyond control of the organization, car
question
Dependent demand
answer
demand is driven by demand of anther item, tires
question
Materials requirements planning
answer
MRP
question
MRP
answer
computes demand for dependent items. A means for determining the number of parts, components, and materials needed to produce a product. Provides time scheduling information specifying when each of the materials parts, and components that should be ordered or produced.
question
Bill of materials
answer
detailed description of an end item and list of all of its raw materials parts, and subassemblies. Mocular- subassemblies, Super- fractional options
question
master production schedule
answer
MPS
question
MPS
answer
the quantities of each finished product to be completed each period
question
Inventory records files
answer
each inventory item carried as a separate file according to time buckets, pegging identifying each parent item that created demand
question
Master requirements planning system
answer
based on production schedule, a material requirements planning system • Creates schedules indentifying the specific parts and materials required to produce end items • Determines exact unit numbers needed • Determines the dates when orders fo a phased plan specifying how many and when the firm plans to build each end r those materials should be released, based on lead times
question
Time
answer
a phased plan specifying how many and when the firm plans to build each end item
question
Frozen fence
answer
no schedule changes allowed within this window
question
Moderately firm
answer
specific changes allowed within product groups as long as parts are avail be
question
Flexible
answer
significant variation allowed as long as overall capacity requirements remain at the same levels
question
Distribution Requirements Planning
answer
DRP
question
DRP
answer
computes demand for finished goods in the distribution system
question
Capacity requirements planning
answer
CRP
question
CRP
answer
determines if sufficient resources are available
question
MRP components
answer
• Gross requirement- number needed per MPS (usage) • Beginning inventory • Ending inventory • Net requirements- how short I might be (Gross req- beginning inv) • Planned order receipts- number I expect to receive • Planned order release- number of unites I need to order this week in order to be ready for next weeks demand
question
Enterprise resource planning systems
answer
ERP
question
ERP
answer
planning for a resource done form common database, allows decisions to be made from the enterprise perspective, everyone uses the same numbers. Major providers sap, jd Edwards, people soft, oracle
question
MRP
answer
computes demand for dependent items.
question
MPS
answer
the quantities of each finished product to be completed each period
question
Triple bottom line
answer
TBL
question
TBL
answer
full impact of activities on people, plant, profit, firms have responsibilities to all stakeholders
question
Bill of materials
answer
BOM
question
BOM
answer
a detailed description of an "end item" and list of all of its raw materials, parts, and subassemblies
question
time bucket
answer
the individual time period for planning
question
planning horizon
answer
the entire time period covered by the MPS
question
cumulative lead time
answer
the longest lead time path in the BOM
question
available to promise
answer
the part of planned production that is not committed to a customer
question
rough cut capacity planning
answer
an estimation of the availability of the critical resources needed to support the MPS
question
inventory status file
answer
a file that contains detailed inventory and procurement records
question
scheduled receipts
answer
the quanitity that has been order but not yet received
question
lot for lot
answer
an order for the exact amount needed
question
fixed order quantity
answer
an order for the same amount each time
question
fixed order quantity
answer
FOQ
question
periodic order quantity
answer
POQ
question
POQ
answer
an order for an amount that covers a fixed period of time
question
gross requirements
answer
the total amount of an end item that is required
question
requirements explosion
answer
the determination of how many additional units are needed
question
net requirements
answer
the minimum amount needed in the period
question
planned order receipt
answer
the amount that is planned to arrive at the beginning of a period
question
planned order release
answer
the amount of an item that is planned to be ordered in a period
question
nervousness
answer
inconsistencies in the plan caused by changes to the MPS
question
infinite loading
answer
the assumption that there is an infinite amount of capacity available
question
load profile
answer
a comparison of production needs to actual capacity
question
advanced planning and scheduling
answer
APS
question
APS
answer
systems that integrate materials and capacity planning into one system
question
Business model
answer
combination of customer segments and supply chain capabilities, trends that influence are rapid technological change, sustainability, national and corporate culture
question
Sustainability
answer
meeting today's needs without compromising the ability to meet tomorrows
question
Life cycle analysis
answer
evaluate cost of waste throughout product life cycle: extraction, production, packaging and transport, usage, disposal/recycle
question
ISO 14000
answer
international standards and certification for environmental management: identify and control impact of activities, continuous improvement of environmental performance, systemizing approach to setting and achieving goals
question
Culture
answer
a learned and shared human patter for living that defines how people make sense of things around them and how they interact with others
question
operations management
answer
OM
question
OM
answer
the management of processes used to design, supply, produce, and deliver valuable goods and services to customers
question
supply chain
answer
SC
question
SC
answer
the global network of organizations and activities involved in designing, transforming, consuming, and disposing of goods and services
question
supply chain management
answer
SCM
question
SCM
answer
the design and execution of relationships and flows that connect the parties and processes across a supply chain
question
strategic business unit
answer
SBU
question
SBU
answer
Strategic business unit- the semi-independent organizations used to manage different products and market segments
question
plan do check act
answer
PDCA
question
PDCA
answer
circular, never ending problem solving process
question
define measure analyze improve control
answer
DMAIC
question
DMAIC
answer
developed by GE as a measure of focusing efforts on quality using a methodological approach
question
D
answer
Define customers and their priorities
question
M
answer
Measure process and its performance
question
A
answer
Analyze cause of defects
question
I
answer
Improve remove cause of defects
question
C
answer
Control maintain quality
question
global trade item number
answer
GTIN
question
GTIN
answer
identification system for finished goods sold to customers
question
maintenance repairs and office supplies
answer
MRO
question
IMS dependent demand
answer
used when the demand beyond the control of the organization, bmw cars
question
MS dependent demand
answer
used when the demand for an item is driven by demand of another item
question
total ordering costs
answer
TC= CD/Q + QUC/2
question
Total annual acquisition costs
answer
TAC
question
TAC
answer
the sum of all relevant annual inventory costs
question
TAC
answer
total ordering costs+ total carrying costs + annual costs
question
Ro ro
answer
roll on roll off
question
Ro ro
answer
large ferry that facilitates the loading processes by using drive on/off raps, has capacity to haul containers
question
Mean forecast error
answer
MFE
question
MFE
answer
tendency to over or under predict future demand
question
Mean absolute deviation
answer
MAD
question
MAD
answer
average of forecast errors irrespective of their direction
question
sales and operations planning
answer
S&OP
question
S&OP
answer
process for integrating marketing and operations plan to develop a tactical plan in attempt to balance supply and demand.
question
statistical process control
answer
SPC
question
ETO
answer
design and make to customer specifications
question
MTO
answer
make to customer demand from raw materials and components
question
ATO
answer
assemble to customer demand from generic subassemblies
question
MTS
answer
Make to stock, build and stock in anticipation of customer demand
question
DRP
answer
computes demand for finished goods in the distribution system
question
CRP
answer
determines if sufficient resources are available
question
Point of sale
answer
POS