PMP 5th Edition – Definition

question

Acceptance Criteria
answer

A set of conditions that is required to be met before deliverables are accepted.
question

Accepted Deliverables
answer

Products, results, or capabitlities produced by a project and validated by the project customer or sponsors as meeting their specified acceptance criteria.
question

Accuracy
answer

Within the quality management system, ——– is an assessment of correctness.
question

Acquire Project Team
answer

The process of confirming human resource availability and obtaining the team necessary to complete project activities.
question

Acquisition
answer

Obtaining human and material resources necessary to perform project activities. ——– implies a cost of resources, and is not necessarily financial.
question

Activity
answer

A distinct, scheduled portion of work performed during the course of a project.
question

Activity Attributes
answer

Multiples attributes associated with each schedule activity that can be included within the activity list. ——– ——– include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, imposed dates, constraints, and assumptions.
question

Activity Code
answer

One or more numerical or text values that identify characteristics of the work or in some way categorize the schedule activity that allows filtering and ordering of activities within reports.
question

Activity Cost Estimates
answer

The projected cost of the schedule activity that incldes the cost for all resources required to perform and complete the activity, including all cost types and cost components.
question

Activity Duration
answer

The time in calendar units beween the start and finish of a schedule activity. See also duration.
question

Activity Duration Extimate
answer

A quantitative assessment of the likely amount or outcome for the duration of an activity.
question

Activity identifier
answer

A sehort, unique numeric or text identification assigned to each schedule activity to differenciate that project activity from other activities. Typcialla unique within any one project schedule network diagram.
question

Activity List
answer

A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed.
question

Activity Network Diagrams
answer

See project schedule network diagram.
question

Activity-on-Node (AON)
answer

A technique used for constructing a schedule model in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.
question

Activity Resource Requirements
answer

The types and quantities of resources required for each activiy in a work package.
question

Actual Cost (AC)
answer

The realized cost incurred for the work performed on an activiy during a specific time period.
question

Actual Duration
answer

The time in calendar units between the actual start date of the schedule activity and either the data date of the project schedule if the schedule activity is in progress or the actual finish date if the schedule activity is complete.
question

Adaptive Life Cycle
answer

A project life cycle, also known as change-driven or agile methods, that is intended to facilitate change and require a high degree of ongoing stakeholder involvement. ——– ——– ——– are also iteratives an incremental, but differ in that iterations are very rapid (usually2-4 weeks in length) and are fixed in time and resources.
question

Additional Quality Planning Tools
answer

A set of tools used to define the quality requirements and to plan effective quality management activities. They include, but are not limited to: brainstorming, force field analysis, nominal group techniques and quality management and control tools.
question

Adjusting Leads and Lags
answer

A technique used to find ways to bring project activities that are behind into alignment with plan during project execution.
question

Advertising
answer

The process of calling public attention to a project or effort.
question

Affininity Diagram
answer

A group creativity technique that allows large numbers of ideas to be classified into groups for review and analysis.
question

Agreements
answer

Any document or communication that defines the initial intentions of a project. This can take the form of a contract, memorandum of understanding (MOU) letters of agreement, verbal agreements, emails, etc.
question

Alternative Analysis
answer

A technique used to evaluate identified options in order to select wich options or approaches to use to executeand perform the work of the project.
question

Alternatives Generation
answer

A technique used to develop as many potential options as possible in order to identify different approaches to execute and perform the work of the project.
question

Analogous Estimating
answer

A technique for estimating the duration or cost of an activity or a project using historical data from a similar activity or project.
question

Analytical Techniques
answer

Various techniques used to evaluate, analyze, or forecast potential outcomes bases on possible variations of project or environmental variables and their relationships with other variables.
question

Application Area
answer

A category of projects that have common components significant in such projects, but are not needed or present in all projects. ——– ——–are usally defined in terms of either the product (i.e., by similar technologies or production methods) or the type of customer (i.e., internal versus external, government versus commercial) or industry sector (i.e., utilities, automotive, aerospace, information technologies, etc.). ——– ——– can overlap.
question

Applying Leads and Lags
answer

A technique that is used to adjust the amount of time betwenn predecessor and successor activities.
question

Apportioned Effort
answer

An activity where effort is allotted proportionaltely across certain discrete efforts and not divisible into discrete efforts. [Note: ——– ——– is one of three earned value management (EVm) types of activities used to measure work performance.]
question

Approved Change Request
answer

A ——– ——– that has been processed through the integrated change control process and approved.
question

Approved Change Requests Review
answer

A review of the ——– ——– to verify that these were implemented as approved.
question

Assumption
answer

A factor in the planning process that is considered to be true, real, or certain, without proff or demonstration.
question

Assumptions Analysis
answer

A technique that explores the accuracy of assumptions and identifies risks to the project from inaccuracy, inconsistency, or incompleteness of assumptions.
question

Attribute Sampling
answer

Method of measuring quality that consists of noting the precense (or absence) of some characteristic (attribute) in each of the units under consideration. After each unit is inspected, the decision is made to accept a lot, reject it, or inspect another unit.
question

Authority
answer

The right to apply project resources, expend funds, make decisions, or give approvals.
question

Backlog
answer

A listing of product requirements and deliverables to be completed, written as stories, and prioritized by the business to manage and organize the project’s work.
question

Backward Pass
answer

A critical path method technique for calculating the late start and late finish dates by working backward through the schedule model from the project end date.
question

Bar Chart
answer

A graphic display of schedule-related information. In the typical ——– ——–, schedule activities or work breakdown structure components are listed down the left side of the chart, dates are shown accross the top, and activity durations are shown as date-placed horizontal bars.
question

Baseline
answer

The approved version of a work product that can be changed only through formal change control procedures and is used as a basis for comparison.
question

Basis of Estimates
answer

Supporting documentation outlining the details used in establishing project estimates such as assumptions, constraints, level of detail, ranges, and confidence levels.
question

Benchmarking
answer

——– is the comparison of actual or planned practices, such as processes and operations, to those of comparable organizations to identify best practices, generate ideas for improvement, and provide a basis for measuring performance.
question

Bidder Conference
answer

The meetings with prospective sellers prior to the preparation of a bid or proposal to ensure all prospective vendors have a clear and common understanding of the procurement.
question

Bottom-Up Estimating
answer

A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS)
question

Brainstorming
answer

A general data gathering and creativity technique that can be used to identify risks, ideas, or solutions to issues by using a group of team members or subject matter experts.
question

Budget
answer

The approved estimate for the project or any work breakdown structure component or any schedule activity.
question

Budget at Completion (BAC)
answer

The sum of all budgets established for the work to be performed.
question

Business Case
answer

A documented economic feasability study used to establish validity of the benefits of a selected component lacking sufficient definition and that is used as a basis for the authorization of further project management activities.
question

Business Value
answer

A concept that is unique to each organization and includes tangible and intangible elements. Through the effective use of project, program, and portfolio management disciplines, oganizations will possess the ability to employ reliable, established processes to meet enterprise objectives
question

Buyer
answer

The acquirer of products, Services, or results for an organization.
question

Cause and Effect Diagram
answer

A decomposition technique that helps trace an undesirable effect back to ist root cause.
question

Central Tendency
answer

A property of the central Limit Theorem predicting that the data observations in a distrivution will tend to Group around a central Location. The three typical measures of ——– ——– are the mean, median and mode.
question

Change Control
answer

A process whereby modifications to documents, deliverables, or baselines associated with the Project are identified, documented, approved, or rejected.
question

Change Control Board (CCB)
answer

A formally chartered Group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the Project, and for recording and communicating such decisions.
question

Change Control System
answer

A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled.
question

Change Control Tools
answer

Manual or automated tools to assist with change and/or configuration management. At a minimum, the tools should support the activities of the CCB.
question

Change Log
answer

A comprehensice list of changes made during the project. This typically includes dates of the change and impacts in term of time, cost, and risks.
question

Change Request
answer

A formal proposal to modify any document, deliverable, or baseline.
question

Checklist Analysis
answer

A technique for systematically reviewing materials using a list for accuracy and completeness.
question

Checksheets
answer

A tally sheet that can be used as a checklist when gathering data.
question

Claim
answer

A request, demand, or assertion of rights by a seller against buyer, or vice versa, for consideration, compensation, or payment under the terms of a legally binding contract, such as for a disputed Change.
question

Claims Administration
answer

The process of processing, adjudicating, and communicating contract claims.
question

Close Procurements
answer

The process of completing each project procurement.
question

Close Project or Phase
answer

The process of finalizing all activities across all of the Project Management Process Groups to formally complete a project or phase.
question

Closed Procurements
answer

Project contracts or other procurement agreement that have been formally acknowleged by the proper authorizing agent as being finalized and signed off.
question

Closing Process Group
answer

Those processes performed to finallize all activities across all Process Groups to formally close a project or phase.
question

Code of Accounts
answer

A numbering System used to uniquely identify each component of the work breakdown structure (WBS).
question

Collect Requirements
answer

The process of determining, documenting, and managing stakeholder needs and requirements to meet project objectives.
question

Colocation
answer

An organizational placement strategy where the project team members are physically located close to one another in order to improve communication, workuing relationships, and productivity.
question

Communication Constraints
answer

Restrictions on the content, timing, audience, or individual who will deliver a communication usually stemming from specific legislation, technology, or organizational policies.
question

Communication Methods
answer

A systematic procedure, technique, or process used to transfer Information among project stakeholders.
question

Communication Models
answer

A description, analogy or schematic used to represent how the communication process will be performed for the project.
question

Communication Requirements Analysis
answer

An analytical technique to determine the Information needs of the project stakeholders through interviews, workshops, study of lessons learned from previous projects, etc…
question

Communication Technology
answer

Specific tools, systems, computer programs, etc…, used to transfer Information among project stakeholders.
question

Communications Management Plan
answer

A component of the project, program, or portfolio management plan that describes how, when, and by whom Information about the project will be administered and dissemninated.
question

Compliance
answer

A general concept of conforming to a rule, standard, law, or requirement such that the assessment of compliance results in a binomial result stated as “compliant” or “noncompliant”.
question

Conduct Procurements
answer

The process of obtaining seller Responses, selcting a seller, and awarding a contract.
question

Configuration Management System
answer

A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to: identify and document the functional and physical characteristics of a product, result, service, or component; control any changes to such characteristics; record and repoort each change and ist implementation status; and Support Audit of the products, result, or components to verfiy conformance to requirements. It includes the documentation, tracking systems, and defined approval Levels necessary for authorizing and controlling changes.
question

Conflict Management
answer

Handling, Controlling, and guiding a conflictual Situation to achieve a resolution.
question

Conformance
answer

Within the quality management system, conformance is a general concept of delivering results that fall within the Limits that define acceptable variation for a quality requirements.
question

Conformance Work
answer

In the cost of Quality Framework, conformance work is done to compensate for imperfcetions that prevent organizations form completing planned activities correctly as essential first-time work. ——– ——– consists of Actions that are related to prevention and inspection.
question

Constraint
answer

A limiting factor that effects the execution of a project, program, portfolio, or process.
question

Context Diagrams
answer

A visual depiction of the product scope showing a business system (process, equipment, computer system, etc.), and how people and other systems (actors) interact with it.
question

Contingency
answer

An event or occurance that could affect the execution of the project that may be acconted for with a reserve.
question

Contingency Reserve
answer

Budget within the cost baseline or performance measurement baseline that is allocated for identified risks that are accepted and for wich contingent or mitigating responses are developed.
question

Contingent Response Strategies
answer

Responses provided which may be used in the event that a specific trigger occurs.
question

Contract
answer

A contract is a mutually binding agreement that obligates the seller to provide the specified product or service or result and obligates the buyer to pay for it.
question

Contract Change Control System
answer

The system used to collect, track, adjudicate, and communicate changes to a contract.
question

Control
answer

Comparing actual performance with planned performance, analyzing variances, assessing trends to aeffect process improvements, evaluating possible alternatives, and recommending appropriate corrective action is needed.
question

Control Account
answer

A management control point where scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement.
question

Control Chart
answer

A graphic display of process data over time and against established control limits, which has a centerline that assists in detecting a trend of plotted values toward either control limit.
question

Control Communications
answer

The process of monitoring and ——– ——– throughout the entire project life cycle to ensure the information needs of the project stakeholders are met.
question

Control Costs
answer

The process of monitoring the status of the project to update the project costs and managing changes to the baseline.
question

Control Limits
answer

The area composed of three standard deviations on either side of the centerline or mean of a normal distribution of data plotted on a control chart, which reflects the expected variation in the data.
question

Control Procurements
answer

The process of managing procurement realtionships, monitoring contract performance, and making changes and corrections as appropriate.
question

Control Quality
answer

The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes.
question

Control Risks
answer

The process of implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process effectiveness throughout the project.
question

Control Schedule
answer

The process of monitoring the status of project activities to update project progress and manage changes to the schedule baseline to achieve the plan.
question

Control Scope
answer

The process of monitoring the status of the project and product scope and managing changes to the scope baseline.
question

Control Stakeholder Engagement
answer

The process of monitoring overall project stakeholder relationships and adjusting strategies and plans for engaging stakeholders.
question

Corrective Action
answer

An intentional activity that realigns the performance of the project work with the project management plan.
question

Cost Aggregation
answer

Summing the lower-level cost estimates associated with the various work packages for a given level within the project^s WBS or for a given cost control account.
question

Cost Baseline
answer

The approved version of the time-phased project budget, excluding any management reserves, which can be changed only through formal change control procedures and is used as a basis for comparison to actual results.
question

Cost Management Plan
answer

A component of a project or program management plan that describes how costs will be pleanned, structured, and controlled.
question

Cost of Quality
answer

A method of determining the costs incurred to ensure quality. Prevention and appraisal costs (cost of conformance) include costs for quality planning, quality control (QC), and quality assurance to ensure compliance to requirements (i.e., training, QC systems, etc.). Failure costs (cost of nonconformance) incude costs to rework products, components, or processes that are non-compliant, costs of warranty work and waste, and loss of reputation.
question

Cost Performanc Index (CPI)
answer

A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.
question

Cost Plus Award Fee Contracts (CPAF)
answer

A category of contract that involves payments to the seller for all legitimate actual costs incurred for completed work, plus an award fee representing seller profit.
question

Cost Plus Fixed Fee Contract (CPFF)
answer

A type of cost-reimbursable contract where the buyer reimburses the selle for the seller’s allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee).
question

Cost Plus Incentive Fee Contract (CPIF)
answer

A type of cost-reimbursable contract where the buyer reimburses the seller for the seller’s alowqable costs (allowable costs are defined by the contract), and the seller earns its profit if it meets defined performance criteria.
question

Cost Variance (CV)
answer

The amount of budget deficit or surplus at a given point in time, expressed as the difference between the earned value and the actual cost.
question

Cost-Benefit Analysis
answer

A financial analysios tool used to determine the benefits provided by a project against its costs.
question

Cost-Reimbursable Contract
answer

A type of contract involving payment to the seller for the seller’s actual costs, plus a fee typically representing seller’s profit. Cost-reimbursable contracts often include incetive clauses where, if the seller meets or exceeds selected project objectives, such as schedule targets or total cost, the the seller receives from the buyer an incetive or bonus payment.
question

Crashing
answer

A technique used to shorten the schedule duration for the least incremental cost by adding resources.
question

Create WBS
answer

The process of subdividing project deliverables and project work into smaller, more manageable components.
question

Criteria
answer

Standards, rules, or tests on which a judgment or decision can be based or by which a product, service, result, or process can be evaluated.
question

Critical Chain Method
answer

A schedule method that allows the project team to place buffers on any project schedule path to account for limited resources and project uncertainties.
question

Critical Path
answer

The sequence of activities that represents the longest path through a project, which determines the shortest possible duration.
question

Critical Path Activity
answer

Any activity on the critical path in a project schedule.
question

Customers
answer

——– is the person(s) or organization(s) that will pay for the project’s product, service, or result. ——– can be internal or external to the performing organization.
question

Customer Satisfaction
answer

Within the quality management system, a state of fullfillment in which the needs of a customer are met or exceeded for the customer’s expected experiences as assessed by the customer at the moment of evaluation.
question

Data Date
answer

A point in time when the status of the project is recorded.
question

Data Gathering and Representation Techniques
answer

Techniques used to collect, organize, and present data and information.
question

Decision Tree Analysis
answer

A diagramming and calculation technique for evaluating the implications of a chain of multiple options in the presence of uncertainty.
question

Decomposition
answer

A technique used for dividingand subdividing the project scope and project deliverables into smaller, more manageable parts.
question

Defect
answer

An imperfection or deficiency in a project component where that component does not meet its requirements or specifications and needs to be either repaired or replaced.
question

Defect Repair
answer

An intentional activity to modify a nonconforming product or product component.
question

Define Activities
answer

The process of identifying and documenting the specific actions to be performed to produce the project deliverables.
question

Define Scope
answer

The process of developing a detailed description of the project and product.
question

Deliverable
answer

Any unique and verificable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project.
question

Delphi Technique
answer

An information gathering technique used as a way to reach a consensus of experts on a subject. Experts on the subject participate in this technique anonymously. A facilitator uses a questionnaire to solicit ideas about the important project points relared to the subject. The responses are summarized and are then recirculated to the experts for further comment. Consensus may be reached in a few rounds of this process. The ——– ——– helps reduce bias in the data and keeps any one person from having undue influence on the outcome.
question

Dependency Determination
answer

A technique used to identify the type of dependency that is used to create the logical relationships between predecessor and successor activities.
question

Design of Experiments
answer

A statistical method for identifying which factors may influence specific variables of a product or process under development or in production.
question

Determine Budget
answer

The process of aggregatingthe estimated costsof individual activities or work packages to establish an authorized cost baseline.
question

Develop Project Charter
answer

The processof developing a document that formallyauthorizes the existence of a project and provides the project manager with theauthority to apply organizational resources to project activties.
question

Develop Project Management Plan
answer

The process of defining, preparing, and coordinating all subsidiary plans and integrating them into a comprehensice project management plan.
question

Develop Project Team
answer

The process of improving competencies, team member interaction, and overall team environment to enhance project performance.
question

Develop Schedule
answer

The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model.
question

Diagramming Techniques
answer

Approaches to presenting information with logical linkages that aid in understanding.
question

Dictatorship
answer

A group decision-making technique in which one individual males the decision for the group.
question

Direct and Manage Project Work
answer

The process of leading and performing the work defined in the project management plan and implementing approved changes to achieve the project’s objectives.
question

Discrete Effort
answer

An activity that can be planned and measured and that yields a specific output. [Note: Discrete effort is one of three earned value management (EVM) types of activities used to measure work performance.]
question

Discretionary Dependency
answer

A relationship that is established base on knowledge of best practices within a particual application area or an aspect of the project where a specific sequence is desired.
question

Document Analysis
answer

An elicitation technique that analyzes existing documentation and identifies information relevant to the requirements.
question

Documentation Reviews
answer

The process of gathering a corpus of information and reviewing it to determine accuracy and completeness.
question

Duration (DU or DUR)
answer

The total number of work periods (not including holidays or other nonworking periods) required to complete a schedule activity or work breakdown structure component. Usually expressed asworkdays or workweeks. Sometimes incorrectly equated with elapsed time. Contrast with effort.
question

Early Finish Date (EF)
answer

In the critical path method, the earliest possible point in time when the uncompleted portions of a schedule activity can start based on the schedule network logic, the data date, and any schedule constraints.
question

Early Start Date (ES)
answer

In the cirtical path method, the earliest possible point in time when the uncompleted portions of a schedule activity can start based on the schedule newtork logic, the data date and any schedule constraints.
question

Earned Value (EV)
answer

The measure of work performed expressed in terms of the budget authorized for that work.
question

Earned Value Management
answer

A methodology that combines scope, schedule, and resource measurements to assess project performance and progress.
question

Effort
answer

The number of labor units required to complete a schedule activity or work breakdown structure component, often expressed in hours, days, or weeks.
question

Emotional Intelligence
answer

The capability to identify, assess, and manage the personal emotions of oneself and other people, as wellas the collective emotions of groups of people.
question

Enteprise Environmental Factors
answer

Conditions, not under the immediate control of the team, that influence, constrain, or direct the project, program, or portfolio.
question

Estimate
answer

A quantitative assessment of the likely amount or outcome. Usually applied to project costs, resources, effort, and durations and is usually preceded by a modifier(i.e., preliminary, conceptual, feasibility, order-of-mangnitude, definitive). It should always include some indication of accuracy (e.g., +/- x percent).
question

Estimate Activity Durations
answer

The process of estimating the number of work periods needed to complete individual activities with estimated resources.
question

Estimate Activity Resources
answer

The process of estimating the type and quantities of material, human resources, equipment, or supplies required to perform each activity.
question

Estimate as Completion (EAC)
answer

The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.
question

Estimate Costs
answer

The process of developing an approximation of the monetary resouces needed to complete project activities.
question

Estimate to Complete (ETC)
answer

The expected cost to finish all the remaining project work.
question

Execute
answer

Directing, managing, performing, and accomplishing the project work; providing the deliverables; and providing work performance information.
question

Executing Process Group
answer

Those processess performed to complete the work defined in the project management plan to satisfy the project specifications.
question

Expected Monetary Value (EMV) Analysis
answer

A statistical technique that calculates the average outcome when the future includes scenarios that may or may not happen. A common use of this technique is within deicsion tree analysis.
question

Expert Judgment
answer

Judgement provided based upon expertise in an application area, knowledge area, discipline, industry, etc., as appropriate for the activity being performed. Such expertise may be provided by any group or person with specialized education, knowledge, skill, experience, or training.
question

External Dependency
answer

A relationship between project activities and non-project activities.
question

Facilitated Workshops
answer

An elicitation technique using focussed sessions that bring key cross-functional stakeholder together to define product requirements.
question

Failure Mode and Effect Analysis (FMEA)
answer

An analytical procedure in which each potential failure mode in every component of a product is analyzed to determine its effect on the reliability of that component and, by itself or in combinaison with other possible failure modes, on the reliability of the product or system and on the required function of the component; or the examination of a product(at the system and/or lower levels) for all ways that a failure may occur. For each potential failure, an estimate is made of its effect on the total system and of its impact. In addition, a review is undertaken of the action planned to minimize the probability of failure and to minimize its effects.
question

Fallback Plan
answer

Fallback plans inculde an alternative set of actions and tasks available in the event that the primary plan needs to be abandoned because of issues, risks, or other causes.
question

Fast Tracking
answer

A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration.
question

Fee
answer

Represents profit as a component of compensation to as seller.
question

Finish Date
answer

A point in time associated with a schedule activity’s completion. Usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, baseline, target, or current.
question

Finish-to-Finish (FF)
answer

A logical realtionship in which a successor activity cannot finish until a predecessor activity has finished.
question

Finish-to Start (FS)
answer

A logical relationship in which a successor activity cannot start until a predecessor activity has finished.
question

Firm-Fixed-Price Contract (FFP)
answer

A type of fixed proce contract where buyer pays the seller a set amount (as defined by the contract), regardless of the seller’s costs.
question

Fixed Formula Method
answer

An earned value method for assigning a specified percentage of budget value for a work package to the start mileston of the work package with the remaining budget value percentage assigned when the work package is complete.
question

Fixed Price Incentive Fee Contract (FPIF)
answer

A type of contract where the buyer pays the seller a set amount(as defined by the contract), and the seller can earn an additional amount if the seller meets defined performance criteria.
question

Fixed Price with Economic Price Adjustment Contracts (FP-EPA)
answer

A fixed-price contract, but with a special provision allowing for predefined final adjustements to the contract price due to changed conditions, such as inflation changes, or cost increases (or decreases) for specific commodities.
question

Fioxed-Price Contracts
answer

An agreement that sets the fee that will be paid for a defined scope of work regardless of the cost or effort to deliver it.
question

Flowchart
answer

The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system.
question

Focus Groups
answer

An elicitation technique that brings together prequalified stakeholdes and subjet matter experts to learn about their expectations and attittides about a proposed product, service, or result.
question

Forecast
answer

An estimate or prediction of conditions and events in the project’s future based on information and knowledge available at the time of the forecast. The information is based on the project’s past performance and expected future performance, and includes information that could impact the project in the future, such as estimate at completion and estimate to complete.
question

Forward Pass
answer

A critical patch method technique for calculating the early start and early finish dates by working forward through the schedule model from the project start date or a given point in time.
question

Free Float
answer

The amount of time that a schedule activity can be delayed without delaying the early start date of any successor or violating a schedule constraint.
question

Functional Manager
answer

Someone with management authority over an organizational unit within a cuntional organization. The manager of any group that actually makes a product or performs a service. Sometimes called a line manager.
question

Functional Organization
answer

A hierarchical organization where employee has one clear superior, and staff are grouped by areas of specialization and managed by a person with expertise in that area.
question

Funding Limit Reconciliation
answer

The process of comparing the planned expenditure of project funds against any limits on the commitment of funds for the project to identify any variances between the funding limits and the planned expenditures.
question

Gantt Chart
answer

A bar chart of schedule information where activities are listed on the vertical axis, dates are shown on the horizontal axis, and activity durations are shown as horizontal bars placed according to start and finish dates.
question

Grade
answer

A category or rank used to distinguish items that have the same functional use (e.g., “hammer”) but do not share the same requirements for quality (e.g., differetn hammers may need to withstand different amounts of force).
question

Ground Rules
answer

Expectations regarding acceptable bahavior by project team members.
question

Group Creativity Techniques
answer

Techniques that are used to generate ideas within a group of stakeholders.
question

Group Decision-Making Techniques
answer

Techniques to assess multiple alternatives that will be used to generate, classify, and prioritize product requirements.
question

Guideline
answer

An official recommendation or advice that indicates policies, standards, or procedures for how something should be accomplished.
question

Histogram
answer

A special form of bar chart used to describe the central tendency, dispersion, and shape of a statistical distribution.
question

Historical Information
answer

Documents and data on prior projects including project files, records, correspondence, closed contracts, and closed projects.
question

Human Resource Management Plan
answer

A component of the project management plan that describes how the roles and responsibilities, reporting relationships, and staff management will be addressed and structured.
question

Idea/Mind Mapping
answer

Technique used to consolidate ideas created through individual brainstroming sessions into a single map to reflec commonatily and differences in understanding and to generate new ideas.
question

Identify Risks
answer

The process of determining which risks may affedt the project and documenting their characteristics.
question

Identify Stakeholders
answer

The process of identifying the people, groups, or organizations that could impact or be impacted by a decision, activity, or outcome of the project; and analyzing and documenting relevant information regarding their interest, involvement, interfependencies, influence, and potential impact on project success.
question

Imposed Date
answer

A fixed date imposed on a schedule activity or schedule milestons, usually in the form of a “start no earlier than” and “finish no later than” date.
question

Incentive Fee
answer

A set of financial incentives related to cost, schedule, or technical performance of the seller.
question

Incremental Life Cycle
answer

A project life cycle where the project scope is generally determined early in the project life cycle, but time and cost estimates are routinely modified as the project team’s understanding of the product increases. Iterations develop the product through a series of repeated cycles, while increments successively add to the functionality of the product.
question

Independent Estimates
answer

A process of using a third party to obtain and analyze information to support prediction of cost, schedule, or other items.
question

Influence Diagram
answer

A graphical representation of situations showing causal influences, time ordering of events, and other relationshops among variables and outcomes.
question

Information Gathering Techniques
answer

Repeatable processes used to assemble and organize data across a sprectrum of sources.
question

Information Management Systems
answer

Facilities, processes, and procedures used to collect, store, and distribute information between producers and consumers of information in physical or electronic format.
question

Initiating Process Group
answer

Those processes performed to define a new project or a new phase of an existing project by obtaining authorization to start the project or phase.
question

Input
answer

Any time, wheter internal or external to the project that is required by a process before that process proceeds. May be an output from a predecessor process.
question

Inspection
answer

Examining or measuring to verify whether an activity, component, product, result, or service conforms to specified requirements.
question

Inspections and Audits
answer

A process to observe performance of contracted work or a promised product against agreed-upon requirements.
question

Interpersonal Skills
answer

Ability to establsh and maintain relationships with other people.
question

Interrelationship Diagraphs
answer

A quality management planning tool. the interrelationship diagraphs provide a process for creative problem-solving in moderately complex scenarios that possess intertwined logical realtionships.
question

Interviews
answer

A formal or informal approach to elicit information from stakeholders by taking to them directly.
question

Invitation for Bid (IFB)
answer

Generally, this term is equivalent to request for proposal. However, in some application areas, it may have a narrower or more specific meaning.
question

Issue
answer

A point or matter in question or in dispute, or a point or matter that is not settled and is under discussion or over which there are opposing views or disagreements.
question

Issue Log
answer

A project document used to document and monitor elements under discussion or in dispute between project stakeholder.
question

Iterative Life Cycle
answer

A project life cycle where the project scope is generally determined early in the project life cycle, but time and cost estimates are routinely modified as the project team’s understanding of the product increases. Iterations develop the product through a series of repeated cycles, while increments successively add to the functionality of the product.
question

Lag
answer

The amount of time whereby a successor activity is required to be delayed with respect to a predecessor activity.
question

Late Finish Date (LF)
answer

In the critical path method, the latest possible point in time when the uncompleted portions of a schedule activity can finish based on the schedule network logic, the project completion date, and any schedule constraints.
question

Late Start Date (LS)
answer

In the critical path method, the latest possible point in time when the uncompleted portions of a schedule activity can start based on the schedule network logic, the project completion date, and any schedule constraints.
question

Lead
answer

The amount of time whereby a successor activity can be advanced with respect to a predecessor activity.
question

Lesson Learned
answer

The knowledge gained during a project which shows how project events were addressed or should be addressed in the future with purpose of improving future performance.
question

Lessons Learned Knowledge Base
answer

A store of historical information and lessons learned leraned about both the outcomes of previous project selection decisions and previous project performance.
question

Level of Effort (LOE)
answer

An activity that does not produce definitive end product and is measured by the passage of time. [Not: Level of effort is one of three earned valued management (EVM) types of activities used to measure work performance.]
question

Log
answer

A document used to record and describe or denote selected items identified during execution of a process or activity. Usually used with a modifier, such as issue, quality control, action, or defect.
question

Logical Relationship
answer

A dependency between two activities, or between an activity and a milestone.
question

Majority
answer

Support from more than 50 percent of the members of the group.
question

Make-or-Buy Analysis
answer

The process of gathering and organizing data about product requirements and analysing them against available alternatives including the purchase or internal manufacture of the product.
question

Manage Communications
answer

The process of creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information in accordance with the communications management plan.
question

Manage Project Team
answer

The process of tracking team member performance, providing feedback, resolving issues, and managing team changes to optimize project performance.
question

Manage Stakeholder Engagement
answer

The process of coomunicating and working with stakeholder to meet their needs/expectations, address issues as they occur, and foster appropriate stakeholder engagement in project activities throughout the project life cycle.
question

Management Reserve
answer

An amount of the project budget withhld for management control purposes. These are budgets reserved for unforeseen work that is within scope of the project. The management reserve is not included in the performance measurement baseline (PMB).
question

Management Skills
answer

The ability to plan, organize, direct, and control individuals or groups of people to achieve specific goals.
question

Manadatory Dependency
answer

A relationship that is contractually required or inherent in the nature of the work.
question

Market Research
answer

The process of gathering information at conferences, online reviews, and a variety of sources to identify market capabilities.
question

Master Schedule
answer

A summary-level project schedule that identifies the major deliverables and work breakdown structure components and key schedule milestones.
question

Material
answer

The aggregate of things used by an organization in any undertaking, such as equipment, apparatus, tools, machinery, gear, material, and supplies.
question

Matrix Diagrams
answer

A quality amangement and control tool used to perform data analysis within the organizational structure created in the matrix. The matrix diagram seeks to show the strength of relationships between factors, causes, and objectives that exist between the rows and columns that form the matrix.
question

Matrix Organization
answer

Any organizational structure in which the project manager shares responsability with the functional managers for assigning priorities and for directing the work of persons assigned to the project.
question

Methodology
answer

A system of practices, techniques, procedures, and rules used by those who work in a discipline.
question

Milestone
answer

A significant point or event in a project, program, or portfolio.
question

Milestone List
answer

A list identifying all project milestones and normally indicates whetehr the milestons is mandatory or optional.
question

Milestone Schedule
answer

A summary-level schedule that identifies the major schedule milestones.
question

Monitor
answer

Collect project performance data with respect to a plan, produce performance measures, and report and disseminate performance information.
question

Monitor and Control Project Work
answer

The process of tracking, reviewing, and reporting the progress to meet the performance objectives defined in the project management plan.
question

Monitoring and Controlling Process Group
answer

Those processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.
question

Monte Calro Simulation
answer

A process which generates hunderd or thousands of probable performance outcomes based on probability distributions for cost and schedule on individual tasks. The outcomes are then used to generate a probability distribution for the project as a whole.
question

Most Likely Duration
answer

An estimate of the most probable activity duration that takes into account all of the known variables that could affect performance.
question

Multi-Criteria Decision Analysis
answer

This technique utilizes a decision matrix to provide a sstematic analytical approach for establishing criteria, such as risk levels, uncertainty, and valuation, to evaluate and rank many ideas.
question

Near-Critical Activity
answer

A schedule activity that has low total float. The concept of near-critical is equally applicable to a schedule activity or schedule network path. The limit below which total float is considered near critical is subject to expert judgmeent and vaires from project to project.
question

Negotiated Settlements
answer

The process of reaching final equitable settlement of all outstanding issues, claims, and disputes through negotiation.
question

Negotiation
answer

The process and activities to resolving disputes through consultations between involved parties.
question

Network Logic
answer

The collection of schedule activity dependencies that makes up a project schedule network diagram.
question

Network Path
answer

Any continuous series of schedule activities connected with logical relationships in a project schedule network diagram.
question

Networking
answer

Establishing connections and relationships with other people from the same or other oganizations.
question

Node
answer

One of the defining points of a schedule network; a junction point joined to some or all of the other dependency lines.
question

Nominal Group Techniques
answer

A technique that enhances brainstorming with a voting process used to rank the most useful ideas for further brainstorming of for prioritization.
question

Nonconformance Work
answer

In the cost of quality framework, ——– ——– is done to deal with the consequences of errors and failures in doing activities correctly on the first attempt. In efficient quality management systems, the amount of ——– ——– will approach zero.
question

Objective
answer

Something toward which work is to be directed, a strategic position to be attained, a purpose to be achieved, a result to be obtained, a product to be produced, or a service to be performed.
question

Observations
answer

A technique that provides a direct way of viewing individuals in their environement performing their jobs or tasks and carrying out processes.
question

Opportunity
answer

A risk that would have a positive effect on one or more project objectives.
question

Optimistic Duration
answer

An estimate of the shortest activity duration that takes into account all of the known variables that could affect performance.
question

Organizational Breakdown Structure (OBS)
answer

A hierarchical representation of the project organization that illustre the relationship between project activities and the organizational units that will perfrom those activities.
question

Organizational Process Assets
answer

Plann, processes, policies, procedures, and knowledge bases that are specific to and used by the performing organization.
question

Organizational Project Management Maturity
answer

The level of an organization’s ability to deliver the desired strategic outcomes in a predictable, controllable, and releable manner.
question

Output
answer

A product, result, or service generated by a process. May be an input to a successor process.
question

Parametric Estimating
answer

An stimating technique in which an alogirthm is used to calculate cost or duration based on historical data and project parameters.
question

Pareto Diagram
answer

A histogram, ordered by frequency of occurance, that shows how many results were generated by each identified cause.
question

Path Convergence
answer

A relationship in which a schedule activity has more than one predecessor.
question

Path Divergence
answer

A relationship in which a schedule activity has more than one successor.
question

Payment Systems
answer

The system used to provide and track supplier’s invoices and payments for services and products.
question

Percent Complete
answer

An estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component.
question

Perform Integrated Change Control
answer

The process of reviewing all change requests; approving changes and managing changes to deliverables, organizational prcess assets, project documents, and the project management plan; and communicating their disposition.
question

Perform Qualitativ Risk Analysis
answer

The process of prioritizing risks for further analysis or action by assassing and combinung their probabability of occurence and impact.
question

Perform Quality Assurance
answer

The process of auditing the quaility requirements and the results from quality control measurements to ensure that appropriate quality standards and operational definitions are used.
question

Perform Quantitative Risk Analysis
answer

The process of numerically analyzing the effect of identified risks on overall project objectives.
question

Performance Measurement Baseline
answer

An approved, integrated scope-schedule-cost plan for the project work against which project execution is compared to measure and manage performance. The ——– ——– ——– includes contingency reserve, but excludes management reserve.
question

Performance Reviews
answer

A techniqu that is used to measure, compare, and analyze actual performance of work in progress on the project against the baseline.
question

Performing Organization
answer

An enterprise whose personnel are most directly involved in doing the work of the project or program.
question

Pessimistic Duration
answer

Estimate of the longest activity duration that takes into account all of the known variables that could affect performance.
question

Phase Gate
answer

A review at the end of a phase in which a decision is made to continue to the next phase, to continue with modification, or to end a project or program.
question

Plan Communications Management
answer

The process of developing an appropriate approach and plan for project communications based on stakeholder’s information needs and requirements and available organizational assets.
question

Plan Cost Management
answer

The process that establish the policies, procedures, and documentation for planning, managing, expending, and controlling project costs.
question

Plan Human Resource Management
answer

The process of identifying and documenting project roles, responsibilities, required skilss, reporting relationships, and creating a staffing management plan.
question

Plan Procurement Management
answer

The process of documenting project procurement decisions, specifying the approach, and identifying potential sellers.
question

Plan Quality Management
answer

The process of identifying quality requirements and/or standards for the project and its deliverables, and documenting how the project will demonstrate compliance with quality requirements.
question

Plan Risk Management
answer

The process of defining how to conduct risk management activities for a project.
question

Plan Risk Responses
answer

The process of developing options and actions to enhance opportunities and to reduce threats to project objectives.
question

Plan Schedule Management
answer

The process of establshing the plocieis, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.
question

Plan Scope Management
answer

The process of creating a scope management plan that documents how the project scope will be defined, validated, and controlled.
question

Plan Stakeholder Management
answer

The process of developing appropriate management strategies to effectively engage stakeholdes throughout the project life cycle, based on the analyis of thier needs, interests, and potential impact on project success.
question

Planned Value (PV)
answer

The authorized budget assigned to scheduled work.
question

Planning Package
answer

A work breakdown structure component below the control account with known work content but without detailed schedule activities.
question

Planning Process Group
answer

Those processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve.
question

Plurality
answer

Decisions made by the largest block in a group, even if a majority is not achieved.
question

Policy
answer

A structured pattern of actions adopted by an organization such that the organization’s policy can be explained as a set of basic principles that govern the organization’s conduct.
question

Portfolio
answer

Projects, programs, subportfolios, and operations managed as a group to achieve strategic objectives.
question

Portfolio Management
answer

The centralized management of one or more portfolios to achieve strategic objectives.
question

Practice
answer

A specific type of professional or management activity that contributes to the execution of a process and that may employ one or more techniques and tools.
question

Precedence Diagramming Method (PDM)
answer

A technique used for constructing a schedule model in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.
question

Precedence Relationship
answer

The term used in the precedence diagramming method for a logical realtionship. In cureent usage, however, precedence relationship, logical relationship, and dependency are widely used interchangeably regardless of the diagramming method used.
question

Precision
answer

Within the quality management system, ——– is a measure of exactness.
question

Precessor Activity
answer

An activity that logically comes before a dependent activity in a schedule.
question

Predictive Life Cycle
answer

A form of project life cycle in which the project scope, and the time and cost required to deliver that scope, are determined as early in the life cycle as possible.
question

Preventive Action
answer

An intentional activity that ensures the future performance of the project work is aligned with the project management plan.
question

Prioritization Matrices
answer

A quality management planning tool used to identify key issues and evaluate suitable alternatives to define a set of implementations priorities.
question

Probabilitiy and Impact Matrix
answer

A grid for mapping the probability of each risk occurence and its impact on project objectives if that risk occurs.
question

Procedure
answer

An established method of accomplishing a consistent performance or result, a procedure typically can be describes as the sequence of steps that will be used to execute a process.
question

Process
answer

A systematic series of activities directed towards causing an end result such that one or more inputs will be acted upon create one or more outputs.
question

Process Analysis
answer

A ——– ——– follows the steps outlined in the process improvement plan to identify needed improvements.
question

Process Decision Program Charts (PDPC)
answer

The ——– ——– ——– ——– is used to understand a goal in relation to the steps for getting to the goal.
question

Process Improvement Plan
answer

A subsidiary plan of the project management plan. It details the steps for analyzing processes to identify activities that enhance their value.
question

Procurement Audits
answer

The review of contracts and contracting processes for completeness, accuray, and effectiveness.
question

Procurement Documents
answer

The documents utilized in bid and proposal activities, which include the buyer’s Invitation for Bid, Invitation for Negotiations, Request for Information, Request for Quaotation, Request for Proposal, and seller’s responses.
question

Procurement Management Plan
answer

A component of the project or program management plan that describes how a project team will acquire goods and services from outside the performing organization.
question

Procurement Performance Reviews
answer

A structured review of the seller’s progress to deliver project scope and quality, whithin cost and on schedule, as compared to the contract.
question

Procurement Statement of Work
answer

Describes the procurement item in sufficient detail to allow prospective sellers to determine if they are capable of providing the products, services, or results.
question

Product
answer

An artifact that is produced, is quantifiable, and can be either an end item in itself or a component item. Additional words for products are material and goods.
question

Product Analysis
answer

For projects that have a product as a deliverable, it is a tool to define scope that generally means asking quastions about a product and forming answers to describes the use, characteristics, and other relevant aspects of what is going to be manufactured.
question

Product Life Cycle
answer

The series of phases that represent the evolution of a product, from concept through delivery, growth, maturity, and to retirement.
question

Product Scope.
answer

The features and functions that characterize a product, service, or result.
question

Product Scope Description
answer

The documentated narrative description of the product scope.
question

Program
answer

A group of related projects, subprograms, and program activities managed in a coordinated way to obtain benefits not available from managing them individually.
question

Program Evaluation and Review Technique (PERT)
answer

A technique for estimating that applies a weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates.
question

Program Management
answer

The application of knowledge, skills, tools, and techniques to a program to meet the program requirements and to obtain benefits and control not available by managing projects individually.
question

Progressive Elaboration
answer

The iterative process of increasing the level of detail in a project management plan as greater amounts of information and more accurate estimates become available.
question

Project
answer

A temporary endeavor undertaken to create a unique product, service, or result.
question

Project-Based Organizations (PBOs)
answer

A variety of organizational forms that involve the creation of temporary systems for the performance of projects. PBOs conduct the majority of their activities as projects and/or provide project over functional approaches.
question

Project Calendar
answer

A calendar that identifies working days and shifts that are available for schedule activities.
question

Project Charter
answer

A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
question

Project Communications Management
answer

——– ——– ——– inculdes the process that are required to ensure timely and appropriate planning, collection, creation, distribution, storage, retrieval management, control, monitoring, and the ultimate disposition of project information.
question

Project Cost Management
answer

——– ——– ——– includes the processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs so that the project can be completed within the approved budget.
question

Project Funding Requirements
answer

Forecast project costs to be paid that are derivated from the cost baseline for total or periodic requirements, including projected expenditures plus anticipated liabilities.
question

Project Governance
answer

The alignment of project objectives with the strategy of the larger organization by the project sponsor and project team. A ——– ——– is defined by and is required to fit within the larger context of the program or organization sponsoring it, but is separate from organizational governance.
question

Project Human Resource Management
answer

——– ——– ——– ——– inculdes the processes that organize, manage, and lead the project team.
question

Project Initiation
answer

Launching a process that can result in the authorization of a new project.
question

Project Integration Management
answer

——– ——– ——– includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.
question

Project Life Cycle
answer

The series of phases that a project passes through from its initiation to its closure.
question

Project Management
answer

The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements.
question

Project Management Body of Knowledge
answer

An inclusive term that describes the sum of knowledge within the profession of project management. As with other professions, such as law, medicine, and accounting, the ——– ——– ——– rests with practitioners and academics that apply and advance it. The complete ——– ——– ——– ——– ——– includes proven traditional practices that are widely applied and innovative practices that are emerging in the professions. ——– ——– ——– includes both published and unpublished materials. This ——– ——– ——– is constantly evolving.PMI’s ——– ——– ——– ——– ——– identifies a subset of the ——– ——– ——– ——– ——– that is generally recognized as good practice.
question

Project Management Information System
answer

An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outpus of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems.
question

Project Management Knowledge Area
answer

An identified area of project management defined by its knowledge requirements and described in terms of its component processes, practices, inputs, outputs, tools, and techniques.
question

Project Management Office (PMO)
answer

An organizational structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques.
question

Project Management Plan
answer

The document that describes how the project will be execute, monitored and controlled.
question

Project Management Process Group
answer

A logical grouping of project management inputs, tools and techniques, and outputs. The ——– ——– ——– ——– include initiating processes, planning processes, executing processes, monitoring and controlling processes, and closing processes. ——– ——– ——– ——– are not project phases.
question

Project Management Staff
answer

The members of the project team who perform project management activities such as schedule, communications, risk management, etc.
question

Project Management System
answer

The aggregation of the processes, tools, techniques, methodologies, resources, and procedures to manage a project.
question

Project Management Team
answer

The members of the project team who are directly involved in project management activities. On some smaller projects, the project management team may include virtually all of the project team members.
question

Project Manager (PM)
answer

The person assigned by the performing organization to lead the team members and their interrelationships for a specific project.
question

Project Organization Chart
answer

A document that graphically depicts the project team members and their interrelationships for a specific project.
question

Project Phase
answer

A collection of logically related project activities that culminates in the completion of one or more deliverables.
question

Project Procurement Management
answer

Project Procurement Management includes the processes necessary to purchase or acquire products, service, or results needed from outside the project team.
question

Project Quality Management
answer

——– ——– ——– includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken.
question

Project Risk Management
answer

——– ——– ——– includes the processes of conducting risk management planning, identification, analysis, responses planning, and controlling risk on a project.
question

Project Schedule
answer

An output of a schedule model that presetns linked activities with planned dates, durations, milestones, and resources.
question

Project Schedule Network Diagram
answer

A graphical representation of the logical relationships among the project schedule activities.
question

Project Scope
answer

The work performed to deliver a product, service, or result with the specified features and functions.
question

Project Scope Management
answer

——– ——– ——– includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
question

Project Scope Statement
answer

The description of the project scope, major deliverables, assumptions, and constraints.
question

Project Stakeholder Management
answer

——– ——– ——– includes the processes required to identitfy the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholde expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution.
question

Project Team
answer

A set of individuals who support the project manager in performing the work of the project to achieve its objectives.
question

Project Team Directory
answer

A documented list of project team members, their project roles, and communication information.
question

Project Time Management
answer

——– ——– ——– includes the processes required to manage the imely completion of the project.
question

Projectized Organization
answer

Any organizational structure in which the project manager has full authority to assign priorities, apply resources, and direct the work of persons assigned to the project.
question

Proposal Evaluation Techniques
answer

The process of reviewing proposals provided by suppliers to support contract award decisions.
question

Prototypes
answer

A method of obtaining early feedback on requirements by providing a working model of the expected product before actually building it.
question

Quality
answer

The degree to witch a set of inherint characteristics fulfulls requirements.
question

Quality Audits
answer

A quality audit is a structures, independent process to determine if project activities comply with organizational and project policies, processes, and procedures.
question

Quality Checklists
answer

A structured tool used to verify that a set of required steps has been performed.
question

Quality Control Measurements
answer

The documented results of control quality activities.
question

Quality Function Deployment (QFD)
answer

A facilitated workshop technique that helps to determine critical characteristic for new product development.
question

Quality Management and Control Tools
answer

They are a type of quality planning tools used to link and sequence the activities identified.
question

Quality Management Plan
answer

A component of the project or program management plkan that describes how an organization’s quality policies will be implemented.
question

Quality Management System
answer

The organizational framework whose structure provides the policies, processes, procedures, and resources required to implement the qualty management plan. The typical project quality management plan shoul be compatible to the organization’s ——– ——– ——–.
question

Quality Metrics
answer

A description of a project or product attribute and how to measure it.
question

Quality Policy
answer

A policy specific to the Project Quality Management Knowledge Area, it establishes the basic principles that shoul govern the organization’s actions as it implements its system for quality management.
question

Quality Requirement
answer

A condition or capability that will be used to assess conformance by validating the acceptability of an attribute for the quality of a result.
question

Quantitative Risk Analysis and Modeling Techniques
answer

Commonly used techniques for both event-oriented and project-oriented analysis approaches.
question

Questionnaires and Surveys
answer

Written sets of questions designed to quickly accumulate information from a large number of respondents.
question

RACI
answer

A comon type of responsability assignment matrix that uses responsible, accountable, consult, and inform statuses to define the involvement of stakeholdes in project activities.
question

Records Management System
answer

A specific set of processes, related control functions, and tools that are consolidated and combined to record and retain information about the project.
question

Regression Analysis
answer

An analytic technique where a series of input variables are examined in relation to their corresponding output results in order to develop a mathematical or statistical relationship.
question

Regulation
answer

Requirements imposed by a governmental body. There requirements can establish product, process, or service characteristics, including applicable administrative provisions that have government-mandated compliance.
question

Reporting Systems
answer

Facilities, processes, and procedures used to generate of consolidate repots from one or more information management systems and facilitate report distribution to the project stakeholders.
question

Request for Information (RFI)
answer

A type of procurement document whereby the buyer requests a potential seller to provide various pieces of information related to a product or service or seller capability.
question

Request for Proposal (RFP)
answer

A type of procurement document used to request proposals from prospective sellers of products or services. In some application areas, it may have a narrower or more specific meaning.
question

Request for Quotation (RFQ)
answer

A type of procurement document used to request price quotations from prospectices sellers of common or standard products or services. Sometimes used in place of request for proposal and, in some application areas, it may have a narrower or more specific meaning.
question

Requested Change
answer

A formally documented change request that is submitted for approval to the integrated change control process.
question

Requirement
answer

A condition or capability that is required to be present in a product, service, or result to satisfy a contract or other formally imposed specification.
question

Requirements Documentation
answer

A description of how individual requirements meet the business need for the project.
question

Requirements Management Plan
answer

A component of the project or program management plan describes how requirements will be analyzed, documentet, and managed.
question

Requirements Traceability Matrix
answer

A grid that links product requirements from their origin to the deliverables that satify them.
question

Reserve
answer

A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management ——–, contingency ——– ) to provide further detail on what types of risk are meant to be mitigated.
question

Reserve Analysis
answer

An analytical technique to detemrine the essentail features and relationshops of components in the project management plan to establish a reserve for the schedule duration, budget, estimated cost, or funds for a project.
question

Residual Risk
answer

A risk that remains after risk responses have been implemented.
question

Resource
answer

Skilled human resources (specific disciplines either individually or in crews or teams), equipment, services, supplies, commodities, material, budget, or funds.
question

Resource Breakdown Structure
answer

A hierarchical representation of resources by category and type.
question

Resource Calendar
answer

A calendar that identifies the working days and shifts on which each specific resource is available.
question

Resource Histogram
answer

A bar chart showing the amount of time that a resource is scheduled to work over a series of time periods. Resorce availability may be depicted as a line for comparison purposes. Contrasting bars may sho actual amounts of resources used as the project progresses.
question

Resource Leveling
answer

A technique in which start and finish dates are adjusted based on resource constraints with the goal of balancing demand for resources with the available supply.
question

Resource Optimization Techniques
answer

A technique that is used to adjust the start and finish dats of activities that adjust planned resource use to be equal to or less than resource availability.
question

Resource Smoothing
answer

A technique which adjusts the activities of a schedule model such that the requirement for resources on the project do not exceed certain predefined resource limits.
question

Responsibility
answer

An assignment that can be delegated within a project management plan such that the assigned resource incurs a duty to perform the requirements of the assignment.
question

Responsibility Assignment Matrix (RAM)
answer

A grid that shows the project resources assigned to each work package.
question

Result
answer

An output from performing project management processes and activities. ——– include outcomes (e.g., integrated systems, revised process, restructured organization, tests, trained personnel, etc.) and document (e.g., policies, plans, studies, procedures , specifications, reports, etc.).
question

Rework
answer

Action taken to bring a defective or nonconforming component into compliance with requirements or specifications.
question

Risk
answer

An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.
question

Risk Acceptance
answer

A risk response strategy whereby the project team decides to acknowledge the risk and not take any action unless the risk occurs.
question

Risk Appetite
answer

The degree of uncertainty an entity is willing to take on, in anticipation of a reward.
question

Risk Audits
answer

Examination and documentation of the effectiveness of risk responses in dealing with identified risks and their root causes, as well as the effectiveness of the risk management process.
question

Risk Avoidance
answer

A risk response strategy whereby the project team acts to eliminate the threat or protect the project from its impact.
question

Risk Breakdown Structure (RBS)
answer

A hierarchical representation of risks according to their risk categories.
question

Risk Categorization
answer

Organization by sources of risk (e.g., using the RBS), the area of the project affected (e.g., using WBS), or othe useful category (e.g., project phase) to determine the areas of the project most exposed to the effects of uncertainty.
question

Risk Category
answer

A group of potential causes of risk.
question

Risk Data Quality Assessment
answer

Technique to evaluate the degree to which the data about risks is useful for risk management.
question

Risk Management Plan
answer

A component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed.
question

Risk Mitigation
answer

A risk response strategy whereby the project team acts to reduce the probability of occurence or impact of a risk.
question

Risk Reassessment
answer

——– ——– is the identification of new risks, reassessment of current risks, and the closing of risks that are outdated.
question

Risk Register
answer

A document in which the results of risk analysis and risk response planning are recorded.
question

Risk Threshold
answer

Measure of the level of uncertainty or the level of impact at which a stakeholder may have a specific interest. Below that ——– ——–, the organization will accept the risk. Above that ——– ——–, the organization will not tolerate the risk.
question

Risk Tolerance
answer

The degree, amount, or volume of risk that an organization or individual will withstand.
question

Risk Transference
answer

A risk response strategy whereby the project team shifts the impact of a threat ro a third party, together with ownership of the response.
question

Risk Urgency Assessment
answer

Review and determiation of the timing of actions that may need to occur sooner than other risk items.
question

Role
answer

A defined function to be performed by a project team member, such as testing, filing, inspecting, or coding.
question

Rolling Wave Planning
answer

An iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level.
question

Root Cause Analysis
answer

An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A ——– ——– ——– underlie more thant one variance or defect or risk.
question

Scatter Diagram
answer

A correlation chart that uses a regression line to explain or to predict how the change in an independent variable will change a dependent variable.
question

Schedule Baseline
answer

The approved version of a schedule model that can be changed only through formal change control procedures and is used as a basis for comparison to actual results.
question

Schedule Compression
answer

Techniques used to shorten the schedule duration without reducing the project scope.
question

Schedule Data
answer

The collection of information for describing and controlling the schedule.
question

Schedule Foercasts
answer

Estimates or predictions of conditions and events in the project’s future based on information and knowledge available at the time the schedule is calculated.
question

Schedule Management Plan
answer

A component of the project management plan that establishes the criteria and the activities for developing, monitoring, and controlling the schedule.
question

Schedule Model
answer

A representation of the plan for executing the project’s activities including durations, dependencies, and other planning information, used to produce a project schedule along with other scheduling artifacts.
question

Schedule Network Analysis
answer

The technique of identifying early and late start dates, as well as early and late finish dates, for the uncompleted portions of project schedule activities.
question

Schedule Network Templates
answer

A set of activities and relationships that have been established that can be used repeatedly for a particular application area or an aspect of the project where a prescribed sequence is deisred.
question

Schedule Performance Index (SPI)
answer

A measure of schedule efficiency expressed as the ratio of earned value to planned value.
question

Schedule Variance (SV)
answer

A measur of schedule performance expressed as the difference between the earned value and the planned value.
question

Scheduling Tool
answer

A tool that provides schedule component names, definitions, structural realtionships, and formats that support the application of a scheduling method.
question

Scope
answer

The sum of the products, services, and results to be provided as a project.
question

Scope Baseline
answer

The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary, that can be changed only through formal change control procedures and is used as a basis for comparison.
question

Scope Change
answer

Any change to the project scope. A ——– ——– almost always requires an adjustement to the project cost or schedule.
question

Scope Creep
answer

The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources.
question

Scope Management Plan
answer

A component of the project or program management plan that describes how the scope will be defined, developed, monitored, controlled, and verified.
question

Secondary Risk
answer

A risk that arises as a direct result of implementing a risk response.
question

Selected Sellers
answer

The selles which habe been selected to provide a contracted set of services or products.
question

Seller
answer

A provider or supplier of products, services, or results to an organization.
question

Seller Proposals
answer

Formal responses from sellers to a request for proposal or other procurement documentspecifying the priice, commercial terms of sale, and technical specifications or capabilities the seller will do for the requesting organization that, if accepted, would bind the seller to perform the resulting agreement.
question

Sensistivity Analysis
answer

A quantitative risk anylsis and modeling technique used to help determine which risks have the most potential impact on the project. It examines the extent to which the uncertainty of each project element affects the objective being examined when all other uncertain elements are held at their baseline valus. The typical display of results is in the form of a tornado diagram.
question

Sequence Activities
answer

The process of identifying and documenting relationships among the project activities.
question

Seven Basic Quality Tools
answer

A standard toolkit used by quality management professionals who are responsible for planning, monitoring, and controlling the issues related to quality in an organization.
question

Simulation
answer

A ——– usesa project model that translates the uncertainties at a detailed level into their potential impact on objectvies that are expressed at the level of the total project. Project ——– use computer models and estimates of risk, usually expressed as a probability of possible costs or durations at a detailled work level, and re typically performed using Monte Carlo analysis.
question

Source Selection Criteria
answer

A set of attributes desired by the buyer which a seller is required to meet or exceed to be selected for a contract.
question

Specification
answer

A document that specifies, in a complete, precise, verifiable manner, the requirements, desing, behavior, or other characteristics of a system, component, product, result, or service and the procedures for determining whether these provisions have been satisfied. Examples are: requirement ——–, design ——–, product ——–, and test ——–.
question

Specification Limits
answer

The area, on either side of the centerline, or mean, of data plotted on a control chart that meets the customer’s requirements for a product or service. This area may be greater than or less than the area defined by the control limits.
question

Sponsor
answer

A person or group who provides resources and support for the project, program, or portfolio and is accountable for enabling success.
question

Sponsoring Organization
answer

The entity responsible for providing the project’s sponsor and a conduit for project funding or other project resources.
question

Staffing Management Plan
answer

A component of the human resource plan that describes when and how project team members will be acquired and how long they will be needed.
question

Stakeholder
answer

An individual, group, or organization who may affect, be affected by, or perceive itself to be affectedby a decision, activity, or outcome of a project.
question

Stakeholder Analysis
answer

A technique of systematically gathering and analyzing quantitative and qualitative information to determine whose interests should be taken into account throughout the project.
question

Stakeholder Management Plan
answer

The ——– ——– ——– is a subsidiary plan of the project management plan that defines the processes, procedures, tools, and techniques to effectively engage stakeholders in project decisions and execution based on the analysis of their needs, interests, and potential impact.
question

Stakeholder Register
answer

A project document including the identification, assessment, and classification of project stakeholders.
question

Standard
answer

A document that provides , for common and repeated use, ruls, guidelines, or characteristics for activities or their results, aimed at the achievement of the optimum degree of order in a given context.
question

Start Date
answer

A point in time associated with a schedule activity’s start, usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, target, baseline, or current.
question

Start-to-Finish (SF)
answer

A logical realtionship in which a successor activity cannot finish until a predecessor activity has started.
question

Start-to-Start (SS)
answer

A logical relationship in which a successor activity cannot start until a predecessor activity has started.
question

Statement of Work (SOW)
answer

A narrative description of products, services, or results to be delivered by the project.
question

Statistical Sampling
answer

Choosing part of a population of interest for inspection.
question

Subnetwork
answer

A subdivision (fragment) of a project schedule network diagram, usually representing a subproject or a work package. Often used to illustrate or study some potential or proposed schedule condition, such as changes in preferential schedule logic or project scope.
question

Subproject
answer

A smaller portion of the overall project created when a project is subdivided into more manageable components or pieces.
question

Successor Activity
answer

A dependent activity that logically comes after another activity in a schedule.
question

Summary Activity
answer

A group of related schedule activities aggregated and displayed as a single activitiy.
question

SWOT Analysis
answer

Analysis of strenghs, weaknesses, opportunities, and threats of an organization, project, or option.
question

Tailor
answer

The act of carefully selecting process and related inputs and outputs contained within the PMBOK Guide to determine a subset of specific processes that will be included within a project’s overall management approach.
question

Technique
answer

A defined systematic procedure employed by a human resource to perform an activity to produce a product or result or deliver a service, and that may employ one or more tools.
question

Templates
answer

A partially complete document in a predefined format that provides a defined structure for collecting, organizing, and presenting information and data.
question

Threat
answer

A risk that would have a negative effect on one or more project objectives.
question

Three-Point Estimate
answer

A technique used to estimate cost or duration by applying an average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates.
question

Threshold
answer

A cost, time, quality, technical, or resource value used as a parameter, and which may be included in product specifications. Crossing the ——– should trigger some action, such as generating an exception report.
question

Time and Material Contract (T&M)
answer

A type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed-rpice contracts. ——– ——– ——– ——– resemble cost-reimbursable type arrangements in that they have no definitce end, because the full value of the arrangement is not defined at the time of the ward. Thus, ——– ——– ——– ——– can grow in contract value as if they were cost-reimbursable-type arrangements. Conversely, ——– ——– ——– ——– can also resemble fixed-price arrangements. Foer example, the unit rates are preset by the buyer and seller, when both parties agree on the rates for the category of senior engineers.
question

Time-Scaled Schedule Network Diagram
answer

Any project schedule network diagram drawn in such a way that the positioning and length of the schedule activity represents its duration. Essentially, it is a bar chart that includes schedule network logic.
question

To-Complete Performance Index (TCPI)
answer

A measure of the cost performance that is required to be achieved with the remaining resources in order to meet a specified management goal, expressed as the ratio of the cost to finish the outstanding work to the remaining budget.
question

Tolerance
answer

The quantified description of acceptable variation for the quality requirement.
question

Tornado Diagram
answer

A special type of bar chart used in sensitivity analysis for comparing the relative importance of the variables.
question

Tool
answer

Something tangible, such as a template or software program, used in performing an activity to produce a product or result.
question

Total Float
answer

The amount of time that a schedule activity can be delayed or extended from its early start date without delaying the project finish date or violating a schedule constraint.
question

Tree Diagram
answer

A systematic diagram of a decomposition hierarchy used to visualize as parent-to-child relationships a systematic set of rules.
question

Trend Analysis
answer

An analytical technique that uses mathematical models to forecast future outcomes based on historical results. It is a method of determining the variance from a baseline of a budget, cost, schedule, or scope parameter by using prior progress reporting periods’ data and projecting how much that parameter’s variance from baseline might be at some future point in the project if no changes are made in executing the project.
question

Trigger Condition
answer

An event or situation that indicates that a risk is about to occur.
question

Unanimity
answer

Agreement by everyone in the group on a single course of action.
question

Validate Scope
answer

The process of formalizing acceptance of the completed project deliverables.
question

Validation
answer

The assurance that a prodcut, service, or system meets the needs of the customer and other identified stakholders. It often involves acceptance and suitability with external customers.
question

Value Engineering
answer

An approach used to optimze project life cycle costs, save time, increase profits, improve quality, expand market share, solve problem, and/or use resources more effectively.
question

Variance
answer

A quantifable deviation, departure, or divergence away from a known baseline or expected value.
question

Variance Analysis
answer

A technique for determining the cause and degree of difference between the baseline and actual performance.
question

Variance at Completion (VAC)
answer

A projection of the amount of budget deficit or surplus, expressed as the difference between the budget at completion and the estimate at completion.
question

Variation
answer

An actual condition that is different from the expected condition that is contained in the baseline plan.
question

Velocity
answer

A measure of a team’s productivity rate at which the deliverables are produces, validated, and accepted within a predefined interval. ——– is a capacity planning approach frequently used to forecast future project work.
question

Verification
answer

The evaluation of whether or not a product, service, or system complies with a regulation, requirement, specification, or imposed condition. It is often an interanl process.
question

Verified Deliverables
answer

Completed project deliverables that have been checked and confirmed for correctness through the Control Quality process.
question

Voice of the Customer
answer

A planning technique used to provide products, services, and results that truly reflect customer requirements by translating those customer requirements into the appropriate technical requirements for each phase of project development.
question

WBS Dictionary
answer

A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure.
question

Weighted Milestone Method
answer

An earned value method that divides a work package into measurable segments, each ending with an observable mileston, and then assigns a weighted value to the achievement of each mileston.
question

What-If Scenario Analysis
answer

The process of evaluating scenarios in order to predict their effect on project objectives.
question

Work Authorization
answer

A permission and direction, typically written, to begin work on specific schedule activity or work package or control account. It is a method for sanctioning project work to ensure that the work is done by the identified organization, at the right time, and in the proper sequence.
question

Work Authorization System
answer

A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and in the proper sequence. It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations.
question

Work Breakdown Structure (WBS)
answer

A hierarchical decompostion of the total scopeof work to be carried out by the project team to accomplish the project objectives and create the required deliverables.
question

Work Breakdown Structure Component
answer

An entry in the work breakdown structure that can be at any level.
question

Work Package
answer

The word defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed.
question

Work Performance Data
answer

The raw observations and measurements identified during activities being performed to carry out the project work.
question

Work Performance Information
answer

The performance data collected from various controlling processes, analyzed in context and integrated based on relationshops across areas.
question

Work Performance Reports
answer

The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness.
question

Workaround
answer

A response to a threat that has occured, for which a prior response had not been planned or was not effective.
question

Activity Network Diagrams
answer

A graphical representation of the logical relationships among the project schedule activities.
question

Buffer
answer

A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management ——–, contingency ——– ) to provide further detail on what types of risk are meant to be mitigated.
question

Charter
answer

A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
question

Contingency Allowance
answer

A provision in the project management plan to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management ——–, contingency ——– ) to provide further detail on what types of risk are meant to be mitigated.
question

Dependency
answer

A dependency between two activities, or between an activity and a milestone.
question

Fishbone diagram
answer

A decomposition technique that helps trace an undesirable effect back to ist root cause.
question

Float
answer

Also called slack. The amount of time that a schedule activity can be delayed or extended from its early start date without delaying the project finish date or violating a schedule constraint.
question

Hammock Activity
answer

A group of related schedule activities aggregated and displayed as a single activitiy.
question

Hard Logic
answer

A relationship that is contractually required or inherent in the nature of the work.
question

Leveling
answer

A technique in which start and finish dates are adjusted based on resource constraints with the goal of balancing demand for resources with the available supply.
question

Life Cycle
answer

The series of phases that a project passes through from its initiation to its closure.
question

Network
answer

A graphical representation of the logical relationships among the project schedule activities.
question

Network Analysis
answer

The technique of identifying early and late start dates, as well as early and late finish dates, for the uncompleted portions of project schedule activities.
question

Performance Reporting
answer

The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness.
question

Performance Reports
answer

The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness.
question

Phase
answer

A collection of logically related project activities that culminates in the completion of one or more deliverables.
question

Preferential Logic
answer

A relationship that is established base on knowledge of best practices within a particual application area or an aspect of the project where a specific sequence is desired.
question

Preferred Logic
answer

A relationship that is established base on knowledge of best practices within a particual application area or an aspect of the project where a specific sequence is desired.
question

Project Statement of Work
answer

A narrative description of products, services, or results to be delivered by the project.
question

Schedule
answer

An output of a schedule model that presetns linked activities with planned dates, durations, milestones, and resources.
question

Soft Logic
answer

A relationship that is established base on knowledge of best practices within a particual application area or an aspect of the project where a specific sequence is desired.
question

Team Members
answer

A set of individuals who support the project manager in performing the work of the project to achieve its objectives.

Get instant access to
all materials

Become a Member