Managerial Accounting Chap 11 – Flashcards

Unlock all answers in this set

Unlock answers
question
What are the two standards, or norms for measuring performance?
answer
-price- how much should be paid for each unit of output -quantity -how much an input should be used to make a product or service
question
Management by exception
answer
a practice where deviations from standards deemed significant are brought to the attention of management
question
Variance analysis cycle
answer
1. Prepare standard cost performance report 2. analyze variances 3. identify questions 4. receive explanations 5. take corrective actions 6. conduct next period's operations
question
Who sets standard costs?
answer
accountants, engineers, purchasing agents, and production managers
question
Setting standard costs
answer
ideal standards (requiring 100% efficiency) v. practical standards currently attainable with reasonable and efficient effort
question
Where are the setting of direct material standards summarized?
answer
Bill of Materials
question
Example of setting standards
answer
Six Sigma advocates have sought toeliminate all defects and waste, rather than continually build them into standards. As a result allowances for waste andspoilage that are built into standardsshould be reduced over time.
question
What can rate standards be used for Direct Labor?
answer
rate for a mix of wages earned
question
What can time standards be used for for Direct Labor?
answer
Use time and motion studies for each labor operation.
question
Price Variance
answer
(AQ × AP) - (AQ × SP)
question
Quantity Variance
answer
(AQ × SP) - (SQ × SP)
question
What can price variance be used to do?
answer
it can be used to identify purchasing problems
question
Why is the standard price used to compute the quantity variance?
answer
The standard price is used to compute the quantity variance so that the production manager is not held responsible forthe purchasing manager's performance.
question
Example of material variances-Production manager
answer
I am not responsible for this unfavorable material quantity variance. You purchased cheap material, so my people had to use more of it.
question
Example of material variances: purchasing manager
answer
Your poor scheduling sometimes requires me to rush order material at a higher price, causing unfavorable price variances
question
Why are production managers usually held accountable for labor variances?
answer
Because they influence the : .mix of skill levels assigned to work tasks .level of employee motivation .quality of production supervision .quality of training
question
responsibility for labor variances- purchasing manager
answer
I think it took more time to process the materials because the Maintenance Department has poorly maintained your equipment.
question
When to investigate variances?
answer
The large favorable variances that fall to unfavorable levels
question
What are the advantages of standard costs?
answer
1. Management by exception (to know what deviates highly from standards so to investigate) 2. promotes economy and efficiency 3. simplified bookkeeping 4. enhances responsibility accounting
question
Potential problems with standard costs
answer
1. Emphasizing standards may exclude other important objectives 2. Favorable variances maybe misinterpreted 3. standard cost reports may not be timely 4. Emphasis onnegative may impact morale. 5. Invalid assumptions about the relationship between labor cost and output. 6. Continuous improvement maybe more important than meeting standards.
question
Which is the only value-added time?
answer
process time
question
What is the throughout time (after product starts until goods are shipped)?
answer
Process Time + Inspection Time + Move Time + Queue Time
question
What is the delivery cycle time?
answer
From the time order is received until goods are shipped
question
Manufacturing cycle efficiency
answer
Value-added Time (aka process time)/ manufacturing cycle time
question
Fixed overhead budget variance
answer
Actual fixed overhead - Budgeted fixed overhead
question
Fixed overhead Volume variance
answer
Budgeted fixed overhead - fixed overhead applied to work in process Volume variance = FPOHR X (DH-SH)
question
FPOHR x (DH -SH)
answer
Fixed portion of the predetermined overhead rate x (Denominator hours - standard hours allowed for actual output)
question
Predetermined overhead rate
answer
Estimated total manufacturing overhead cost / Estimated total amount of the allocation base
question
Overhead applied
answer
Predetermined overhead rate x Standard hours allowed for the actual output
question
Graph showing overhead variances
answer
Slide 94
question
Variable manufacturing overhead rate variance
answer
(AH × AR) - (AH × SR)
question
The sum of the overhead variances equals
answer
the under- or overappliedoverhead cost for the period
question
Variable manufacturing overhead efficiency variance
answer
(AH × SR) - (SH × SR)