IS 5003 CHAPTER 12 – Flashcards
Unlock all answers in this set
Unlock answersquestion
A native app is one that is designed to run on a specific platform.
answer
T
question
Documentation reveals how well the system has met its original objectives.
answer
F
question
A new information system is not considered in production until conversion is complete.
answer
T
question
Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system.
answer
T
question
Gantt and PERT charts are two common formal planning tools for project management.
answer
T
question
Prototyping is more iterative than the conventional lifecycle.
answer
T
question
One problem with prototyping is that the systems constructed thereby may not be able to handle large quantities of data in a production environment.
answer
T
question
End-user-developed systems can be completed more rapidly than those developed through the conventional programming tools.
answer
T
question
Intangible benefits of an information system are those that cannot be easily quantified.
answer
T
question
Object-oriented development is more iterative and incremental than traditional structured development.
answer
T
question
Businesses can use component-based development to create their e-commerce applications.
answer
T
question
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
answer
T
question
An information systems plan shows how specific information systems fit into a company's overall business plan and business strategy.
answer
T
question
User concerns and designer concerns are usually the same at the beginning of the project.
answer
F
question
Scope describes the full length of time required to complete a project.
answer
F
question
Successful implementation of an information system requires the participation of end users in the project.
answer
T
question
Order the following steps in the systems development lifecycle in the correct sequence.
A) Systems analysis, systems design, programming, testing, conversion, production and maintenance
B) Systems analysis, systems design, programming, conversion, testing, production and maintenance
C) Systems design, systems analysis, programming, conversion, production and maintenance, and testing
D) Systems design, systems analysis, programming, testing, conversion, production and maintenance
answer
A
question
Which process develops a detailed description of the functions that a new information system must perform?
A) Feasibility study
B) Requirements analysis
C) Systems design
D) Test plan development
answer
B
question
The entire system-building effort should be driven by:
A) organizational change.
B) feasibility studies.
C) data.
D) user information requirements.
answer
D
question
Systems design:
A) identifies the system's information requirements.
B) specifies how the new system will fulfill the information requirements.
C) identifies alternate solutions for solving the problem.
D) defines the problem and specifies its causes.
answer
B
question
Transferring data from a legacy system to the new system would be defined by which system design specification category?
A) Input
B) Database
C) Manual procedures
D) Conversion
answer
D
question
Unit testing:
A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole.
C) tests each individual program separately.
D) provides the final certification that the system is ready to be used in a production setting.
answer
C
question
System testing:
A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
answer
B
question
Acceptance testing:
A) includes all the preparations for the trials.
B) tests the functioning of the system as a whole.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
answer
D
question
In a parallel conversion strategy, the new system:
A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
answer
C
question
In a direct cutover conversion strategy, the new system:
A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
answer
B
question
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed:
A) compliance.
B) production.
C) maintenance.
D) acceptance.
answer
C
question
The oldest method for building information systems is:
A) component-based development.
B) prototyping.
C) object-oriented development.
D) the systems development lifecycle.
answer
D
question
In the traditional systems development lifecycle, end users:
A) are important and ongoing members of the team from the original analysis phase through maintenance.
B) are important only in the testing phases.
C) have no input.
D) are limited to providing information requirements and reviewing the technical staff's work.
answer
D
question
As a technical project manager you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project?
A) Develop the prototype, use the prototype, revise and enhance the prototype.
B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.
C) Define the requirements, develop solutions, select the best prototype, and implement the prototype.
D) Define the requirements, develop the prototype, revise and enhance the prototype.
answer
B
question
When systems are created rapidly, without a formal development methodology:
A) end users can take over the work of IT specialists.
B) the organization quickly outgrows the new system.
C) hardware, software, and quality standards are less important.
D) testing and documentation may be inadequate.
answer
D
question
Of the following, which is the most important reason for creating a mobile version of a business's Web site?
A) Mobile devices provide access from anywhere.
B) Mobile devices use touch interfaces.
C) Mobile devices use lower bandwidth.
D) Mobile devices use different platforms.
answer
A
question
If an organization's requirements conflict with the software package chosen and the package cannot be customized, the organization should:
A) change its procedures.
B) outsource the development of the system.
C) redesign the RFP.
D) change the evaluation process.
answer
A
question
"Hidden costs," such as ________ costs, can easily undercut anticipated benefits from outsourcing.
A) vendor selection
B) hardware
C) software
D) employee salary
answer
A
question
The process of creating workable information systems in a very short period of time is called:
A) RAD.
B) JAD.
C) prototyping.
D) end-user development.
answer
A
question
This type of systems development is characterized by significantly speeding the generation of information requirements and involving users at an intense level in the systems design.
A) RAD
B) JAD
C) Prototyping
D) End-user development
answer
B
question
The term structured, when discussing structured development methodologies, refers to the fact that:
A) the finished software is highly documented.
B) the development process is highly documented.
C) the techniques are step by step, with each step building on the previous one.
D) a defined hierarchy of objects and classes are used to structure the programming.
answer
C
question
The primary tool for representing a system's component processes and the flow of data between them is the:
A) data dictionary.
B) process specifications diagram.
C) user documentation.
D) data flow diagram.
answer
D
question
You are an IT project manager for an advertising firm. The firm wishes to create an online survey tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?
A) RAD
B) JAD
C) End-user development
D) Prototyping
answer
D
question
An entire information system is broken down into its main subsystems by using:
A) high-level data flow diagrams.
B) low-level data flow diagrams.
C) process specifications.
D) structured diagrams.
answer
A
question
Object-oriented development could potentially reduce the time and cost of writing software because:
A) object-oriented programming requires less training.
B) iterative prototyping is not required.
C) objects are reusable.
D) a single user interface object can be used for the entire application.
answer
C
question
Which of the following is a technique used to create Web sites that will conform to the screen resolution of the user?
A) Native design
B) Responsive design
C) End-user design
D) Multi-platform design
answer
B
question
________ provides software tools to automate development methodologies and reduce the amount of repetitive work in systems development.
A) CASE
B) CAD
C) JAD
D) RAD
answer
A
question
________ refers to the application of knowledge, skills, tools, and techniques to achieve specific targets within specified budget and time constraints.
A) Systems analysis
B) Systems design
C) Project management
D) Project implementation
answer
C
question
A PERT chart:
A) portrays a project as a network diagram consisting of numbered nodes that represent tasks.
B) is used to evaluate project risk and time.
C) displays a horizontal bar for each project task.
D) tracks progress of, and modifications to, project tasks.
answer
A
question
You have been hired by a pharmaceutical company to evaluate its portfolio of systems and IT projects. Which types of projects would be best avoided?
A) Any high-risk projects
B) Any low-benefit projects
C) High-risk, low-benefit projects
D) None - any project might be beneficial
answer
C
question
The project risk will rise if the project team and the IS staff lack:
A) RAD experience.
B) web services.
C) the required technical expertise.
D) CASE tools.
answer
C
question
Users prefer systems that:
A) are oriented to facilitating organizational tasks and solving business problems.
B) work with existing DBMS.
C) are able to provide optimum hardware and software efficiency.
D) are capable of storing much more data than they need.
answer
A
question
A test plan includes all the preparations for the series of tests to be performed on the system.
answer
T
question
A prototype is the final working version of an information system.
answer
F
question
A(n) ________ is a detailed list of questions submitted to external vendors to determine how well they meet the organization's specific requirements.
A) RFP (Request for proposals)
B) RFQ (request for quotations)
C) RAD (rapid application development)
D) JAD (Joint application development)
answer
A