Aggregate plans define output levels over a planning horizon of:
a. four to twelve weeks.
b. one to two years.
c. three to six months.
d. six to twelve months.
answer
B
question
Which of the following is NOT one of the general decision options available in developing aggregate plans in the face of fluctuating demand?
a. Supplier changes
b. Production rate changes
c. Workforce changes
d. Inventory changes
answer
A
question
Which of the following is the correct sequence for disaggregating an aggregate production plan?
a. Materials requirements planning (MRP), capacity requirements planning (CRP), and master production scheduling (MPS)
b. Master production scheduling (MPS), materials requirements planning (MRP), and capacity requirements planning (CRP)
c. Capacity requirements planning (CRP), materials requirements planning (MRP), and master production scheduling (MPS)
d. Master production scheduling (MPS), capacity requirements planning (CRP), and materials requirements planning (MRP)
answer
B
question
The master production schedule (MPS) is usually determined by the known customer orders, also known as firm orders, in:
a. make-to-stock industries.
b. make-to-assemble industries.
c. assemble-to-order industries.
d. make-to-order industries.
answer
D
question
Components can be any of the following EXCEPT:
a. raw materials.
b. purchased parts.
c. manufactured parts.
d. end items.
answer
D
question
Concepts closely associated with materials requirements planning (MRP) include all of the following EXCEPT:
a. dependent demand.
b. lot sizing.
c. labor resources.
d. time phasing.
answer
C
question
Which of the following is NOT a hierarchical record that is based on dependent demand?
a. Bill of materials (BOM)
b. Bill of resources (BOR)
c. Bill of labor (BOL)
d. Bill of lading (BOL)
answer
D
question
The process of using the logic of dependent demand to calculate the quantity and timing of orders for all subassemblies and components that go into and support the production of the end items is called:
a. master scheduling.
b. disaggregation.
c. MRP explosion.
d. load reporting.
answer
C
question
The length of time buckets in materials requirements planning (MRP) is usually a ________ .
a. day
b. quarter
c. week
d. month
answer
C
question
The periodic-order quantity (POQ) orders a quantity equal to the gross requirement quantity in one or more predetermined time periods:
a. minus the projected on-hand quantity of the previous time period.
b. minus the projected on-hand quantity of one or more predetermined time periods.
c. minus the projected on-hand quantity of the current time period.
d. minus the projected on-hand quantity of the next time period.
answer
A
question
Lot-for-lot (LFL) is an order schedule that covers each time period's:
a. gross requirements.
b. planned order releases.
c. scheduled receipts.
d. projected on-hand inventory.
answer
A
question
Using the periodic-order quantity (POQ) lot sizing rule, the projected on-hand inventory will:
a. be a positive integer at the end of the POQ time interval.
b. be a negative integer at the end of the POQ time interval.
c. equal zero at the end of the POQ time interval.
d. equal infinite at the end of the POQ time interval.
answer
C
question
The economical time interval used in the periodic-order quantity lot sizing approach is determined by dividing the economic order quantity by:
a. annual demand.
b. number of orders.
c. on-hand inventory.
d. gross requirements.
answer
A
question
An economic-based periodic-order quantity (POQ) model is best applied when:
a. inventory-carrying costs and setup/order costs are very high.
b. inventory-carrying costs are high and setup/order costs are low.
c. inventory-carrying costs and setup/order costs are moderate.
d. inventory-carrying costs are low and setup/order costs are high.
answer
C
question
A work center load report provides details about:
a. gross requirements.
b. capacity requirements.
c. scheduled receipts.
d. planned order receipts.
answer
B
question
The words "product family," "budget allocation" and "long-term" fit best with which level of the generic framework for resource planning?
A. Aggregate planning Level 1
B. Disaggregation Level 2
C. Execution Level 3
D. Capacity requirements planning
answer
A
question
Which of the following is not an aggregate planning decision option?
A. Pricing and promotions
B. Subcontracting
C. Layoffs
D. Building a new plant
answer
D
question
The primary output of an MRP system is a time-phased report that gives all of the following except
A. The facilities managers a detailed schedule for acquiring additional factory space
B. The accounting and financial functions production information that drives cash flow, budgets, and financial needs
C. The production managers a detailed schedule for manufacturing the product and controlling manufacturing inventories
D. The purchasing department a schedule for obtaining raw material and purchased items
answer
A
question
A(n) ____ is a statement of how many finished items are to be produced and when they are to be produced.
A. Aggregate Plan
B. Master Production Schedule
C. Material Requirements Plan
D. Capacity Requirements Plan
answer
B
question
Assigning people to tasks, setting priorities for jobs and scheduling equipment fits best with which level of the generic framework for resource planning?
A. Aggregate planning Level 1
B. Disaggregation Level 2
C. Execution Level 3
D. Capacity requirements planning
answer
C
question
The Lot-for-Lot (LFL) rule
A. Minimizes purchase or setup costs
B. Allows the firm to take advantage of quantity discounts (price breaks) by suppliers
C. Is best applied when inventory carrying costs are high and setup/order costs are low
D. Masks the true nature of dependent demand
answer
C
question
An inventory item can be
A. Only a parent
B. Only a component
C. Both a parent and a component
D. Either a parent or a component, but not both
answer
C
question
If forecast demand exceeds the total factory or supply capacity, managers might simply decide not to meet forecast demand. This decision would most likely be made at which planning level?
A. Aggregate planning Level 1
B. Disaggregation Level 2
C. Execution Level 3
D. Capacity requirements planning
answer
A
question
The direct inputs to material requirements planning include all of the following except
A. Master Production Schedule
B. Inventory, SKU, and Transaction files
C. Bills of Material
D. Capacity Requirements Plan
answer
D
question
The purpose of aggregate planning is to
A. Minimize the work force size
B. Maximize the production rate
C. Minimize the cost of meeting demand
D. Optimize the inventory level
answer
C
question
Capacity requirements are computed by multiplying the number of units scheduled for production at a work center by
A. The unit resource requirements minus the setup time
B. The unit resource requirements plus the setup time
C. The unit resource requirements and then adding in the setup time
D. The unit resource requirements and then subtracting the setup time
answer
C