Chapter 28: Risk Management – Flashcards

Unlock all answers in this set

Unlock answers
question
Proactive risk management is sometimes described as fire fighting. A) True B) False
answer
True
question
Software risk always involves two characteristics A) fire fighting and crisis management B) known and unknown risks C) uncertainty and loss D) staffing and budget
answer
uncertainty & loss
question
Three categories of risks are A) business risks, personnel risks, budget risks B) project risks, technical risks, business risks C) planning risks, technical risks, personnel risks D) management risks, technical risks, design risks
answer
project risks technical risks business risks
question
Generic risks require far more attention than product-specific risks.
answer
False
question
A risk item checklist would contain known and predictable risks from which of these categories? A) product size B) development environment C) staff size D) process definition E) all of the above
answer
E
question
Questions that should be asked to assess the overall project risk include: A) Have top managers formally committed to support the project? B) Are end-users committed to the project and proposed system being built? C) Are requirement fully understood by development team and customers? D) Does the proposed budget have time allocated for marketing? E) a, b, and c
answer
E
question
Software risk impact assessment should focus on consequences affecting A) planning, resources, cost, schedule B) marketability, cost, personnel C) business, technology, process D) performance, support, cost, schedule
answer
performance support cost schedule
question
Risk projection attempts to rate each risk in two ways A) likelihood and cost B) likelihood and impact C) likelihood and consequences D) likelihood and exposure
answer
likelihood and consequences
question
Risk tables are sorted by A) probability and cost B) probability and impact C) probability and consequences D) probability and exposure
answer
probability and impact
question
Individual team members can make their own estimate for a risk probability and then develop a consensus value.
answer
True
question
Which factors affect the probable consequences likely if a risk does occur? A) risk cost B) risk timing C) risk scope D) risk resources E) both b and c
answer
E
question
The reason for refining risks is to break them into smaller units having different consequences.
answer
False
question
Effective risk management plan needs to address which of these issues A) risk avoidance B) risk monitoring C) contingency planning D) all of the above
answer
D
question
Risk monitoring involves watching the risk indicators defined for the project and not determining the effectiveness of the risk mitigation steps themselves.
answer
True
question
Hazard analysis focuses on the identification and assessment of potential hazards that can cause A) project termination B) schedule slippage C) cost overruns D) an entire system to fail
answer
D
question
Risk information sheets (RIS) are never an acceptable substitute for a full risk mitigation, monitoring, and management (RMMM) plan. A) True B) False
answer
B
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New