Ch. 3 Quiz – Midterm Prep (276) – Flashcards
Unlock all answers in this set
Unlock answersquestion
For a project manager, monitoring _____.
answer
includes monitoring the progress of the project, evaluating results, and taking corrective action when necessary to stay on target
question
Project scheduling involves all of the following EXCEPT ____.
answer
defining project constraints
question
The first step in the creation of a PERT/CPM chart is to ____.
answer
identify all the project tasks
question
Many project managers find ____ charts more helpful for scheduling, monitoring, and controlling projects.
answer
PERT/CPM
question
Ano ____ chart displays complex task patterns and relationships.
answer
PERT/CPM
question
A task is any work that requires the use of company resources including all of the following EXCEPT ____.
answer
controlling capital
question
In a PERT/CPM chart, each task has all of the following EXCEPT ano ____.
answer
reference to successor tasks
question
When several tasks can start at the same time, each is called ano ____ task.
answer
concurrent
question
Two or more concurrent tasks often depend on a single prior task, which is called ano ____ task.
answer
predecessor
question
When two or more concurrent tasks depend on a single prior task, the concurrent tasks are called ____ tasks.
answer
successor
question
Project managers always must be aware of the ____ path, so they can monitor the vital tasks and keep the project on track.
answer
critical
question
When maintaining schedules, if enough ____ and frequent checkpoints exist, problems will be detected rapidly.
answer
milestones
question
Open Workbench can exchange files with Microsoft Project by importing and exporting the data in ____ file format.
answer
XML
question
Microsoft offers a free ____ trial version that allows you to install, use, and evaluate Microsoft Project.
answer
60-day
question
A risk management plan includes a review of all of the following EXCEPT ____.
answer
employees
question
A continuous risk-tracking process can do all of the following EXCEPT ____.
answer
prevent human resource turnover issues
question
All of the following are possible causes of cost overruns related to human resource factors EXCEPT ____.
answer
inaccurate TCO forecast
question
Problems with timetables and project milestones can indicate ____.
answer
all of the above
question
When a project manager first recognizes that a project is in trouble, the options available to her include ____.
answer
all of the above
question
Gantt charts often are included in progress reports to show project status graphically.(T/F?)
answer
T
question
System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.(T/F?)
answer
T
question
Although a Gantt chart provides more detailed information about a project, a PERT/CPM chart offers a rapid overview that graphically displays the timing, duration, and progress of each task.(T/F?)
answer
F
question
In most systems analysis tasks, time and people are interchangeable.(T/F?)
answer
F
question
If you do not have previous experience to measure a project in a given environment, you could design a prototype or pilot system to gain technical and cost estimating experience.(T/F?)
answer
T
question
In any project, large or small, tasks depend on each other and must be performed in a sequence.(T/F?)
answer
T
question
When several tasks can take place at the same time, each is called a sequential task.(T/F?)
answer
F
question
Often, two or more concurrent tasks depend on a single prior task, which is called a successor task.(T/F?)
answer
F
question
Tasks that are not on the critical path cannot be ignored.(T/F?)
answer
T
question
Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later.(T/F?)
answer
T