Supply Demand Integration – Flashcards

Unlock all answers in this set

Unlock answers
question
Manufacturing planning and control (MPC) includes which of the following activities? I. Material management II. product marketing III. coordinating suppliers
answer
I and III
question
In the MPC process, capacity decisions (equipment, facilities, suppliers, etc.) are most likely to occur in which time horizon?
answer
long
question
In the MPC process, detailed scheduling decision are most likely to occur in which time horizon?
answer
short
question
Shop-floor systems are a part of which MPC phase?
answer
execution
question
Sales and operations planning (SOP) & demand management are a part of which MPC phase?
answer
direction setting
question
Master production scheduling (MPS) and resource planning are a part of which MPC phase?
answer
detailed planning
question
Measurement and control are a part of which MPC phase?
answer
direction setting, detailed planning & execution
question
Products that are part of a continuous production process (e.g., petroleum products) would most likely use which form of MPC?
answer
flow
question
Products that are part of a one-time production process (e.g. bridges, aircraft carriers) would most likely use which form of MPC?
answer
project
question
Updating and old MPC systems can include which of the following? I. Adding new modules or functionality II. Consideration of new decision criteria III. Removing unneeded/obsolete modules or functionality
answer
I, II, III
question
Demand management (DM) includes which of the following activities? I. Forecasting II. Product shipping III. Entering customer orders
answer
I and III
question
Demand management is the firm's connection to which of the following entities?
answer
marketplace
question
Sources of demand that are part of demand management include all of the following except.
answer
scrap products
question
Which of the following are examples of independent demand? I. Customer orders II. Shipping samples to the sales team III. Use of raw materials in production
answer
I and II
question
Which of the following are examples of dependent demand? I. Customer orders II. Using finished goods stock to build preloaded store displays III. Raw materials usage
answer
II and III
question
The customer order decoupling point is best defined as.
answer
the point in the supply chain where demand changes from dependent to independent
question
In an engineer-to-order environment, the most likely point where customer order decoupling would take place is.
answer
suppliers
question
In an assemble-to-order environment, the most likely point where customer order decoupling would take place is.
answer
work-in-process parts and components
question
In a make-to-stock environment, the most likely point where customer order decoupling would take place is.
answer
finished goods
question
In which environment is defining the customer order in terms of components and options the key focus of demand management?
answer
assemble-to-order
question
Which of the following lists properly ranks the different environments from lowest to highest need to communicate with the customer?
answer
assemble-to-order, make-to-order, engineer-to-order
question
In an assemble-to-order environment, how many different product combinations are possible if the product is make from 12 components, each of which has three different options?
answer
531, 441
question
In a make-to-stock environment, what is the key problem?
answer
balancing inventory levels with customer service requirements
question
In an engineer-to-order environment, the forecasting process is not necessary
answer
false
question
Sales and operations planning can be completed at which of the following levels? I. product family II. region III. organizational unit
answer
I, II & III
question
The lifetime of a customer order (time from receiving the order until order is fulfilled) is longest in which environment.
answer
engineer-to-order
question
The lifetime of a customer order (time from receiving the order until order is fulfilled) is shortest in which environment?
answer
make-to-stock
question
In which environment is the demand management function least likely to provide customers with promise dates?
answer
make-to-stock
question
Which types of data are captured and monitored by the demand management function? I. detailed product mix II. product pricing III. overall market trends
answer
I, II & III
question
Collaborative planning, forecasting, and replenishment (CPFR) has been defined by the Voluntary Interindustry Commerce Standards Association as a process involving how many steps?
answer
9
question
The first step in the collaborative, forecasting, and replenishment (CPFR) process is to.
answer
establish a collaborative relationship
question
The main goal of a collaborative planning, forecasting, and replenishment (CPFR) process is to.
answer
reduce the variance between supply and demand
question
A manufacturer of printer paper would most likely be what type of firm?
answer
make-to-stock
question
A manufacturer of jet airplanes would most likely be what type of firm?
answer
make-to-order
question
A local coffee house restaurant would most likely be what type of firm?
answer
assemble-to-order
question
Which of the following decisions would be most likely to be made using highly aggregated estimate of general business trends? I. individual product plans II. product line development III. constructing a new plant
answer
III only
question
Which of the following lists the planning decisions in order from highest to lowest aggregation level?
answer
strategic business unit - sales and operations planning (SOP)- master production scheduling (MPS)
question
Which of the following lists the planning decisions in order from lowest to highest data processing costs?
answer
master production scheduling (MPS) - sales and operations planning (SOP) - strategic business unit
question
Which of the following is an example of a casual model? I. product sales increasing over time II. lawn mower sales decreasing in the winter III. increasing appliance sales when housing construction increases
answer
III only
question
A forecast used for sales and operations planning is likely to cover a period of
answer
several months to a year
question
A forecast used for master production scheduling and control is likely to cover a period of
answer
several days to a few weeks
question
Regression analysis where the relationship between variable is a straight line is called
answer
linear regression
question
In regression analysis, the dependent variable could be time.
answer
false
question
In a time series analysis, time is the
answer
independent variable
question
The least squares method of linear regression minimizes I. the error of the slope II. the squared distance between each point and the line III. the error of the intercept
answer
II only
question
In a least squares regression analysis, if the value of a has been calculated as 10 and b has been found to be 100, what is the equation of the line?
answer
y=10+100x
question
Which of the following are possible components of time series demand? I. seasonal variation II. cyclical variation III. trend
answer
I, II & III
question
With additive seasonal variation, the seasonal change is constant regardless of trends.
answer
true
question
Seasonal variations are generally associated with the seasons of the year, while cyclical variations refer to other annual patterns
answer
true
question
As forecasts are extended further into the future, the prediction internal is most likely to
answer
increase
question
A moving-average forecast is often superior to a simple average because it considers only recent data
answer
true
question
An exponential smoothing forecast considers all past data
answer
true
question
In an exponential smoothing forecast, a higher level alpha will place more emphasis on recent history
answer
true
question
Compared to a moving-average forecast, an exponential smoothing forecast places more emphasis on recent history
answer
can't determine without more information
question
To make an exponential smoothing forecast more reactive to trends, a lower value of alpha should be used
answer
false
question
Mean error of a forecast provides information concerning the forecast's
answer
bias
question
Which value indicates the better forecast?
answer
cannot be determined
question
Mean absolute deviation (MAD) measures
answer
magnitude of forecast errors
question
Evaluating forecast accuracy requires an understanding of I. mean absolute deviation (MAD) II. Mean error (bias) III. Forecast costs
answer
I & II
question
Assuming that forecast errors are normally distributed, what is the relationship between mean absolute deviation (MAD) and standard deviation (SD)?
answer
SD > MAD
question
In pyramid forecasting, the "roll-up" process involves
answer
adding together family forecasts to determine the aggregate forecast
question
In pyramid forecasting, the "fore-down" process involves
answer
allocating aggregate forecast changes to product families
question
One of the most important ways to reflect special events (promotions, product changes, etc.) is to directly modify the product forecast.
answer
true
question
Sales and operations planning (SOP) provides which of the following benefits? I. key communications links for top management II. a basis to focus production resources III. detailed production plans
answer
I & II
question
The four fundamental issues in sales and operations planning are
answer
volume, mix, demand and supply
question
One role of sales and operations planning is to provide early warning when demand and supply become unbalanced.
answer
true
question
Sales and operations planning balances supply and demand at the
answer
volume level
question
Many key sales and operations planning linkages are outside the manufacturing planning and control (MPC) system.
answer
true
question
Which of the following are true? I. the sales and operations planning plan is usually stated in aggregate units II. the master production schedule is usually stated in end product units. III. the sales and operation planning plan and the master production schedule should be stated in the same units.
answer
I and II only
question
The recommended number of product groups for sales and operations planning is
answer
6-12
question
The operations plan is a form of demand forecast.
answer
false
question
The master production schedule disaggregates the operations plan.
answer
true
question
The demand management function's contribution to sales and operations planning is.
answer
ensuring that the operations plan considers all aspect of demand.
question
Advantages of the sales and operations planning process include. I. Visibility of the interaction between functional groups II. Identification of the trade-offs between functional groups III. The ability to overproduce the plan without the need for additional meetings
answer
I and II
question
Capacity planning occurs during the supply planning phase of sales and operations planning
answer
true
question
Decisions concerning the balance of supply and demand are made in the ______ phase of sales and operations planning.
answer
pre-SOP meeting
question
Mechanisms to ensure support for the sales and operations planning process can include I. informal adjustments to the plan between SOP meetings II. contracts between functional groups III. senior executive involvement
answer
II and III
question
A strategy that matches monthly supply to forecasted demand is
answer
chase
question
A strategy that maintains a consistent monthly output is
answer
level
question
In a chase strategy, if the expected demand in October is 1,000 units, and there are 24 working days in October, how much inventory should be held at the end of September if the goal is 15 days' supply?
answer
625 units
question
In a chase strategy, if planned production for the month is 10,000 units and employee productivity is 85 units per month, how many employees should be the firm employ at the beginning of the month?
answer
120
question
Top management roles in sales and operations planning include I. commitment to the process II. forcing resolution of trade-offs III. designing tools used to conduct sales and operations planning
answer
I and II
question
The primary obligation for any functional area is to "hit the plan"
answer
true
question
The sales and operations planning process is led by which team member?
answer
sales and operations planning process owner
question
Product family groups should represent?
answer
sales' and marking's view of the market
question
For the sales group, overselling the plan is as bad as underselling the plan.
answer
true
question
Strategic business unit (SBU) planning involves grouping information by
answer
products and markets
question
To ensure control of the operations plan, which of the following are necessary? I. accurate forecasts II. a transparent planning process III. clear communications of expectations
answer
I, II & III
question
Which of the following are prerequisites to implementing a master production scheduling system? I. define master production schedule (MPS) unit II. install an enterprise resource planning (ERP) system III. train an employee in MPS concepts and techniques
answer
I & III
question
The master production schedule (MPS) translates the sales and operations plan (SOP) into
answer
a specific production plan
question
The master production schedule (MPS) shows when products will physically be available to ship.
answer
false
question
A master production schedule is.
answer
neither a statement of current production nor current demand
question
The master production schedule (MPS) differs from forecast by considering. I. capacity limtis II. production costs III. the sales and operations plan (SOP)
answer
I, II & III
question
The master production schedule (MPS) must be stated in terms that relate to the producible product.
answer
true
question
The master production schedule (MPS) must be stated in terms of actual products.
answer
false
question
In which environment is a planning bill-of-material (BOM) most likely to be used?
answer
assemble-to-order
question
The master production schedule (MPS) considers preferred lot sizes when constructing the plan.
answer
true
question
Cycle stock is.
answer
inventory carried as a result of lot size requirements
question
Available-to-Promise (ATP) is likely to be least useful in which environment?
answer
make-to-stock
question
Which formula is used to calculate the projected available inventory balance?
answer
projected available inventory = previous available inventory + MPS - max (forecast, actual orders)
question
A planning bill of material is
answer
a bill of material that represents probably usage in an assemble-to-order environment
question
A super bill represents average usage of components in an assemble-to-order environment.
answer
true
question
The final assembly schedule (FAS) represents which of the following? I. the assembly plan when a planning BOM is used II. the exact set of end products to be built in an assemble-to-order environment III. the plan for moving pre-fabricated components into completed projects
answer
I, II & III
question
When the master production schedule (MPS) is frozen for some period, changes to the plan within the period are typically prohibited.
answer
true
question
Inside the demand fence, which of the following are true?
answer
available-to-promise (ATP) calculations ignore forecasts
question
Inside the planning fence, which of the following are true?
answer
changes to production orders are not allowed
question
One key to avoiding an overstated master production schedule (MPS) is to
answer
force the MPS to match the production plan (in terms of total units)
question
Supporting information for material requirements planning (MRP) systems includes which of the following? I. Bills of material II. Routing file III. Inventory status data
answer
I & III
question
Material requirements planning (MRP) takes place in the front-end systems of manufacturing planning and control system.
answer
false (in the engine)
question
Material requirements planning (MRP) systems perform which of these functions? I. translating the overall production plan into detailed steps II. providing information for capacity planning III. providing information for staffing plans
answer
I & II
question
In a material requirements planning (MRP) system, gross requirements (demand) are.
answer
anticipated future usage or demand for the item during each period
question
In a material requirements planning (MRP) system, scheduled receipts are.
answer
existing replenishment orders for the item due at the beginning of each period
question
In a material requirements planning (MPS) system, the projected available balance is
answer
current and projected inventory status for the item at the end of the period
question
In a material requirements planning (MRP) system, gross requirements are time phased which means which of the following?
answer
requirements from all periods are stated on a period-by-period basis
question
The precedent relationship shows.
answer
the order in which production steps must be accomplished
question
Front scheduling logic starts each step of the process as late as possible
answer
false (early)
question
Back scheduling logic starts each step of the process as late as possible.
answer
true
question
A lot-for-lot order policy generates orders for a fixed quantity, independent of actual requirements.
answer
false
question
Processing all material requirements planning (MRP) records in a single computer run is called.
answer
regeneration
question
Safety stock is an inventory buffer of stock over and above requirements.
answer
true
question
Safety lead time involved inflating lead times to ensure stock availability.
answer
false
question
In a system where timing of production is uncertain, it would be more appropriate to utilize.
answer
safety lead time
question
Information concerning the specific source of demand is called
answer
pegging information
question
A firm planned order (FPO) can be changed by the material requirements planning (MRP) system without human involvement.
answer
false
question
A commitment to an external supplier (e.g. a purchase order) is represented in the material requirements planning (MRP) system by a
answer
schedule receipt
question
Which of the following is not an action commonly taken by an MRP planner? I. release orders II. confirm inventory counts on incoming shipments III. reconcile MRP errors
answer
II only
question
Order launching occurs when a planned order release is in the action bucket.
answer
true
question
In a well-functioning material requirements planning (MRP) system, what percent of parts would be expected to require planner review (via exception codes) in any given processing cycle?
answer
10-20
question
Exception codes are usually generated for which of the following reasons? I. open order timing/amount not satisfactory II. need for management intervention III. generation of planned orders
answer
I & II
question
Which type of inventory occurs as a result of the time needed to physically move goods from one location to another?
answer
transit stock
question
Which type of inventory occurs as a result of seasonal patterns of demand?
answer
anticipation stock
question
Which of the following are decisions made when managing independent-demand inventories? I. how much to order II. when to order III. amount of scarp associated with production
answer
I & II
question
A measurement that relates inventory levels to product sales?
answer
inventory turnover
question
Which of the following is not a type of cost associated with inventory? I. ordering preparation costs II. inventory carrying costs III. shortage and customer service costs
answer
I, II & III
question
Which of the following are NOT a part of inventory carrying costs? I. cost of capital II. delivery charges III. product obsolescence
answer
II
question
If the cost of ordering decreases, what happens to the economic order quantity (EOQ)?
answer
decreases
question
Assuming that demand is normally distributed, with a standard deviation during lead time of 50 units, what level of safety stock is required to ensure that 95% of order cycles will have no stockouts?
answer
85
question
Assuming that demand is normally distributed, with a mean of 100 units, standard deviation during the lead time is 50 units, and a lead time of 2 periods, what reorder point will guarantee that no more than 10% of order cycles will have one or more stockouts?
answer
165
question
Assuming that demand is normally distributed (mean of 250 units, standard deviation of 75 units per period) and a lead time of 3 periods, what reorder point will guarantee that no more than 5% of order cycles will have one or more stockouts?
answer
1200
question
Assuming that demand is normally distributed (mean of 250 units, standard deviation of 75 units per period) and a lead time of 3 periods (with a standard deviation of 2 periods), what reorder point will guarantee that no more than 5% of order cycles will have one or more stockouts?
answer
1850
question
In a system with a forecast mean absolute deviation (MAD) of 100 units (over the lead time), what level of safety stock would be required to ensure that 90% of order cycles have no stockouts?
answer
160
question
In ABC analysis, the A group will likely contain the most items.
answer
false (c)
question
In ABC analysis, the C group will likely have the highest usage volume (in dollars).
answer
false (a)
question
Order point inventory control methods are generally used for items with what type of demand?
answer
independent
question
Which type of inventory occurs as a result of order quantities being larger than needed to satisfy immediate requirements?
answer
cycle stock