SPM Chapter 5 – Flashcards

Unlock all answers in this set

Unlock answers
question
Scope refers to all the work involved in creating the products of the project and the processes used to create them.
answer
True
question
Deliverables are only product-related, such as a piece of hardware or software.
answer
False
question
Project scope management includes the processes involved in defining and controlling what is or is not included in a project.
answer
True
question
The project's size, complexity, importance, and other factors will not affect how much effort is spent on collecting requirements for scope planning.
answer
False
question
Information from the project charter provides a basis for further defining the project scope.
answer
True
question
Project scope statements should include, at a minimum, a product scope description and detailed information on all project deliverables.
answer
False
question
The scope of a project should be clear and specific from the start.
answer
False
question
Many information technology projects also require detailed functional and design specifications for developing software, which also should be referenced in the detailed scope statement.
answer
True
question
The project scope statement should reference supporting documents, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced.
answer
True
question
The project scope statement provides the basis for planning and managing project schedules, costs, resources, and changes.
answer
False
question
The project scope statement, stakeholder requirements documentation, and organizational process assets are the primary inputs for creating a WBS.
answer
True
question
A WBS is often depicted as a task-oriented pie chart.
answer
False
question
A project team always organizes the WBS around project products.
answer
False
question
A work package represents the level of work that the project manager monitors and controls.
answer
True
question
A work package should always represent less than 80 hours of work.
answer
False
question
You can only enter duration estimates for work packages.
answer
True
question
It is easy to create a good WBS.
answer
False
question
The tasks in a WBS do not have to be developed as a sequential list of steps.
answer
True
question
If you want some time-based flow for the work, you can create a WBS using the project management process groups of initiating, planning, executing, monitoring and controlling, and closing as Level 2 in the WBS.
answer
True
question
The executing tasks of the WBS remain constant from project to project.
answer
False
question
Many organizations provide guidelines and templates for developing WBSs.
answer
True
question
Mind mapping allows people to write and even draw pictures of ideas in a nonlinear format.
answer
True
question
The format of the WBS dictionary should be the same from project to project.
answer
False
question
A unit of work should appear at only one place in the WBS.
answer
True
question
Lack of user input leads to problems with managing scope creep and controlling change.
answer
True
question
The term ____ describes a product produced as part of a project. a. end-product c. deliverable b. scope d. outcome
answer
deliverable
question
There are ____ main processes involved in project scope management. a. three c. five b. four d. six
answer
five
question
____ involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them. a. Collecting requirements c. Controlling scope b. Defining scope d. Verifying scope
answer
Collecting requirements
question
____ involves reviewing the project charter, requirements documents, and organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved. a. Planning scope c. Controlling scope b. Defining scope d. Verifying scope
answer
Defining scope
question
____ involves formalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables during this process. a. Planning scope c. Controlling scope b. Defining scope d. Verifying scope
answer
Verifying scope
question
The main outputs of ____ are accepted deliverables and change requests. a. planning scope c. defining scope b. controlling scope d. verifying scope
answer
verifying scope
question
____ involves controlling changes to project scope throughout the life of the project, which is a challenge on many information technology projects. a. Planning scope c. Controlling scope b. Defining scope d. Verifying scope
answer
Controlling scope
question
Good ____ is very important to project success because it helps improve the accuracy of time, cost, and resource estimates, it defines a baseline for performance measurement and project control, and it aides in communicating clear work responsibilities. a. scope planning c. scope definition b. scope management d. scope verification
answer
scope definition
question
An up-to-date ____ is an important document for developing and confirming a common understanding of the project scope. a. scope management plan c. WBS b. project scope statement d. decomposition
answer
project scope statement
question
Of the following constraints, it is most difficult to describe, agree upon, and meet the ____ goal of many projects. a. scope c. cost b. time d. technical
answer
scope
question
A(n) ____ is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. a. project charter c. project scope statement b. business case d. work breakdown structure
answer
work breakdown structure
question
In the WBS, the name of the entire project is the top box, called Level ____. a. 0 c. 2 b. 1 d. 3
answer
1
question
In the WBS, the main groupings for the work are listed in Level ____. a. 0 c. 2 b. 1 d. 3
answer
2
question
Many people confuse tasks on a WBS with ____. a. goals c. responsibilities b. objectives d. specifications
answer
specifications
question
The ____ tasks vary the most from project to project. a. closing c. planning b. monitoring and controlling d. executing
answer
executing
question
The ____ should list and describe all of the deliverables required for the project. a. project charter c. WBS b. scope statement d. Gantt chart
answer
scope statement
question
In the ____, you use a similar project's WBS as a starting point. a. top-down approach c. mind-mapping approach b. bottom-up approach d. analogy approach
answer
analogy approach
question
The ____ approach involves refining the work into greater and greater levels of detail. a. analogy c. top-down b. bottom-up d. mind mapping
answer
bottom-up
question
The ____ approach is best suited to project managers who have vast technical insight and a big-picture perspective. a. analogy c. top-down b. bottom-up d. mind mapping
answer
bottom-up
question
Project managers often use the ____ approach for projects that represent entirely new systems or approaches to doing a job, or to help create buy-in and synergy with a project team. a. analogy c. top-down b. bottom-up d. mind mapping
answer
bottom-up
question
After discovering WBS items and structure using the ____ technique, you could then translate the information into chart or tabular form. a. analogy c. top-down b. bottom-up d. mind mapping
answer
mind mapping
question
____ involves formal acceptance of the completed project scope by the stakeholders. a. Scope verification c. Scope control b. Scope planning d. Scope definition
answer
Scope verification
question
The goal of ____ is to influence the factors that cause scope changes, assure changes are processed according to procedures developed as part of integrated change control, and manage changes when they occur. a. scope verification c. scope planning b. scope control d. scope definition
answer
scope control
question
____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them. a. Prototyping c. RAD b. JAD d. Use case modeling
answer
Use case modeling
question
____ uses highly organized and intensive workshops to bring together project stakeholders—the sponsor, users, business analysts, programmers, and so on—to jointly define and design information systems. a. Prototyping c. RAD b. JAD d. Use case modeling
answer
JAD COMPLETION
question
Factors such as user involvement, clear business objectives, a minimized or clearly defined scope, and firm basic requirements, are elements of ____________________.
answer
project scope management
question
The main outputs of ____________________ are the project scope statement and updates to project documents.
answer
scope definition
question
Creating the ____________________ involves subdividing the major project deliverables into smaller, more manageable components.
answer
WBS - work breakdown structure - work breakdown structure (WBS)
question
Key inputs for preparing the project scope statement include the ____________________, requirements documentation, and organizational process assets such as policies and procedures related to scope statements as well as project files and lessons learned from previous, similar projects.
answer
project charter
question
The main outputs of scope definition are the ____________________ and project document updates.
answer
project scope statement
question
The project scope statement should reference ____________________, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced.
answer
supporting documents
question
A(n) ____________________ project scope statement is an important document for developing and confirming a common understanding of the project scope.
answer
up-to-date - up to date -
question
Some project management experts believe that work should not be done on a project if it is not included in the ____________________.
answer
WBS - work breakdown structure - work breakdown structure (WBS)
question
PMI uses the term "___________________" to describe each level of work in the WBS.
answer
task
question
A(n) ____________________ is a task at the lowest level of the WBS.
answer
work package
question
If ____________________ for developing a WBS exist, it is very important to follow them.
answer
guidelines
question
In the ____________________ approach, team members first identify as many specific tasks related to the project as possible.
answer
bottom-up
question
____________________ is a technique that uses branches radiating out from a core idea to structure thoughts and ideas.
answer
Mind mapping
question
____________________ can be used for developing WBSs using the top-down or bottom-up approach.
answer
Mind mapping
question
A(n) ____________________ is a document that describes detailed information about each WBS item.
answer
WBS dictionary
question
The approved project scope statement and its associated WBS and WBS dictionary form the ____________________.
answer
scope baseline
question
____________________ is the tendency for project scope to keep getting bigger and bigger.
answer
Scope creep
question
The main tool for performing scope verification is ____________________.
answer
inspection
question
____________________ involves controlling changes to the project scope.
answer
Scope control
question
____________________ is the difference between planned and actual performance.
answer
Variance
Get an explanation on any task
Get unstuck with the help of our AI assistant in seconds
New